1The problem

Before development a 40-acre farm is 25 ac pasture (TP 0.593 mg/L, CN 69), 10 ac citrus (0.18, CN 60) and 5 ac wet flatwoods (0.021, CN 70).

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 4Zone map (help page 815)
Mean annual rainfall52 inMean annual rainfall map (help page 815)
Performance standard (analysis type)All sites non-exemptedSite (illustrative)
Catchment 1: Farm (Watershed Characteristics)
Land use, pre / postUser Defined Values / Single-FamilySite (illustrative)
Area, pre / post40 / 40 acSite (illustrative)
Non-DCIA curve number, pre / post65 / 75Site (illustrative)
DCIA, pre / post0 / 25 %Site (illustrative)
EMC TN, pre / post2.500 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.442 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
Parts of the catchment
25 acEMC 0.593 mg/L, CN 69Land use table (AH Vol I Table 9.2)
10 acEMC 0.18 mg/L, CN 60Land use table (AH Vol I Table 9.2)
5 acEMC 0.021 mg/L, CN 70Land use table (AH Vol I Table 9.2)

Find: the composite TP EMC and the load it gives.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Composite EMC: pre-development, phosphorus; Meteorological zone Florida Zone 4; Mean annual rainfall 52.00 in; Type of analysis All sites non-exempted. (To see the finished project instead, choose File ▸ Open and open composite-emc-phosphorus.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left) and select the new catchment in the tree. On its Entry tab type the name Farm and enter: Land use (pre) User Defined Values; Land use (post) Single-Family; Area (pre) 40.00 ac; Area (post) 40.00 ac; Non-DCIA curve number (pre) 65.00; Non-DCIA curve number (post) 75.00; DCIA (post) 25.00 %; Nitrogen EMC (pre) 2.500 mg/L; Phosphorus EMC (pre) 0.400 mg/L. With the pre-development land use User Defined Values the EMC boxes take what you type; the phosphorus EMC 0.400 mg/L is a first guess for the whole catchment, whose parts have different land uses.

  3. Open the catchment’s Composite CN (optional) tab. In the pre-development table type each part’s area, non-DCIA curve number and phosphorus EMC: 25 ac with CN 69 and TP 0.593 mg/L, 10 ac with CN 60 and TP 0.18 mg/L, 5 ac with CN 70 and TP 0.021 mg/L. The curve number is needed too: the EMCs are weighted by each part’s runoff, which comes from its curve number. The line Composite shows the composite phosphorus EMC, 0.442 mg/L. Press Use these EMCs (it is available only with the land use User Defined Values).

    The catchment’s Composite CN (optional) tab: the pre-development parts with their phosphorus EMCs, and the composite.
    The catchment’s Composite CN (optional) tab: the pre-development parts with their phosphorus EMCs, and the composite.
  4. BMPFast 2 goes back to the Entry tab with the pre-development phosphorus EMC now 0.442 mg/L. The table has no nitrogen EMCs, so the nitrogen EMC stays as typed, 2.500 mg/L.

    The catchment’s Entry tab with the composite EMC.
    The catchment’s Entry tab with the composite EMC.
  5. At the bottom of the Entry tab, under Calculated, the phosphorus load is worked out with the composite EMC. Save the project with File ▸ Save; compare it with composite-emc-phosphorus.bmpf under Files.

    The bottom of the Entry tab: the loads with the composite EMC.
    The bottom of the Entry tab: the loads with the composite EMC.

3Results

ResultValue
Composite phosphorus EMC0.442 mg/L
Phosphorus EMC put into the Entry tab0.442 mg/L
Nitrogen EMC after Use these EMCs2.500 mg/L

The catchment before and after (pre-development)

EMC typedComposite EMC
Phosphorus EMC (mg/L)0.4000.442
Runoff volume (ac-ft/yr)9.3609.360
Nitrogen load (kg/yr)28.85228.852
Phosphorus load (kg/yr)4.6165.101

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site104.785 kg/yr104.785 kg/yrsame
Phosphorus leaving the site19.359 kg/yr19.359 kg/yrsame
Site removal, nitrogen0.000 %0.000 %same
Site removal, phosphorus0.000 %0.000 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

PartArea (ac)Non-DCIA CNTP EMC (mg/L)Runoff coefficient CArea-weighted C
Part 125690.5930.06760.0422
Part 210600.1800.04000.0100
Part 35700.0210.07100.0089

Method.

The composite EMC is weighted by runoff, not by area: each part’s weight is its area × its annual runoff coefficient (the area-weighted C column).

A part with more runoff counts for more (AH Vol I 9.2.2 a; help page 819).

The same table is also under Calculators ▸ Composite EMC, for working out an EMC without putting it into a catchment.

5Files

  • composite-emc-phosphorus.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
  • composite-emc-phosphorus.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
  • Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.