All programs › BMPFast › Sample problems
Permeable pavement in a redevelopment
1.2 ac of FlexiPave over pea rock and #57 rock; Redevelopment, Zone 4.
Help: Permeable Pavement (help page 300) · Download the .bmpt · Link to Solution in BMPFast Version 2
1The problem
A 3-acre commercial redevelopment replaces 1.2 ac of asphalt with FlexiPave (6 in) over #89 pea rock (4 in) and #57 rock (18 in).
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 4 | Zone map (help page 815) |
| Mean annual rainfall | 52 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Redevelopment | Site (illustrative) |
| Catchment 1: Commercial site (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / High-Intensity Commercial | Site (illustrative) |
| Area, pre / post | 3 / 3 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 80 | Site (illustrative) |
| DCIA, pre / post | 0 / 70 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 2.400 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.345 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Layers (thickness, sustainable void) | #89 pea rock 4 in, 25 %, #57 rock(non-calcareous) 18 in, 21 %, FlexiPaveTM 6 in, 20 % | Design; voids from the program’s pavement table |
| Permeable Pavement (worksheet) | ||
| Permeable Pavement Area | 1.2 ac | Design (illustrative) |
| Time to recover design volume | 72 hr | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast
Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Permeable pavement: redevelopment, choose Florida Zone 4, enter 52 in of mean annual rainfall and choose the performance standard Redevelopment.

General Site Information (the main window). Press 1. Enter Catchment. For Catchment 1 type the name Commercial site, choose the land uses Undeveloped - Mesic Flatwoods (pre) and High-Intensity Commercial (post), enter the areas 3 and 3 ac, the non-DCIA curve numbers 70 and 80 and the DCIA 0 and 70 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

Watershed Characteristics Worksheet (1. Enter Catchment). Press 2. Enter Treatment, then Permeable Pavement. Type the pavement area, then press Edit Pavement Types and Depths. Enter the layer thicknesses: #89 pea rock 4 in (void 25 %), #57 rock(non-calcareous) 18 in (void 21 %), FlexiPaveTM 6 in (void 20 %). Press Calculate, then Back.

Edit Pavement Types and Depths: the layers and their thicknesses. Press 2. Enter Treatment and then Permeable Pavement. On the Permeable Pavement worksheet: Permeable Pavement Area 1.2 ac; Time to recover design volume 72 hr. Press Calculate. The report on the worksheet shows the inputs and the results.

The BMP worksheet after Calculate: the report on the left. Press the same button again, now labelled Equations: the worksheet shows each equation with this problem’s values. Press Back to return to the treatment options.

The same worksheet showing Equations: each equation with this problem’s values. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Permeable Pavement as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

The Summary Report (4. Summary Report) in the Report Viewer.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.071 / 0.615 |
| Runoff, pre / post | 0.923 / 7.995 ac-ft/yr |
| TN load, pre / post | 1.237 / 23.659 kg/yr |
| TP load, pre / post | 0.049 / 3.401 kg/yr |
| Permeable Pavement: computed by BMPFast | |
| Treatment depth | 2.392 in |
| Hydraulic capture efficiency | 92.15 % |
| Provided TN / TP removal | 92.15 % / 92.15 % |
| TN load in → out | 23.659 → 1.857 kg/yr |
| TP load in → out | 3.401 → 0.267 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 23.659 → 1.857 kg/yr |
| TP load: catchments → outlet | 3.401 → 0.267 kg/yr |
| Provided removal TN / TP | 92.2 % / 92.2 % |
| Required removal TN / TP (Maximum % Removal) | 45.0 % (met) / 80.0 % (met) |
The BMP report
Open this report on its own page.
The Summary Report
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.615 × 3.00 ac × 52.0 in / 12 | |
| = 7.995 ac-ft/yr (program 7.995). |
| TN load | = EMC × runoff × 1.233 |
| = 2.400 × 7.995 × 1.233 | |
| = 23.659 kg/yr (program 23.659) |
| TP load | = 0.345 × 7.995 × 1.233 |
| = 3.401 kg/yr (program 3.401). |
1.233 kg is 1 mg/L in 1 ac-ft.
Storage.
| Storage | = pavement area × Σ(layer thickness × sustainable void) / 12 |
| = 1.20 ac × (#89 pea rock 4 in × 25 % + #57 rock(non-calcareous) 18 in × 21 % + FlexiPaveTM 6 in × 20 % = 5.98 in) / 12 | |
| = 0.5980 ac-ft (program 0.5980). |
Treatment depth.
| Depth | = storage × 12 / area |
| = 0.5980 ac-ft × 12 / 3.00 ac | |
| = 2.392 in (program 2.392). |
The depth is taken over the whole catchment (3.00 ac): the pavement treats the rain falling on it and the runoff of the 1.80 ac draining onto it.
Capture. The retention efficiency tables for Florida Zone 4 at a treatment depth of 2.392 in, non-DCIA CN 80.00 and DCIA 70.0 % give a hydraulic capture of 92.15 % (AH Vol I Appendix O; read the same tables with Tools › Retention Efficiency Lookup Tables, help page 4325). Permeable pavement is a retention BMP: the removal equals the capture.
Load out.
| TN out | = load in × (1 − removal) |
| = 23.659 × (1 − 92.15 / 100) | |
| = 1.857 kg/yr (program 1.857) |
| TP out | = 3.401 × (1 − 92.15 / 100) |
| = 0.267 kg/yr (program 0.267). |
The program’s Equations page
5Files
- permeable-pavement-redevelopment.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
- Equations page (worksheet) (as BMPFast shows it)
- Summary Report (as BMPFast shows it)
- BMP report (worksheet) (as BMPFast shows it)
6Help and methodology
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.