BMPs in series: wet pond with stormwater harvesting

BMPFast sample project Example Problem 4: wet detention → harvesting, Net Improvement.

1The problem

The BMPFast sample project Example Problem 4: a wet detention pond whose water is also harvested for irrigation.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 5Zone map (help page 815)
Mean annual rainfall61 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Net ImprovementBMPFast sample project
Catchment 1: catchment #1 (Watershed Characteristics)
Land use, pre / postHighway / HighwayBMPFast sample project
Area, pre / post5.5 / 5.5 acBMPFast sample project
Non-DCIA curve number, pre / post80 / 80BMPFast sample project
DCIA, pre / post40 / 85 %BMPFast sample project
EMC TN, pre / post1.250 / 1.250 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.173 / 0.173 mg/LBMPFast land use table (AH Vol I Table 9.2)
Wet pond area (no loading)0.50 acBMPFast sample project
BMPs in Series (Multiple BMP)
BMP 1: Wet Detentionpermanent pool 2.472 ac-ft, littoral zone yesBMPFast sample project
BMP 2: Stormwater Harvesting1.00 ac-ft, 0.80 in/week over 3.00 acBMPFast sample project

Find: the removal of the series as one system, and the loads leaving the site.

2Steps in BMPFast

  1. Press Open Project and open series-pond-harvesting.bmpt (the file under Files; it is the BMPFast sample project Example Problem 4 wet pond with harvesting.bmpt). General Site Information (the main window; its title bar reads General Site Information and your license key) shows Florida Zone 5, 61.0 in of rainfall and the performance standard Net Improvement.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment to see the catchment (nothing to change). Press Back.

    Watershed Characteristics Worksheet (1. Enter Catchment).
    Watershed Characteristics Worksheet (1. Enter Catchment).
  3. BMP 1, Wet Detention, is defined on its own worksheet; this pond has a Floating Wetland/MAPs credit of 10 %. Do not open its worksheet for this problem: in the current build, opening the Wet Detention worksheet of a pond with a littoral zone sets the credit to 0 (reported for correction).

  4. Press 2. Enter Treatment and open Stormwater Harvesting: BMP 2 of the series is defined on its own worksheet. Press Calculate, then Back.

    BMP 2 of the series on its own worksheet.
    BMP 2 of the series on its own worksheet.
  5. On Treatment Options press BMPs in Series. BMP 1 to BMP 2 read Wet Detention → Stormwater Harvesting. Press Calculate.

    BMPs in Series (Multiple BMP) worksheet.
    BMPs in Series (Multiple BMP) worksheet.
  6. Calculate opens the series report: each BMP’s inputs and the system’s removal.

    The BMPs in Series report that Calculate opens.
    The BMPs in Series report that Calculate opens.
  7. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Multiple BMP as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
  8. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Summary Report (4. Summary Report) in the Report Viewer.
    The Summary Report (4. Summary Report) in the Report Viewer.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.417 / 0.710
Runoff, pre / post11.659 / 18.046 ac-ft/yr
TN load, pre / post17.969 / 27.813 kg/yr
TP load, pre / post2.487 / 3.849 kg/yr
Multiple BMP: computed by BMPFast
Hydraulic capture efficiency52.69 %
Provided TN / TP removal74.55 % / 86.51 %
TN load in → out27.813 → 7.079 kg/yr
TP load in → out3.849 → 0.519 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet27.813 → 7.079 kg/yr
TP load: catchments → outlet3.849 → 0.519 kg/yr
Provided removal TN / TP74.5 % / 86.5 %
Required removal TN / TP (Maximum % Removal)35.4 % (met) / 35.4 % (met)

The BMPs in Series Equations report

Open this report on its own page.

The Summary Report

Open this report on its own page.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Wet Detention → Stormwater Harvesting. Water is pumped from the pond for irrigation; what is used never leaves. The harvesting removes 52.69 % of the runoff (REV curves), and the pond treats what overflows. Together TN 74.55 % and TP 86.51 % (Harvesting and Greenroof Methodology).

Load out.

5Files

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.