1The problem
The BMPFast sample project no BMP upstream retention: a large catchment with no treatment drains to a small catchment whose retention basin treats both.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 2 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Specified Removal Efficiency | BMPFast sample project |
| Specified removal: TN / TP | 75 % / 75 % | BMPFast sample project |
| Catchment 1: downstream (Watershed Characteristics) | ||
| Land use, pre / post | User Defined Values / User Defined Values | BMPFast sample project |
| Area, pre / post | 1 / 1 ac | BMPFast sample project |
| Non-DCIA curve number, pre / post | 70 / 70 | BMPFast sample project |
| DCIA, pre / post | 24.33 / 24.33 % | BMPFast sample project |
| EMC TN, pre / post | 0.811 / 0.811 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.811 / 0.811 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| BMP used in routing | Retention: retention volume 4.167 ac-ft | BMPFast sample project |
| Routes to | the Outlet | BMPFast sample project |
| Catchment 2: upstream (Watershed Characteristics) | ||
| Land use, pre / post | User Defined Values / User Defined Values | BMPFast sample project |
| Area, pre / post | 99 / 99 ac | BMPFast sample project |
| Non-DCIA curve number, pre / post | 70 / 70 | BMPFast sample project |
| DCIA, pre / post | 24.33 / 24.33 % | BMPFast sample project |
| EMC TN, pre / post | 0.811 / 0.811 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.811 / 0.811 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| BMP used in routing | No Treatment (no BMP) | BMPFast sample project |
| Routes to | Catchment 1 | BMPFast sample project |
Find: the loads leaving the site when the catchments are routed through each other, and how BMPFast treats the chain.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name no BMP upstream retention; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis Specified Removal Efficiency; Nitrogen Removal Performance Specified 75 %; Phosphorus Removal Performance Specified 75 %. (To follow along with the finished project instead, choose File ▸ Open and open
routing-no-treatment-to-retention.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name downstream and enter: Land use (pre) User Defined Values; Land use (post) User Defined Values; Area (pre) 1.00 ac; Area (post) 1.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 70.00; DCIA (pre) 24.33 %; DCIA (post) 24.33 %; Nitrogen EMC (pre) 0.811 mg/L; Nitrogen EMC (post) 0.811 mg/L; Phosphorus EMC (pre) 0.811 mg/L; Phosphorus EMC (post) 0.811 mg/L. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.240; Runoff volume (post) 1.000 ac-ft/yr; Nitrogen load (post) 1.000 kg/yr; Phosphorus load (post) 1.000 kg/yr.

The catchment downstream: its Entry tab. With downstream selected, press Add Treatment and choose Retention. On its Entry tab type the Treatment name Retention (BMPFast 2 starts it as “Retention 1”) and enter: Provided retention volume 4.167 ac-ft; Time to recover the design volume 72.00 hr. The results are calculated as you type: Treatment depth 50.004 in; Nitrogen removal provided 99.00 %; Phosphorus removal provided 99.00 %. These are the treatment alone, on its own catchment’s runoff; the routing calculates it again with the water that drains to it from upstream, so the routing’s numbers below differ.

The treatment Retention: its Entry tab. Open the treatment’s Report tab: its inputs and removal in this catchment, as a report to print or save.

The treatment Retention: its Report tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name upstream and enter: Land use (pre) User Defined Values; Land use (post) User Defined Values; Area (pre) 99.00 ac; Area (post) 99.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 70.00; DCIA (pre) 24.33 %; DCIA (post) 24.33 %; Nitrogen EMC (pre) 0.811 mg/L; Nitrogen EMC (post) 0.811 mg/L; Phosphorus EMC (pre) 0.811 mg/L; Phosphorus EMC (post) 0.811 mg/L. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.240; Runoff volume (post) 99.017 ac-ft/yr; Nitrogen load (post) 99.014 kg/yr; Phosphorus load (post) 99.014 kg/yr.

The catchment upstream: its Entry tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Runoff from upstream catchments downstream Outlet Retention Treated with this catchment's own runoff upstream downstream No treatment A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Catchment | Runoff (ac-ft/yr) | TN load (kg/yr) | TP load (kg/yr) | BMP → routes to |
|---|---|---|---|---|
| 1. downstream | 1.000 | 1.000 | 1.000 | Retention → the Outlet |
| 2. upstream | 99.017 | 99.014 | 99.014 | No Treatment → Catchment 1 |
| Result | Value |
|---|---|
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 100.014 → 24.695 kg/yr |
| TP load: catchments → outlet | 100.014 → 24.695 kg/yr |
| Provided removal TN / TP | 75.3 % / 75.3 % |
| Required removal TN / TP (Maximum % Removal) | 75.0 % (met) / 75.0 % (met) |
Strands found by BMPFast (a strand is a run of catchments in series that BMPFast may calculate as one system):
- Catchments 2 → 1 form one strand, “Upstream No Treatment routed to Retention”: BMPFast calculates them as one system (TN in 100.014 kg/yr, removal 75.31 %, out 24.695 kg/yr).
The Full Routing Diagram report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 24.695 kg/yr | 24.695 kg/yr | same |
| Phosphorus leaving the site | 24.695 kg/yr | 24.695 kg/yr | same |
| Site removal, nitrogen | 75.308 % | 75.308 % | same |
| Site removal, phosphorus | 75.308 % | 75.308 % | same |
| downstream: Retention removal, nitrogen | 75.308 % | 75.308 % | same |
| downstream: Retention removal, phosphorus | 75.308 % | 75.308 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Loads.
Each catchment’s load is EMC × runoff × 1.233 (Equation 9-2). Together:
| TN 1.000 + 99.014 | = 100.014 kg/yr (program 100.014) |
TP 100.014 kg/yr (program 100.014).
No treatment upstream of retention (the strand rule).
BMPFast finds the strand “Upstream No Treatment routed to Retention”. The basin of Catchment 1 receives the runoff of both catchments, so the strand is one retention system for the whole drainage area: its 4.167 ac-ft over all 100 ac is a treatment depth of 4.167 × 12 / 100 = 0.500 in, and the retention tables at that depth give the system removal, 75.31 %.
| TN out | = 100.014 × (1 − 75.31 / 100) |
| = 24.695 kg/yr (program 24.695). |
This sample project is built so the total load is 100 kg/yr (both EMCs 0.811 mg/L), so the outlet load in kg/yr is the percentage not removed. See Strand Based Routing for No Treatment to Retention.
5Files
- routing-no-treatment-to-retention.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- routing-no-treatment-to-retention.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Full Routing Diagram (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Retention (downstream) (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Retention — calculations (downstream) (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
- Routing (help page 220)
- Catchment Configurations (help page 196)
- Strand Based Routing for Wet Detention in Series (help page 4823)
- Strand Based Routing for Retention in Series (help page 4824)
- Strand Based Routing for No Treatment to Detention (help page 4833)
- Strand Based Routing for No Treatment to Retention (help page 4834)
- Link to Solution in BMPFast Version 1
- All BMPFast 2 sample problems
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.