Routing: untreated catchment into a retention basin

BMPFast sample project: 99 ac with no treatment routed to a 1 ac catchment with retention.

1The problem

The BMPFast sample project no BMP upstream retention: a large catchment with no treatment drains to a small catchment whose retention basin treats both.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Specified Removal EfficiencyBMPFast sample project
Specified removal: TN / TP75 % / 75 %BMPFast sample project
Catchment 1: downstream (Watershed Characteristics)
Land use, pre / postUser Defined Values / User Defined ValuesBMPFast sample project
Area, pre / post1 / 1 acBMPFast sample project
Non-DCIA curve number, pre / post70 / 70BMPFast sample project
DCIA, pre / post24.33 / 24.33 %BMPFast sample project
EMC TN, pre / post0.811 / 0.811 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.811 / 0.811 mg/LBMPFast land use table (AH Vol I Table 9.2)
BMP used in routingRetention: retention volume 4.167 ac-ftBMPFast sample project
Routes tothe OutletBMPFast sample project
Catchment 2: upstream (Watershed Characteristics)
Land use, pre / postUser Defined Values / User Defined ValuesBMPFast sample project
Area, pre / post99 / 99 acBMPFast sample project
Non-DCIA curve number, pre / post70 / 70BMPFast sample project
DCIA, pre / post24.33 / 24.33 %BMPFast sample project
EMC TN, pre / post0.811 / 0.811 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.811 / 0.811 mg/LBMPFast land use table (AH Vol I Table 9.2)
BMP used in routingNo Treatment (no BMP)BMPFast sample project
Routes toCatchment 1BMPFast sample project

Find: the loads leaving the site when the catchments are routed through each other, and how BMPFast treats the chain.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name no BMP upstream retention; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis Specified Removal Efficiency; Nitrogen Removal Performance Specified 75 %; Phosphorus Removal Performance Specified 75 %. (To follow along with the finished project instead, choose File ▸ Open and open routing-no-treatment-to-retention.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name downstream and enter: Land use (pre) User Defined Values; Land use (post) User Defined Values; Area (pre) 1.00 ac; Area (post) 1.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 70.00; DCIA (pre) 24.33 %; DCIA (post) 24.33 %; Nitrogen EMC (pre) 0.811 mg/L; Nitrogen EMC (post) 0.811 mg/L; Phosphorus EMC (pre) 0.811 mg/L; Phosphorus EMC (post) 0.811 mg/L. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.240; Runoff volume (post) 1.000 ac-ft/yr; Nitrogen load (post) 1.000 kg/yr; Phosphorus load (post) 1.000 kg/yr.

    The catchment downstream: its Entry tab.
    The catchment downstream: its Entry tab.
  3. With downstream selected, press Add Treatment and choose Retention. On its Entry tab type the Treatment name Retention (BMPFast 2 starts it as “Retention 1”) and enter: Provided retention volume 4.167 ac-ft; Time to recover the design volume 72.00 hr. The results are calculated as you type: Treatment depth 50.004 in; Nitrogen removal provided 99.00 %; Phosphorus removal provided 99.00 %. These are the treatment alone, on its own catchment’s runoff; the routing calculates it again with the water that drains to it from upstream, so the routing’s numbers below differ.

    The treatment Retention: its Entry tab.
    The treatment Retention: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal in this catchment, as a report to print or save.

    The treatment Retention: its Report tab.
    The treatment Retention: its Report tab.
  5. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name upstream and enter: Land use (pre) User Defined Values; Land use (post) User Defined Values; Area (pre) 99.00 ac; Area (post) 99.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 70.00; DCIA (pre) 24.33 %; DCIA (post) 24.33 %; Nitrogen EMC (pre) 0.811 mg/L; Nitrogen EMC (post) 0.811 mg/L; Phosphorus EMC (pre) 0.811 mg/L; Phosphorus EMC (post) 0.811 mg/L. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.240; Runoff volume (post) 99.017 ac-ft/yr; Nitrogen load (post) 99.014 kg/yr; Phosphorus load (post) 99.014 kg/yr.

    The catchment upstream: its Entry tab.
    The catchment upstream: its Entry tab.
  6. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment usedRunoff from upstream catchments
    downstreamOutletRetentionTreated with this catchment's own runoff
    upstreamdownstreamNo treatment

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  7. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

CatchmentRunoff (ac-ft/yr)TN load (kg/yr)TP load (kg/yr)BMP → routes to
1. downstream1.0001.0001.000Retention → the Outlet
2. upstream99.01799.01499.014No Treatment → Catchment 1
ResultValue
Site (all catchments, at the outlet)
TN load: catchments → outlet100.014 → 24.695 kg/yr
TP load: catchments → outlet100.014 → 24.695 kg/yr
Provided removal TN / TP75.3 % / 75.3 %
Required removal TN / TP (Maximum % Removal)75.0 % (met) / 75.0 % (met)

Strands found by BMPFast (a strand is a run of catchments in series that BMPFast may calculate as one system):

  • Catchments 2 → 1 form one strand, “Upstream No Treatment routed to Retention”: BMPFast calculates them as one system (TN in 100.014 kg/yr, removal 75.31 %, out 24.695 kg/yr).

The Full Routing Diagram report

Open this report on its own page.

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site24.695 kg/yr24.695 kg/yrsame
Phosphorus leaving the site24.695 kg/yr24.695 kg/yrsame
Site removal, nitrogen75.308 %75.308 %same
Site removal, phosphorus75.308 %75.308 %same
downstream: Retention removal, nitrogen75.308 %75.308 %same
downstream: Retention removal, phosphorus75.308 %75.308 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

Loads.

Each catchment’s load is EMC × runoff × 1.233 (Equation 9-2). Together:

TP 100.014 kg/yr (program 100.014).

No treatment upstream of retention (the strand rule).

BMPFast finds the strand “Upstream No Treatment routed to Retention”. The basin of Catchment 1 receives the runoff of both catchments, so the strand is one retention system for the whole drainage area: its 4.167 ac-ft over all 100 ac is a treatment depth of 4.167 × 12 / 100 = 0.500 in, and the retention tables at that depth give the system removal, 75.31 %.

This sample project is built so the total load is 100 kg/yr (both EMCs 0.811 mg/L), so the outlet load in kg/yr is the percentage not removed. See Strand Based Routing for No Treatment to Retention.

5Files

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.