All programs › BMPFast › BMPFast 2 sample problems
Retention basin for a 10-acre subdivision
A dry retention basin of 1.0 ac-ft; BMP Analysis, Zone 2.
Help: Retention (help page 207) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
A 10-acre pasture becomes a single-family subdivision. All of its runoff goes to a dry retention basin that holds 1.0 ac-ft and recovers in 72 hours.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 2 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | BMP Analysis | Site (illustrative) |
| Catchment 1: Subdivision (Watershed Characteristics) | ||
| Land use, pre / post | Agricultural - Pasture / Single-Family | Site (illustrative) |
| Area, pre / post | 10 / 10 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 61 / 75 | Site (illustrative) |
| DCIA, pre / post | 0 / 25 % | Site (illustrative) |
| EMC TN, pre / post | 3.030 / 1.770 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.593 / 0.327 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Retention System (worksheet) | ||
| Provided Retention Volume | 1.0 ac-ft | Design (illustrative) |
| Time to recover design volume | 72 hr | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Retention: 10 ac subdivision; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis BMP Analysis. (To follow along with the finished project instead, choose File ▸ Open and open
retention-subdivision.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Subdivision and enter: Land use (pre) Agricultural - Pasture; Land use (post) Single-Family; Area (pre) 10.00 ac; Area (post) 10.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 75.00; DCIA (post) 25.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.262; Runoff volume (post) 10.917 ac-ft/yr; Nitrogen load (post) 23.825 kg/yr; Phosphorus load (post) 4.402 kg/yr.

The catchment Subdivision: its Entry tab. With Subdivision selected, press Add Treatment and choose Retention. On its Entry tab type the Treatment name Retention (BMPFast 2 starts it as “Retention 1”) and enter: Provided retention volume 1.000 ac-ft; Time to recover the design volume 72.00 hr. The results are calculated as you type: Treatment depth 1.200 in; Nitrogen removal provided 88.40 %; Phosphorus removal provided 88.40 %.

The treatment Retention: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment Retention: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Subdivision Outlet Retention A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.032 / 0.262 |
| Runoff, pre / post | 1.350 / 10.917 ac-ft/yr |
| TN load, pre / post | 5.044 / 23.825 kg/yr |
| TP load, pre / post | 0.987 / 4.402 kg/yr |
| Retention: computed by BMPFast | |
| Treatment depth | 1.200 in |
| Hydraulic capture efficiency | 88.40 % |
| Provided TN / TP removal | 88.40 % / 88.40 % |
| TN load in → out | 23.825 → 2.764 kg/yr |
| TP load in → out | 4.402 → 0.511 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 23.825 → 2.764 kg/yr |
| TP load: catchments → outlet | 4.402 → 0.511 kg/yr |
| Provided removal TN / TP | 88.4 % / 88.4 % |
The BMP report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 2.764 kg/yr | 2.764 kg/yr | same |
| Phosphorus leaving the site | 0.511 kg/yr | 0.511 kg/yr | same |
| Site removal, nitrogen | 88.400 % | 88.400 % | same |
| Site removal, phosphorus | 88.400 % | 88.400 % | same |
| Subdivision: Retention removal, nitrogen | 88.400 % | 88.400 % | same |
| Subdivision: Retention removal, phosphorus | 88.400 % | 88.400 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.262 × 10.00 ac × 50.0 in / 12 | |
| = 10.917 ac-ft/yr (program 10.917). |
| TN load | = EMC × runoff × 1.233 |
| = 1.770 × 10.917 × 1.233 | |
| = 23.825 kg/yr (program 23.825) |
| TP load | = 0.327 × 10.917 × 1.233 |
| = 4.402 kg/yr (program 4.402). |
1.233 kg is 1 mg/L in 1 ac-ft.
Treatment depth.
| Depth | = retention volume × 12 / area |
| = 1.0000 ac-ft × 12 / 10.00 ac | |
| = 1.200 in (program 1.200). |
Capture. The retention efficiency tables for Florida Zone 2 at a treatment depth of 1.200 in, non-DCIA CN 75.00 and DCIA 25.0 % give a hydraulic capture of 88.40 % (AH Vol I Appendix O; read the same tables with Calculators ▸ Retention Efficiency Tables, help page 4325). For retention every pollutant in the captured water stays on site, so the TN and TP removal equal the capture.
Load out.
| TN out | = load in × (1 − removal) |
| = 23.825 × (1 − 88.40 / 100) | |
| = 2.764 kg/yr (program 2.764) |
| TP out | = 4.402 × (1 − 88.40 / 100) |
| = 0.511 kg/yr (program 0.511). |
The program’s Equations page
5Files
- retention-subdivision.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- retention-subdivision.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Retention (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Retention — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.