BMPs in series: wet pond with stormwater harvesting

BMPFast sample project Example Problem 4: wet detention → harvesting, Net Improvement.

1The problem

The BMPFast sample project Example Problem 4: a wet detention pond whose water is also harvested for irrigation.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 5Zone map (help page 815)
Mean annual rainfall61 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Net ImprovementBMPFast sample project
Catchment 1: catchment #1 (Watershed Characteristics)
Land use, pre / postHighway / HighwayBMPFast sample project
Area, pre / post5.5 / 5.5 acBMPFast sample project
Non-DCIA curve number, pre / post80 / 80BMPFast sample project
DCIA, pre / post40 / 85 %BMPFast sample project
EMC TN, pre / post1.250 / 1.250 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.173 / 0.173 mg/LBMPFast land use table (AH Vol I Table 9.2)
Wet pond area (no loading)0.50 acBMPFast sample project
BMPs in Series
BMP 1: Wet Detentionpermanent pool 2.472 ac-ft, littoral zone yesBMPFast sample project
BMP 2: Stormwater Harvesting1.00 ac-ft, 0.80 in/week over 3.00 acBMPFast sample project

Find: the removal of the series as one system, and the loads leaving the site.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Example #4 with harvesting pond; Meteorological zone Florida Zone 5; Mean annual rainfall 61.00 in; Type of analysis Net Improvement. (To follow along with the finished project instead, choose File ▸ Open and open series-pond-harvesting.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name catchment #1 and enter: Land use (pre) Highway; Land use (post) Highway; Area (pre) 5.50 ac; Area (post) 5.50 ac; Non-DCIA curve number (pre) 80.00; Non-DCIA curve number (post) 80.00; DCIA (pre) 40.00 %; DCIA (post) 85.00 %; Wet pond area (no loading from this area) 0.50 ac. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.710; Runoff volume (post) 18.046 ac-ft/yr; Nitrogen load (post) 27.813 kg/yr; Phosphorus load (post) 3.849 kg/yr.

    The catchment catchment #1: its Entry tab.
    The catchment catchment #1: its Entry tab.
  3. With catchment #1 selected, press Add Treatment and choose Wet Detention. On its Entry tab type the Treatment name Wet Detention (BMPFast 2 starts it as “Wet Detention 1”) and enter: Permanent pool volume 2.472 ac-ft; How the littoral zone counts Littoral zone credit (BMPFast 2); There is a littoral zone Yes; Littoral zone credit 10.0 %; Floating wetland or other MAPs credit 10.00 %. The results are calculated as you type: Average residence time 50.00 days; Permanent pool volume for 31 days residence 1.53 ac-ft; Nitrogen removal provided 55.20 %; Phosphorus removal provided 80.49 %.

    The treatment Wet Detention: its Entry tab.
    The treatment Wet Detention: its Entry tab.
  4. With catchment #1 selected, press Add Treatment and choose Stormwater Harvesting. On its Entry tab type the Treatment name Stormwater Harvesting (BMPFast 2 starts it as “Stormwater Harvesting 1”) and enter: Total contributing area 5.00 ac; Area available for irrigation 3.00 ac; Maximum available harvest volume 1.00 ac-ft; Harvest rate 0.80 in/week. The results are calculated as you type: Effective impervious area 3.55 ac; Harvest volume over the effective impervious area 0.67 in; Nitrogen removal provided 52.69 %; Phosphorus removal provided 52.69 %.

    The treatment Stormwater Harvesting: its Entry tab.
    The treatment Stormwater Harvesting: its Entry tab.
  5. With catchment #1 selected, press Add Treatment and choose BMPs in Series. On its Entry tab type the Treatment name BMPs in Series and choose, upstream first: BMP 1 (upstream) Wet Detention; BMP 2 Stormwater Harvesting; BMP 3 (none); A series that starts with retention is calculated as One retention system (v1's method). Each member is a treatment of this catchment (the steps above). The results are at the bottom of the tab: Nitrogen removal provided 78.81 %; Phosphorus removal provided 90.77 %.

    The treatment BMPs in Series: its Entry tab.
    The treatment BMPs in Series: its Entry tab.
  6. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

    The treatment BMPs in Series: its Report tab.
    The treatment BMPs in Series: its Report tab.
  7. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment used
    catchment #1OutletBMPs in Series

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  8. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.417 / 0.710
Runoff, pre / post11.659 / 18.046 ac-ft/yr
TN load, pre / post17.969 / 27.813 kg/yr
TP load, pre / post2.487 / 3.849 kg/yr
BMPs in Series: computed by BMPFast
Hydraulic capture efficiency52.69 %
Provided TN / TP removal78.81 % / 90.77 %
TN load in → out27.813 → 5.894 kg/yr
TP load in → out3.849 → 0.355 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet27.813 → 5.894 kg/yr
TP load: catchments → outlet3.849 → 0.355 kg/yr
Provided removal TN / TP78.8 % / 90.8 %
Required removal TN / TP (Maximum % Removal)35.4 % (met) / 35.4 % (met)

The BMPs in Series Equations report

Open this report on its own page.

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site5.894 kg/yr7.079 kg/yrdiffers
Phosphorus leaving the site0.355 kg/yr0.519 kg/yrdiffers
Site removal, nitrogen78.807 %74.550 %differs
Site removal, phosphorus90.768 %86.510 %differs
catchment #1: Multiple BMP removal, nitrogen78.807 %74.550 %differs
catchment #1: Multiple BMP removal, phosphorus90.768 %86.510 %differs

BMPFast 2 gives a different number for: Nitrogen leaving the site, Phosphorus leaving the site, Site removal, nitrogen, Site removal, phosphorus, catchment #1: Multiple BMP removal, nitrogen, catchment #1: Multiple BMP removal, phosphorus. See the notes below the table.

When BMPFast 2 opened the v1 file it said:

  • catchment #1, Wet Detention: BMPFast 2 takes the wet pond equations as a pond without a littoral zone, and adds a littoral zone credit of 10 percentage points (Appendix O's maximum) to this pond's removal, so it is higher than v1 shows; lower Littoral zone credit if your permit reviewer allows less. To calculate as v1, choose "Reduce without a littoral zone (v1)" in How the littoral zone counts (Design values) on the treatment's Entry tab.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Wet Detention → Stormwater Harvesting. Water is pumped from the pond for irrigation; what is used never leaves. The harvesting removes 52.69 % of the runoff (REV curves), and the pond treats what overflows. Together TN 78.81 % and TP 90.77 % (Harvesting and Greenroof Methodology).

Load out.

5Files

  • series-pond-harvesting.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
  • series-pond-harvesting.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
  • Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • BMPs in Series (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • BMPs in Series — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.