SoftwarePlus.ai

All programs › BMPFast › BMPFast 2 sample problems

Composite CN: pre-development pasture and woods

Three pre-development covers on a 20-acre site.

1The problem

Before development the 20-acre site is pasture (12 ac, CN 69), woods (6 ac, CN 55) and a farmstead (2 ac, CN 78).

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 3Zone map (help page 815)
Mean annual rainfall54 inMean annual rainfall map (help page 815)
Performance standard (analysis type)All sites non-exemptedSite (illustrative)
Catchment 1: Site (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilySite (illustrative)
Area, pre / post20 / 20 acSite (illustrative)
Non-DCIA curve number, pre / post66.98 / 75Site (illustrative)
DCIA, pre / post0 / 25 %Site (illustrative)
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
Parts of the non-DCIA area
12 acCN 69Site (illustrative)
6 acCN 55Site (illustrative)
2 acCN 78Site (illustrative)

Find: the composite non-DCIA curve number and its effect on the runoff.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Composite CN: pre-development pasture and woods; Meteorological zone Florida Zone 3; Mean annual rainfall 54.00 in; Type of analysis All sites non-exempted. (To see the finished project instead, choose File ▸ Open and open composite-cn-pre.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left) and select the new catchment in the tree. On its Entry tab type the name Site and enter: Land use (pre) Agricultural - Pasture; Land use (post) Single-Family; Area (pre) 20.00 ac; Area (post) 20.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 75.00; DCIA (post) 25.00 %. BMPFast 2 works out the pre-development runoff as you type: ROC 0.051, 4.554 ac-ft/yr. The curve number 61 is a guess for the whole site; its parts have different covers.

  3. Open the catchment’s Composite CN (optional) tab (or press the calculator button beside the pre-development non-DCIA curve number). In the pre-development table type each part’s area and non-DCIA curve number: 12 ac at CN 69, 6 ac at CN 55, 2 ac at CN 78 (the search button beside a curve number picks it from the SCS table). A new line opens as each one is filled. The line Composite shows the composite curve number, 66.98. The note under the table checks that the parts add up to the pre-development area: 20 ac. Press Use this CN.

    The catchment’s Composite CN (optional) tab: the pre-development parts and their composite.
    The catchment’s Composite CN (optional) tab: the pre-development parts and their composite.
  4. BMPFast 2 goes back to the Entry tab with the pre-development non-DCIA curve number now 66.98; the line at the top says it is the composite of the parts on the Composite CN tab. (Change a part later and that line says the box no longer matches.)

    The catchment’s Entry tab after Use this CN.
    The catchment’s Entry tab after Use this CN.
  5. At the bottom of the Entry tab, under Calculated, the runoff and loads are worked out again with the composite. Save the project with File ▸ Save; compare it with composite-cn-pre.bmpf under Files.

    The bottom of the Entry tab: the runoff and loads with the composite curve number.
    The bottom of the Entry tab: the runoff and loads with the composite curve number.

3Results

ResultValue
Composite curve number66.98
Area-weighted runoff coefficient0.0677
Curve number put into the Entry tab66.98

The catchment before and after (pre-development)

CN 61 (typed)Composite CN
Non-DCIA curve number6166.98
Annual runoff coefficient (ROC)0.0510.068
Runoff volume (ac-ft/yr)4.5546.096
Nitrogen load (kg/yr)17.01422.774
Phosphorus load (kg/yr)3.3304.457

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site53.818 kg/yr53.818 kg/yrsame
Phosphorus leaving the site9.943 kg/yr9.943 kg/yrsame
Site removal, nitrogen0.000 %0.000 %same
Site removal, phosphorus0.000 %0.000 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

PartArea (ac)Non-DCIA CNRunoff coefficient CArea-weighted C
Part 112690.07460.0448
Part 26550.03700.0111
Part 32780.11860.0119

Method.

BMPFast does not average the curve numbers. It finds each part’s annual runoff coefficient C (Appendix N, at that CN and the catchment’s DCIA of 0 %), weights C by area, and then finds the CN that gives the weighted C.

the CN with that C is 66.98. A plain area-weighted CN would be 65.70, which does not give the same annual runoff (help page 811).

The same table is also under Calculators ▸ Composite Curve Number, for working out a curve number without putting it into a catchment.

5Files

  • composite-cn-pre.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
  • composite-cn-pre.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
  • Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.