Example Problem 3: B&G CTS12 after the basin, targets 85 / 90 %.

1The problem

The BMPFast sample project Example Problem 3: the retention basin (75 %) is followed by a surface discharge filter with B&G CTS12 media. Size the filter for 85 % TN and 90 % TP.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 4Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Specified Removal EfficiencyBMPFast sample project
Specified removal: TN / TP75 % / 75 %BMPFast sample project
Catchment 1: catchment 1 (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilyBMPFast sample project
Area, pre / post11 / 11 acBMPFast sample project
Non-DCIA curve number, pre / post50 / 65BMPFast sample project
DCIA, pre / post0 / 25 %BMPFast sample project
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)

Find: the filter surface area that meets the removal targets with the upstream BMP, and the treatment depth it gives the filter.

2Steps in BMPFast 2

  1. Start BMPFast 2, choose File ▸ Open and open filter-sizing-after-retention.bmpf (under Files below; it is the BMPFast sample project this problem starts from, saved by BMPFast 2). The tree on the left shows the project, its catchments and their treatments, its routing, and the Calculators. The project’s Entry tab (General Site Information) shows the zone, the rainfall and the type of analysis.

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. In the tree open Calculators and select Surface Discharge Filter Sizing. On its Entry tab, under Filter and what feeds it, choose the Catchment catchment 1, the Surface Discharge Filter Surface Discharge Filter, the Upstream treatment Retention and the Filter media B&G CTS12. BMPFast 2 says what the upstream treatment passes on: “Removes nitrogen 75.0 %, phosphorus 75.0 %; captures 75.0 %, so 2.749 of 11.000 ac drains to the filter.” Under Targets, type 85 % in Nitrogen removal to meet and 90 % in Phosphorus removal to meet.

    Surface Discharge Filter Sizing: the filter, what feeds it, and the targets.
    Surface Discharge Filter Sizing: the filter, what feeds it, and the targets.
  3. Further down the tab, Filter surface area follows the area where both targets are first met: 410 sf, a treatment depth of 0.411 in (the light yellow boxes are worked out by BMPFast 2; type an area of your own to try it). Results gives the filter’s own removal (nitrogen 40.1 %, phosphorus 60.1 %) and the total with the upstream treatment (nitrogen 85.0 %, phosphorus 90.0 % — meets both targets).

    Surface Discharge Filter Sizing: the surface area and the results.
    Surface Discharge Filter Sizing: the surface area and the results.
  4. At the bottom of the tab the chart plots the removal against the surface area, with the targets and the area where both are met. Press Put the sizing into the filter (v1’s Apply). BMPFast 2 says: “Surface Discharge Filter is sized: 410 sf, treatment depth 0.411 in. Total removal: nitrogen 85.0 %, phosphorus 90.0 %, meeting both targets.” Edit ▸ Undo puts the filter back.

    Surface Discharge Filter Sizing: the chart and the button that puts the sizing into the filter.
    Surface Discharge Filter Sizing: the chart and the button that puts the sizing into the filter.
  5. The Calculations tab shows the equations (v1’s Equations button) with this problem’s values.

    Surface Discharge Filter Sizing: the Calculations tab.
    Surface Discharge Filter Sizing: the Calculations tab.
  6. Select the filter treatment, Surface Discharge Filter, under catchment 1 in the tree: its Entry tab now has the treatment depth (0.411 in) and the media (B&G CTS12) from the sizing. Save with File ▸ Save.

    The Surface Discharge Filter treatment after the sizing was put into it.
    The Surface Discharge Filter treatment after the sizing was put into it.

3Results

The calculator

On the screenValue
Upstream treatmentRetention
UpstreamRemoves nitrogen 75.0 %, phosphorus 75.0 %; captures 75.0 %, so 2.749 of 11.000 ac drains to the filter.
Filter mediaB&G CTS12
Treatment rate0.052 gpm/sf
Nitrogen removal to meet85.0 %
Phosphorus removal to meet90.0 %
Filter surface area410 sf
Treatment depth0.411 in
Filter (media) removalnitrogen 40.1 %, phosphorus 60.1 %
Total removal (upstream + filter)nitrogen 85.0 %, phosphorus 90.0 % — meets both targets
Where both targets are met410 sf (treatment depth 0.411 in)

The filter treatment

The filter after Put the sizing into the filterValue
Filter surface area410 sf
Treatment depth0.411 in
Filter mediaB&G CTS12
Capture at that depth66.80 %
Filter removal, nitrogen / phosphorus (on its own)40.08 % / 60.12 %

BMPFast (v1) gave 408.4 sf for the area where both targets are met; BMPFast 2 gives 409.8 sf. Both read the crossing off a 50-step sweep of the chart, by straight lines between its points; v1 drew its chart over a different range, so the points fall elsewhere and the answers differ by 1.4 sf (0.35 %). Neither is a different method.

The calculator’s report

Open this report on its own page · The Calculations tab.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site6.150 kg/yr6.150 kg/yrsame
Phosphorus leaving the site1.136 kg/yr1.136 kg/yrsame
Site removal, nitrogen75.006 %75.006 %same
Site removal, phosphorus75.006 %75.006 %same
catchment 1: Retention removal, nitrogen75.006 %75.006 %same
catchment 1: Retention removal, phosphorus75.006 %75.006 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

Treatment depth.

The filter’s depth is the volume it can filter, spread over the area that drains to it. Put into the filter, its Entry tab shows 0.411 in; the retention tables at that depth give a capture of 66.80 %, and × the media’s 60 % / 90 % that gives the filter’s own nitrogen 40.08 % and phosphorus 60.12 %:

Total. The upstream treatment: Removes nitrogen 75.0 %, phosphorus 75.0 %; captures 75.0 %, so 2.749 of 11.000 ac drains to the filter. With it removing e, the total is e + f (1 − e/100), the treatment train of AH Vol I 9.5.1; the Calculations tab shows it with these numbers (Media and Filtration Methodology).