1The problem

A 10-acre pasture becomes a single-family subdivision in Zone 2. Its wet pond has a 3.0 ac-ft permanent pool and a littoral zone. Under the performance standard Specified Removal Efficiency, the program requires the TN and TP percentages entered for the project, for example a TMDL or BMAP criterion (AH Vol I 8.3.4(b), or as the Agency directs). Every analysis type uses the same site and pond, so the problems can be compared side by side.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Specified Removal EfficiencySite (illustrative)
Specified removal: TN / TP70 % / 85 %Site (illustrative)
Catchment 1: Subdivision (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilySite (illustrative)
Area, pre / post10 / 10 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 75Site (illustrative)
DCIA, pre / post0 / 25 %Site (illustrative)
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
Wet pond: permanent pool, littoral zone3.0 ac-ft, yesDesign (illustrative)

Find: the removal the standard requires, the removal provided, and whether the standard is met.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Analysis type: Specified Removal Efficiency; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis Specified Removal Efficiency; Nitrogen Removal Performance Specified 70 %; Phosphorus Removal Performance Specified 85 %. (To follow along with the finished project instead, choose File ▸ Open and open analysis-specified-removal.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Subdivision and enter: Land use (pre) Agricultural - Pasture; Land use (post) Single-Family; Area (pre) 10.00 ac; Area (post) 10.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 75.00; DCIA (post) 25.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.262; Runoff volume (post) 10.917 ac-ft/yr; Nitrogen load (post) 23.825 kg/yr; Phosphorus load (post) 4.402 kg/yr.

    The catchment Subdivision: its Entry tab.
    The catchment Subdivision: its Entry tab.
  3. With Subdivision selected, press Add Treatment and choose Wet Detention. On its Entry tab type the Treatment name Wet Detention (BMPFast 2 starts it as “Wet Detention 1”) and enter: Permanent pool volume 3.000 ac-ft; How the littoral zone counts Littoral zone credit (BMPFast 2); There is a littoral zone Yes; Littoral zone credit 10.0 %. The results are calculated as you type: Average residence time 100.31 days; Permanent pool volume for 31 days residence 0.93 ac-ft; Nitrogen removal provided 51.92 %; Phosphorus removal provided 84.02 %.

    The treatment Wet Detention: its Entry tab.
    The treatment Wet Detention: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

    The treatment Wet Detention: its Report tab.
    The treatment Wet Detention: its Report tab.
  5. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment used
    SubdivisionOutletWet Detention

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  6. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.032 / 0.262
Runoff, pre / post1.350 / 10.917 ac-ft/yr
TN load, pre / post5.044 / 23.825 kg/yr
TP load, pre / post0.987 / 4.402 kg/yr
Wet Detention: computed by BMPFast
Annual residence time100.3 days
Hydraulic capture efficiency74.00 %
Provided TN / TP removal51.92 % / 84.02 %
TN load in → out23.825 → 11.455 kg/yr
TP load in → out4.402 → 0.704 kg/yr
Requirement (computed by BMPFast)
Specified by the standard, TN / TP70.0 % / 85.0 %
Post = pre removal, TN / TP78.83 % / 77.57 %
Maximum % Removal used (status bar), TN / TP70.00 % / 85.00 %
Site (all catchments, at the outlet)
TN load: catchments → outlet23.825 → 11.455 kg/yr
TP load: catchments → outlet4.402 → 0.704 kg/yr
Provided removal TN / TP51.9 % / 84.0 %
Required removal TN / TP (Maximum % Removal)70.0 % (not met) / 85.0 % (not met)

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site11.455 kg/yr13.837 kg/yrdiffers
Phosphorus leaving the site0.704 kg/yr1.144 kg/yrdiffers
Site removal, nitrogen51.920 %41.920 %differs
Site removal, phosphorus84.017 %74.017 %differs
Subdivision: Wet Detention removal, nitrogen51.920 %41.920 %differs
Subdivision: Wet Detention removal, phosphorus84.017 %74.017 %differs

BMPFast 2 gives a different number for: Nitrogen leaving the site, Phosphorus leaving the site, Site removal, nitrogen, Site removal, phosphorus, Subdivision: Wet Detention removal, nitrogen, Subdivision: Wet Detention removal, phosphorus. See the notes below the table.

When BMPFast 2 opened the v1 file it said:

  • Subdivision, Wet Detention: BMPFast 2 takes the wet pond equations as a pond without a littoral zone, and adds a littoral zone credit of 10 percentage points (Appendix O's maximum) to this pond's removal, so it is higher than v1 shows; lower Littoral zone credit if your permit reviewer allows less. To calculate as v1, choose "Reduce without a littoral zone (v1)" in How the littoral zone counts (Design values) on the treatment's Entry tab.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Post = pre removal.

To bring the post-development load back to the pre-development load:

This standard does not compare with the pre-development load, so the required removal is the specified one.

Annual residence time.

Removal. The wet detention equations of AH Vol I Appendix O at 100.3 days (TN 41.92 %, TP 74.02 %), with the littoral zone credit of 10 percentage points added to each because the pond has a littoral zone (BMPFast 2 takes the equations as a pond without one), give TN 51.92 % and TP 84.02 %. The worksheet’s Equations page shows each equation with these numbers; the Wet Detention Methodology explains them.

Load out.

5Files

  • analysis-specified-removal.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
  • analysis-specified-removal.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
  • Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Wet Detention (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Wet Detention — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.