A copy of the help on bmpfast.com (last changed there 2026-10-16; copied here 2026-10-21). These pages describe the windows of BMPFast (version 1). BMPFast 2 uses the same methods; its numbered buttons are the tree on the left: General Site Information, then Catchments with their Treatments, Catchment Routings and Calculators.

This is the help for BMPFast. The sections below follow the program: the main screen, then its numbered buttons in order. Every help page is linked here by its title; the Help button on each screen in BMPFast opens the same page.

New to BMPFast? Fill in General Site Information, then work down the main screen’s numbered buttons: enter each catchment (1), choose its treatment (2), connect the catchments (3), and read the reports (4 and 5).

Starting BMPFast

The opening screen, where BMPFast checks its license before the main screen opens.

  • Validation — entering or checking the license key

General Site Information

The main screen: the project’s name, rainfall, meteorological zone and analysis type, and the numbered buttons that lead to everything else.

Catchment Characteristics

Button 1, Enter Catchment: each catchment’s area, land use, curve numbers, runoff and loads.

Treatment Options (BMPs)

Button 2, Enter Treatment: choose the BMP that treats a catchment. The BMPs are listed in the order of their buttons on the screen.

Sizing: the Sizing button on a BMP worksheet (and Surface Discharge Filter Sizing) finds the dimensions a BMP needs to meet the N and P targets, for that BMP with its own catchment.

Catchment Configurations

Button 3, Configure Catchments: how the catchments connect, and so how water and loads are routed from one to the next before reaching the outlet.

  • Routing — a catchment’s routing

Reports

Every report opens in the Report Viewer. Its menu prints the report (Print), saves it as a web page (Save), copies the whole report to paste into another program (Copy), switches to another report of the project (Reports), opens this help (Help) and closes the viewer (Back). A report is calculated when it is opened, so it always matches the current inputs. The reports:

  • Summary Report — button 4: the removal achieved against the analysis type’s targets
  • Complete Report — button 5: the routing table, then every catchment in detail, then the summary
  • AH Vol 1, Sec 9, App M-O (AHVI Section 9 Compliance Report) — button 8, Custom Reports: the calculations in the order and terms of the ERP Applicant’s Handbook Vol. I, Section 9, for submittal
  • Flow Balance Report — flow, nitrogen and phosphorus in and out along each chain of catchments
  • Full Routing Diagram — a balance block for every catchment, chain by chain
  • Routing Diagram — each chain of catchments drawn from upstream to the outlet
  • Catchment Report — the land use, areas, runoff and loads of every catchment
  • BMP reports and Equations — Calculate on each BMP screen shows that BMP’s report, and then its Equations page
  • Cost reports — from Cost Analysis

Cost Analysis

Button 6 (also Cost Report on Treatment Options): the life-cycle cost of each BMP, its construction, replacement and maintenance costs, and the cost per pound of nitrogen and phosphorus removed.

Discovery Plots

Button 7 (also on Catchment Configurations): plots that show how changing a design value changes the removal, to find a design that meets the target.

Methodology

How BMPFast calculates, with the equations, tables and sources behind the results.

  • Retention Methodology: the retention curves used by every retention BMP: their parameters, inputs and results, how the program interpolates them, and the curves for each zone.
  • Retention BMPs: how each BMP treated as retention (Retention, Exfiltration, Permeable Pavement, Rain Garden, Tree Well, Swale, Vegetated Buffer and Filter Strip) calculates its Treatment Depth before the curves are read, including BMPs in series and in the routing.
  • Wet Detention Methodology: how BMPFast calculates a wet detention pond: the residence time, the nitrogen and phosphorus equations and their source, the littoral zone and MAPs rules, with curves of removal against residence time.
  • Cost Analysis Methodology: how the life-cycle cost is calculated: replacements, present values of yearly costs and credits, present worth, annualized cost and cost per pound, with a worked example.
  • Discovery Plots Methodology: how each point of a Discovery Plot is calculated: the whole project, routing included, at one value of the varied design parameter, and why it can differ from a BMP worksheet’s own plot.
  • Harvesting and Greenroof Methodology: the REV curves and how BMPFast reads them for stormwater and rainwater harvesting, and the greenroof station curves, with worked examples.
  • Media and Filtration Methodology: the media mixes, the Surface Discharge Filter and its sizing, the Detention settings of other BMPs, media filter service life and User Defined BMPs.

Comparison of methods

Where more than one method is defensible, these pages solve one problem by each method and compare them in a table and a plot. Every number comes from BMPFast.

Sample problems

BMPFast sample problems: at least two worked problems for every BMP and method, each with every input, the steps with screen captures, the program’s results, a hand check and the project file to download. Each help page links to its own.

More on this site

Every help page

In the order of the guide above, then the pages it does not list.

Documentation

Help home · List of every help page · This page on bmpfast.com · Sample problems