Worked problems for every BMP and every method, each calculated by BMPFast, with the steps, the screens, a check and the project file to open.
Each problem gives its inputs and where they come from, every step in the program with the screen as it looks, the program's results and report, and a short check of the answer by hand or against the method. Download the .bmpt file to open the same project in BMPFast. The values describe illustrative sites unless a problem says it is one of the BMPFast sample projects.
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.
Every problem is listed with three links: its BMPFast solution (this site’s page), its BMPFast Plus solution (the same problem in BMPFast Plus, version 2: all BMPFast Plus sample problems) and its hand calculation (the page’s Check section, the answer worked by hand or against the method). Problems for methods only BMPFast Plus has are listed too, with their BMPFast Plus solution.
Contents: Retention · Wet Detention · Exfiltration · Permeable Pavement · Surface Discharge Filter · Rain Garden · Swale · Tree Well · Greenroof · Rainwater Harvesting · Stormwater Harvesting · Vegetated Natural Buffer · Vegetated Filter Strip · User Defined · BMPs in Series · Routing · Analysis types (performance standards) · Sizing · Surface Discharge Filter Sizing · Media Filter Service Life · Discovery Plots · Retention Efficiency Lookup Tables · Composite CN · Composite EMCs · Mean Annual Rainfall · Media Mix · Cost Analysis · Reports
BMPs
Retention
- Retention basin for a 10-acre subdivisionA dry retention basin of 1.0 ac-ft; BMP Analysis, Zone 2.BMPFast solution · BMPFast Plus solution · Hand calculation
- Retention for a specified removal of 75 %BMPFast sample project Example Problem 3: 11 ac, Zone 4, Specified Removal Efficiency 75 / 75 %.BMPFast solution · BMPFast Plus solution · Hand calculation
Wet Detention
- Wet detention pond with a littoral zoneA 4.0 ac-ft permanent pool with a littoral zone; All sites non-exempted, Zone 2.BMPFast solution · BMPFast Plus solution · Hand calculation
- Wet detention for a commercial site discharging to an impaired waterA 6.0 ac-ft pool, no littoral zone; Impaired Water, Zone 3.BMPFast solution · BMPFast Plus solution · Hand calculation
Exfiltration
- Exfiltration trench under a parking lotA 36-inch pipe in a 300 ft trench; All sites non-exempted, Zone 3.BMPFast solution · BMPFast Plus solution · Hand calculation
- Exfiltration for a subdivision discharging to an OFWA 48-inch pipe in a 600 ft trench; OFW, Zone 1, 62 in.BMPFast solution · BMPFast Plus solution · Hand calculation
Permeable Pavement
- Permeable concrete parking with a stone reservoir0.5 ac of permeable concrete over #57 rock; BMP Analysis, Zone 3.BMPFast solution · BMPFast Plus solution · Hand calculation
- Permeable pavement in a redevelopment1.2 ac of FlexiPave over pea rock and #57 rock; Redevelopment, Zone 4.BMPFast solution · BMPFast Plus solution · Hand calculation
Surface Discharge Filter
- Surface discharge filter with B&G CTS12A 0.5-inch treatment depth through B&G CTS12 media; BMP Analysis, Zone 2.BMPFast solution · BMPFast Plus solution · Hand calculation
- Surface discharge filter with B&G CTS24 for an impaired waterA 1.0-inch treatment depth through B&G CTS24; Impaired Water, Zone 3.BMPFast solution · BMPFast Plus solution · Hand calculation
Rain Garden
- Retention rain garden in a parking islandA rain garden that infiltrates, with B&G ECT media; BMP Analysis, Zone 2.BMPFast solution · BMPFast Plus solution · Hand calculation
- Detention rain garden with an underdrainA rain garden with an underdrain and B&G CTS12 media; Net Improvement, Zone 4.BMPFast solution · BMPFast Plus solution · Hand calculation
Swale
- Swale with groundwater discharge (sample project)BMPFast sample project example problem 1: a roadside swale.BMPFast solution · BMPFast Plus solution · Hand calculation
- Roadside swale with swale blocksA 1,000 ft swale with 8 blocks along a two-lane road; Redevelopment + OFW, Zone 2.BMPFast solution · BMPFast Plus solution · Hand calculation
Tree Well
- Tree wells along a street (retention)Ten 8 × 8 ft tree wells; BMP Analysis, Zone 2.BMPFast solution · BMPFast Plus solution · Hand calculation
- Tree wells with an underdrain and media (detention)Twelve 10 × 10 ft tree wells with B&G CTS12; Specified Removal 50 / 50 %, Zone 4.BMPFast solution · BMPFast Plus solution · Hand calculation
Greenroof
- Greenroof on an office buildingHalf an acre of greenroof, no cistern, Orlando; BMP Analysis.BMPFast solution · BMPFast Plus solution · Hand calculation
- Greenroof with a cistern for irrigationOne acre of greenroof with 2 in of cistern storage, Miami; Redevelopment + Impaired.BMPFast solution · BMPFast Plus solution · Hand calculation
Rainwater Harvesting
- Rainwater harvesting for a houseA 1,500-gallon cistern on a shingle roof; BMP Analysis, Zone 2.BMPFast solution · BMPFast Plus solution · Hand calculation
- Rainwater harvesting at a schoolA 30,000-gallon cistern on a flat concrete roof; Redevelopment + OFW, Zone 3.BMPFast solution · BMPFast Plus solution · Hand calculation
Stormwater Harvesting
- Stormwater harvesting from a pond, Zone 51 ac-ft harvested at 0.8 in/week over 3 ac; BMP Analysis, Zone 5, 61 in.BMPFast solution · BMPFast Plus solution · Hand calculation
- Stormwater harvesting for common-area irrigation6 ac-ft harvested at 1.0 in/week over 12 ac; Net Improvement, Zone 2.BMPFast solution · BMPFast Plus solution · Hand calculation
Vegetated Natural Buffer
- Vegetated natural buffer behind homes (retention)A 50 ft buffer, 600 ft long; BMP Analysis, Zone 2.BMPFast solution · BMPFast Plus solution · Hand calculation
- Vegetated natural buffer with plants (detention)A 100 ft buffer on a 6 % slope; Impaired Water + OFW, Zone 3.BMPFast solution · BMPFast Plus solution · Hand calculation
Vegetated Filter Strip
- Vegetated filter strip beside a parking lot (retention)A 20 ft strip, 400 ft long; BMP Analysis, Zone 2.BMPFast solution · BMPFast Plus solution · Hand calculation
- Vegetated filter strip with media (detention)A 30 ft strip with B&G CTS12 media; Impaired Water + OFW, Zone 4.BMPFast solution · BMPFast Plus solution · Hand calculation
User Defined
- User defined BMP: second-generation baffle boxA baffle box with 19 % TN and 35 % TP removal; BMP Analysis, Zone 2.BMPFast solution · BMPFast Plus solution · Hand calculation
- User defined BMP: alum injectionAlum treatment with 50 % TN and 90 % TP removal; Specified Removal 60 / 85 %, Zone 3.BMPFast solution · BMPFast Plus solution · Hand calculation
BMPs in Series
- BMPs in series: retention basin then wet pondBMPFast sample project Example Problem 5: retention → wet detention, Zone 5.BMPFast solution · BMPFast Plus solution · Hand calculation
- BMPs in series: two retention basinsBMPFast sample project Example Problem 5: retention → retention.BMPFast solution · BMPFast Plus solution · Hand calculation
- BMPs in series: wet pond with stormwater harvestingBMPFast sample project Example Problem 4: wet detention → harvesting, Net Improvement.BMPFast solution · BMPFast Plus solution · Hand calculation
- BMPs in series: permeable pavement then wet pondBMPFast sample project Example Problem 5: permeable pavement → wet detention.BMPFast solution · BMPFast Plus solution · Hand calculation
- BMPs in series: tree well, exfiltration and retentionBMPFast sample project Example Problem 6: three retention BMPs in series.BMPFast solution · BMPFast Plus solution · Hand calculation
Methods
Routing
- Routing: untreated catchment into a retention basinBMPFast sample project: 99 ac with no treatment routed to a 1 ac catchment with retention.BMPFast solution · BMPFast Plus solution · Hand calculation
- Routing: wet ponds in series (2020 manual)BMPFast sample project: three catchments, each with a wet pond, routed in series.BMPFast solution · BMPFast Plus solution · Hand calculation
- Routing: two subdivisions joining at a wet pondTwo catchments with retention join a third with a wet pond; All sites non-exempted.BMPFast solution · BMPFast Plus solution · Hand calculation
- Routing: retention basins in series, three methodsThree catchments one into another, each with a retention basin; Treatment Depth Allocation, Equation 9-5 and v1’s Treatment Depths added, compared (BMPFast 2).BMPFast solution: none (a BMPFast Plus method) · BMPFast Plus solution · Hand calculation
- Routing: Surface Discharge Filters in series, two methodsThree catchments one into another, each with a filter; the Handbook equation and the equivalent treatment depth, compared (BMPFast 2).BMPFast solution: none (a BMPFast Plus method) · BMPFast Plus solution · Hand calculation
Analysis types (performance standards)
- Analysis type: All sites non-exemptedThe same subdivision and wet pond under “All sites non-exempted”.BMPFast solution · BMPFast Plus solution · Hand calculation
- Analysis type: OFWThe same subdivision and wet pond under “OFW”.BMPFast solution · BMPFast Plus solution · Hand calculation
- Analysis type: Impaired WaterThe same subdivision and wet pond under “Impaired Water”.BMPFast solution · BMPFast Plus solution · Hand calculation
- Analysis type: Impaired Water + OFWThe same subdivision and wet pond under “Impaired Water + OFW”.BMPFast solution · BMPFast Plus solution · Hand calculation
- Analysis type: RedevelopmentThe same subdivision and wet pond under “Redevelopment”.BMPFast solution · BMPFast Plus solution · Hand calculation
- Analysis type: Redevelopment + OFWThe same subdivision and wet pond under “Redevelopment + OFW”.BMPFast solution · BMPFast Plus solution · Hand calculation
- Analysis type: Redevelopment + ImpairedThe same subdivision and wet pond under “Redevelopment + Impaired”.BMPFast solution · BMPFast Plus solution · Hand calculation
- Analysis type: Specified Removal EfficiencyThe same subdivision and wet pond under “Specified Removal Efficiency”.BMPFast solution · BMPFast Plus solution · Hand calculation
- Analysis type: Net ImprovementThe same subdivision and wet pond under “Net Improvement”.BMPFast solution · BMPFast Plus solution · Hand calculation
- Analysis type: BMP AnalysisThe same subdivision and wet pond under “BMP Analysis”.BMPFast solution · BMPFast Plus solution · Hand calculation
Sizing
- Sizing a retention basinBMPFast sample project Example Problem 3: the volume for 75 % and for 85 %.BMPFast solution · BMPFast Plus solution · Hand calculation
- Sizing a wet detention pondAll sites non-exempted cannot be met by a pond alone; the pool for 40 / 75 %.BMPFast solution · BMPFast Plus solution · Hand calculation
Surface Discharge Filter Sizing
- Sizing a filter after a retention basinExample Problem 3: B&G CTS12 after the basin, targets 85 / 90 %.BMPFast solution · BMPFast Plus solution · Hand calculation
- Sizing a filter after a wet pondExample Problem 5: B&G CTS24 after the wet detention pond.BMPFast solution · BMPFast Plus solution · Hand calculation
Media Filter Service Life
- Service life of a B&G CTS24 filterExample Problem 5: 2,175 sf of B&G CTS24, 24 in deep.BMPFast solution · BMPFast Plus solution · Hand calculation
- Filter area for a 20-year service lifeExample Problem 3: B&G CTS12, 18 in deep, target 20 years.BMPFast solution · BMPFast Plus solution · Hand calculation
Discovery Plots
- Discovery plot: outlet nitrogen against treatment depthExample Problem 3: TN at the outlet for depths of 0.25 to 2 in.BMPFast solution · BMPFast Plus solution · Hand calculation
- Discovery plot: outlet phosphorus against DCIAExample Problem 5: TP at the outlet as the directly connected impervious area grows.BMPFast solution · BMPFast Plus solution · Hand calculation
Retention Efficiency Lookup Tables
- Retention efficiency from the tables: Zone 2, 1.2 inCN 75, DCIA 25 %, 1.2 in in Zone 2, against the worksheet.BMPFast solution · BMPFast Plus solution · Hand calculation
- Retention efficiency between two tables: Zone 4, 0.8 inCN 80, DCIA 70 %, 0.8 in in Zone 4: interpolated between table depths.BMPFast solution · BMPFast Plus solution · Hand calculation
Composite CN
- Composite CN: post-development lotsLawns, unconnected roofs and open space in a 10-acre subdivision.BMPFast solution · BMPFast Plus solution · Hand calculation
- Composite CN: pre-development pasture and woodsThree pre-development covers on a 20-acre site.BMPFast solution · BMPFast Plus solution · Hand calculation
Composite EMCs
- Composite EMC: nitrogen for a mixed-use siteSingle-family, multi-family and commercial parts of a 10-acre site.BMPFast solution · BMPFast Plus solution · Hand calculation
- Composite EMC: phosphorus before developmentPasture, citrus and wet flatwoods on a 40-acre farm.BMPFast solution · BMPFast Plus solution · Hand calculation
Mean Annual Rainfall
- Mean annual rainfall: a site near OrlandoCentral Florida: Zone 2, 50 in.BMPFast solution · BMPFast Plus solution · Hand calculation
- Mean annual rainfall: a site near MiamiSouth Florida: Zone 5, 59 in.BMPFast solution · BMPFast Plus solution · Hand calculation
Media Mix
- Media mix: a filter with and without mediaSurface discharge filter, no media against B&G CTS12.BMPFast solution · BMPFast Plus solution · Hand calculation
- Media mix: residence time under and over 2 hoursSAT media in a detention rain garden.BMPFast solution · BMPFast Plus solution · Hand calculation
Cost Analysis
- Cost analysis: a retention basinExample Problem 3’s basin: the worked example of the Cost Analysis Methodology.BMPFast solution · BMPFast Plus solution · Hand calculation
- Cost analysis: stormwater harvesting with a water creditExample Problem 4: pump station, force main and pond, with the resale credit.BMPFast solution · BMPFast Plus solution · Hand calculation
Reports
- Reports: Summary and CompleteBMPFast sample project: no treatment upstream of a wet pond.BMPFast solution · BMPFast Plus solution · Hand calculation
- Reports: AH Vol I Section 9 compliance reportBMPFast sample project: wet ponds in series, All sites non-exempted.BMPFast solution · BMPFast Plus solution · Hand calculation
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.