1The problem

Before development the 20-acre site is pasture (12 ac, CN 69), woods (6 ac, CN 55) and a farmstead (2 ac, CN 78).

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 3Zone map (help page 815)
Mean annual rainfall54 inMean annual rainfall map (help page 815)
Performance standard (analysis type)All sites non-exemptedSite (illustrative)
Catchment 1: Site (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilySite (illustrative)
Area, pre / post20 / 20 acSite (illustrative)
Non-DCIA curve number, pre / post66.98 / 75Site (illustrative)
DCIA, pre / post0 / 25 %Site (illustrative)
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
Parts of the non-DCIA area
12 acCN 69Site (illustrative)
6 acCN 55Site (illustrative)
2 acCN 78Site (illustrative)

Find: the composite non-DCIA curve number and its effect on the runoff.

2Steps in BMPFast

  1. Open 1. Enter Catchment: the catchment as entered so far.

    Watershed Characteristics before the calculator.
    Watershed Characteristics before the calculator.
  2. Press + beside the pre-development non-DCIA curve number. Type each part’s area and CN and press Calculate. Press Back and answer Yes to use the composite CN.

    The Composite CN calculator after Calculate.
    The Composite CN calculator after Calculate.
  3. The catchment with the composite CN, after Calculate. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    Watershed Characteristics Worksheet (1. Enter Catchment).
    Watershed Characteristics Worksheet (1. Enter Catchment).

3Results

ResultValue
Composite CN66.98
Area-weighted C0.068
ROC, pre / post0.068 / 0.274
Runoff, pre / post6.096 / 24.660 ac-ft/yr

4Check

Method.

BMPFast does not average the curve numbers. It finds each part’s annual runoff coefficient C (Appendix N, at that CN and the catchment’s DCIA), weights C by area, and then finds the CN that gives the weighted C.

the CN with that C is 66.98. A plain area-weighted CN would be 65.70, which does not give the same annual runoff (help page 811).

5Files

  • composite-cn-pre.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
  • Summary Report (as BMPFast shows it)
  • BMP report (worksheet) (as BMPFast shows it)

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.