All programs › BMPFast › BMPFast 2 sample problems
Permeable concrete parking with a stone reservoir
0.5 ac of permeable concrete over #57 rock; BMP Analysis, Zone 3.
Help: Permeable Pavement (help page 300) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
Half an acre of a 2-acre parking lot is built as permeable concrete (6 in) over 12 in of #57 rock; the rest of the lot drains onto it.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 3 | Zone map (help page 815) |
| Mean annual rainfall | 54 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | BMP Analysis | Site (illustrative) |
| Catchment 1: Commercial site (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / High-Intensity Commercial | Site (illustrative) |
| Area, pre / post | 2 / 2 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 80 | Site (illustrative) |
| DCIA, pre / post | 0 / 70 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 2.400 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.345 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Layers (thickness, sustainable void) | #57 rock(non-calcareous) 12 in, 21 %, Concrete Permeable Pavement 6 in, 25 % | Design; voids from the program’s pavement table |
| Permeable Pavement (worksheet) | ||
| Permeable Pavement Area | 0.5 ac | Design (illustrative) |
| Time to recover design volume | 72 hr | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Permeable pavement: commercial parking; Meteorological zone Florida Zone 3; Mean annual rainfall 54.00 in; Type of analysis BMP Analysis. (To follow along with the finished project instead, choose File ▸ Open and open
permeable-pavement-parking.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Commercial site and enter: Land use (pre) Undeveloped - Mesic Flatwoods; Land use (post) High-Intensity Commercial; Area (pre) 2.00 ac; Area (post) 2.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 80.00; DCIA (post) 70.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.596; Runoff volume (post) 5.364 ac-ft/yr; Nitrogen load (post) 15.873 kg/yr; Phosphorus load (post) 2.282 kg/yr.

The catchment Commercial site: its Entry tab. With Commercial site selected, press Add Treatment and choose Permeable Pavement. On its Entry tab type the Treatment name Permeable Pavement (BMPFast 2 starts it as “Permeable Pavement 1”) and enter: Permeable pavement area 0.50 ac; Time to recover the design volume 72.00 hr; Concrete Permeable Pavement thickness 6.00 in; #57 rock(non-calcareous) thickness 12.00 in. The results are calculated as you type: Total storage of the pavement 0.167 ac-ft; Treatment depth 1.005 in; Nitrogen removal provided 71.21 %; Phosphorus removal provided 71.21 %.

The treatment Permeable Pavement: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment Permeable Pavement: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Commercial site Outlet Permeable Pavement A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.078 / 0.596 |
| Runoff, pre / post | 0.702 / 5.364 ac-ft/yr |
| TN load, pre / post | 0.941 / 15.873 kg/yr |
| TP load, pre / post | 0.037 / 2.282 kg/yr |
| Permeable Pavement: computed by BMPFast | |
| Treatment depth | 1.005 in |
| Hydraulic capture efficiency | 71.21 % |
| Provided TN / TP removal | 71.21 % / 71.21 % |
| TN load in → out | 15.873 → 4.570 kg/yr |
| TP load in → out | 2.282 → 0.657 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 15.873 → 4.570 kg/yr |
| TP load: catchments → outlet | 2.282 → 0.657 kg/yr |
| Provided removal TN / TP | 71.2 % / 71.2 % |
The BMP report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 4.570 kg/yr | 4.570 kg/yr | same |
| Phosphorus leaving the site | 0.657 kg/yr | 0.657 kg/yr | same |
| Site removal, nitrogen | 71.212 % | 71.212 % | same |
| Site removal, phosphorus | 71.212 % | 71.212 % | same |
| Commercial site: Permeable Pavement removal, nitrogen | 71.212 % | 71.212 % | same |
| Commercial site: Permeable Pavement removal, phosphorus | 71.212 % | 71.212 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.596 × 2.00 ac × 54.0 in / 12 | |
| = 5.364 ac-ft/yr (program 5.364). |
| TN load | = EMC × runoff × 1.233 |
| = 2.400 × 5.364 × 1.233 | |
| = 15.873 kg/yr (program 15.873) |
| TP load | = 0.345 × 5.364 × 1.233 |
| = 2.282 kg/yr (program 2.282). |
1.233 kg is 1 mg/L in 1 ac-ft.
Storage.
| Storage | = pavement area × Σ(layer thickness × sustainable void) / 12 |
| = 0.50 ac × (#57 rock(non-calcareous) 12 in × 21 % + Concrete Permeable Pavement 6 in × 25 % = 4.02 in) / 12 | |
| = 0.1675 ac-ft (program 0.1675). |
Treatment depth.
| Depth | = storage × 12 / area |
| = 0.1675 ac-ft × 12 / 2.00 ac | |
| = 1.005 in (program 1.005). |
The depth is taken over the whole catchment (2.00 ac): the pavement treats the rain falling on it and the runoff of the 1.50 ac draining onto it.
Capture. The retention efficiency tables for Florida Zone 3 at a treatment depth of 1.005 in, non-DCIA CN 80.00 and DCIA 70.0 % give a hydraulic capture of 71.21 % (AH Vol I Appendix O; read the same tables with Calculators ▸ Retention Efficiency Tables, help page 4325). Permeable pavement is a retention BMP: the removal equals the capture.
Load out.
| TN out | = load in × (1 − removal) |
| = 15.873 × (1 − 71.21 / 100) | |
| = 4.570 kg/yr (program 4.570) |
| TP out | = 2.282 × (1 − 71.21 / 100) |
| = 0.657 kg/yr (program 0.657). |
The program’s Equations page
5Files
- permeable-pavement-parking.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- permeable-pavement-parking.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Permeable Pavement (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Permeable Pavement — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.