BMPFast 2 sample problems
The BMPFast sample problems solved in BMPFast 2: the steps in BMPFast 2’s window, its screens, its results beside v1’s, a check and the project file to open.
These are the problems of the BMPFast sample problems, solved in BMPFast 2. Each gives its inputs, every step in BMPFast 2 with the screen as it looks, BMPFast 2’s results and reports beside v1’s numbers, and a short check by hand. Download the .bmpf to open the same project in BMPFast 2 (the v1 .bmpt is there too, and BMPFast 2 opens it).
44 of 68 problems give the same numbers in BMPFast 2 as in BMPFast (v1); a page where a number differs says why. 2 more are BMPFast 2’s own, for the methods it adds to the routing: retention basins and Surface Discharge Filters routed one into another, each method in its own routing, compared side by side.
Calculated with BMPFast 2 version 2.0.0 (2026-10-20). Screen captures are for demonstration only.
Contents: Retention · Wet Detention · Exfiltration · Permeable Pavement · Surface Discharge Filter · Rain Garden · Swale · Tree Well · Greenroof · Rainwater Harvesting · Stormwater Harvesting · Vegetated Natural Buffer · Vegetated Filter Strip · User Defined · BMPs in Series · Routing · Analysis types (performance standards) · Sizing · Surface Discharge Filter Sizing · Media Filter Service Life · Discovery Plots · Retention Efficiency Lookup Tables · Composite CN · Composite EMCs · Mean Annual Rainfall · Media Mix · Cost Analysis · Reports
BMPs
Retention
- Retention basin for a 10-acre subdivisionA dry retention basin of 1.0 ac-ft; BMP Analysis, Zone 2.
- Retention for a specified removal of 75 %BMPFast sample project Example Problem 3: 11 ac, Zone 4, Specified Removal Efficiency 75 / 75 %.
Wet Detention
- Wet detention pond with a littoral zoneA 4.0 ac-ft permanent pool with a littoral zone; All sites non-exempted, Zone 2.
- Wet detention for a commercial site discharging to an impaired waterA 6.0 ac-ft pool, no littoral zone; Impaired Water, Zone 3.
Exfiltration
- Exfiltration trench under a parking lotA 36-inch pipe in a 300 ft trench; All sites non-exempted, Zone 3.
- Exfiltration for a subdivision discharging to an OFWA 48-inch pipe in a 600 ft trench; OFW, Zone 1, 62 in.
Permeable Pavement
- Permeable concrete parking with a stone reservoir0.5 ac of permeable concrete over #57 rock; BMP Analysis, Zone 3.
- Permeable pavement in a redevelopment1.2 ac of FlexiPave over pea rock and #57 rock; Redevelopment, Zone 4.
Surface Discharge Filter
- Surface discharge filter with B&G CTS12A 0.5-inch treatment depth through B&G CTS12 media; BMP Analysis, Zone 2.
- Surface discharge filter with B&G CTS24 for an impaired waterA 1.0-inch treatment depth through B&G CTS24; Impaired Water, Zone 3.
Rain Garden
- Retention rain garden in a parking islandA rain garden that infiltrates, with B&G ECT media; BMP Analysis, Zone 2.
- Detention rain garden with an underdrainA rain garden with an underdrain and B&G CTS12 media; Net Improvement, Zone 4.
Swale
- Swale with groundwater discharge (sample project)BMPFast sample project example problem 1: a roadside swale.
- Roadside swale with swale blocksA 1,000 ft swale with 8 blocks along a two-lane road; Redevelopment + OFW, Zone 2.
Tree Well
- Tree wells along a street (retention)Ten 8 × 8 ft tree wells; BMP Analysis, Zone 2.
- Tree wells with an underdrain and media (detention)Twelve 10 × 10 ft tree wells with B&G CTS12; Specified Removal 50 / 50 %, Zone 4.
Greenroof
- Greenroof on an office buildingHalf an acre of greenroof, no cistern, Orlando; BMP Analysis.
- Greenroof with a cistern for irrigationOne acre of greenroof with 2 in of cistern storage, Miami; Redevelopment + Impaired.
Rainwater Harvesting
- Rainwater harvesting for a houseA 1,500-gallon cistern on a shingle roof; BMP Analysis, Zone 2.
- Rainwater harvesting at a schoolA 30,000-gallon cistern on a flat concrete roof; Redevelopment + OFW, Zone 3.
Stormwater Harvesting
- Stormwater harvesting from a pond, Zone 51 ac-ft harvested at 0.8 in/week over 3 ac; BMP Analysis, Zone 5, 61 in.
- Stormwater harvesting for common-area irrigation6 ac-ft harvested at 1.0 in/week over 12 ac; Net Improvement, Zone 2.
Vegetated Natural Buffer
- Vegetated natural buffer behind homes (retention)A 50 ft buffer, 600 ft long; BMP Analysis, Zone 2.
- Vegetated natural buffer with plants (detention)A 100 ft buffer on a 6 % slope; Impaired Water + OFW, Zone 3.
Vegetated Filter Strip
- Vegetated filter strip beside a parking lot (retention)A 20 ft strip, 400 ft long; BMP Analysis, Zone 2.
- Vegetated filter strip with media (detention)A 30 ft strip with B&G CTS12 media; Impaired Water + OFW, Zone 4.
User Defined
- User defined BMP: second-generation baffle boxA baffle box with 19 % TN and 35 % TP removal; BMP Analysis, Zone 2.
- User defined BMP: alum injectionAlum treatment with 50 % TN and 90 % TP removal; Specified Removal 60 / 85 %, Zone 3.
BMPs in Series
- BMPs in series: retention basin then wet pondBMPFast sample project Example Problem 5: retention → wet detention, Zone 5.
- BMPs in series: two retention basinsBMPFast sample project Example Problem 5: retention → retention.
- BMPs in series: wet pond with stormwater harvestingBMPFast sample project Example Problem 4: wet detention → harvesting, Net Improvement.
- BMPs in series: permeable pavement then wet pondBMPFast sample project Example Problem 5: permeable pavement → wet detention.
- BMPs in series: tree well, exfiltration and retentionBMPFast sample project Example Problem 6: three retention BMPs in series.
Methods
Routing
- Routing: untreated catchment into a retention basinBMPFast sample project: 99 ac with no treatment routed to a 1 ac catchment with retention.
- Routing: wet ponds in series (2020 manual)BMPFast sample project: three catchments, each with a wet pond, routed in series.
- Routing: two subdivisions joining at a wet pondTwo catchments with retention join a third with a wet pond; All sites non-exempted.
- Routing: retention basins in series, three methodsThree catchments one into another, each with a retention basin; Treatment Depth Allocation, Equation 9-5 and v1’s Treatment Depths added, compared (BMPFast 2).
- Routing: Surface Discharge Filters in series, two methodsThree catchments one into another, each with a filter; the Handbook equation and the equivalent treatment depth, compared (BMPFast 2).
Analysis types (performance standards)
- Analysis type: All sites non-exemptedThe same subdivision and wet pond under “All sites non-exempted”.
- Analysis type: OFWThe same subdivision and wet pond under “OFW”.
- Analysis type: Impaired WaterThe same subdivision and wet pond under “Impaired Water”.
- Analysis type: Impaired Water + OFWThe same subdivision and wet pond under “Impaired Water + OFW”.
- Analysis type: RedevelopmentThe same subdivision and wet pond under “Redevelopment”.
- Analysis type: Redevelopment + OFWThe same subdivision and wet pond under “Redevelopment + OFW”.
- Analysis type: Redevelopment + ImpairedThe same subdivision and wet pond under “Redevelopment + Impaired”.
- Analysis type: Specified Removal EfficiencyThe same subdivision and wet pond under “Specified Removal Efficiency”.
- Analysis type: Net ImprovementThe same subdivision and wet pond under “Net Improvement”.
- Analysis type: BMP AnalysisThe same subdivision and wet pond under “BMP Analysis”.
Sizing
- Sizing a retention basinBMPFast sample project Example Problem 3: the volume for 75 % and for 85 %.
- Sizing a wet detention pondAll sites non-exempted cannot be met by a pond alone; the pool for 40 / 75 %.
Surface Discharge Filter Sizing
- Sizing a filter after a retention basinExample Problem 3: B&G CTS12 after the basin, targets 85 / 90 %.
- Sizing a filter after a wet pondExample Problem 5: B&G CTS24 after the wet detention pond.
Media Filter Service Life
- Service life of a B&G CTS24 filterExample Problem 5: 2,175 sf of B&G CTS24, 24 in deep.
- Filter area for a 20-year service lifeExample Problem 3: B&G CTS12, 18 in deep, target 20 years.
Discovery Plots
- Discovery plot: outlet nitrogen against treatment depthExample Problem 3: TN at the outlet for depths of 0.25 to 2 in.
- Discovery plot: outlet phosphorus against DCIAExample Problem 5: TP at the outlet as the directly connected impervious area grows.
Retention Efficiency Lookup Tables
- Retention efficiency from the tables: Zone 2, 1.2 inCN 75, DCIA 25 %, 1.2 in in Zone 2, against the worksheet.
- Retention efficiency between two tables: Zone 4, 0.8 inCN 80, DCIA 70 %, 0.8 in in Zone 4: interpolated between table depths.
Composite CN
- Composite CN: post-development lotsLawns, unconnected roofs and open space in a 10-acre subdivision.
- Composite CN: pre-development pasture and woodsThree pre-development covers on a 20-acre site.
Composite EMCs
- Composite EMC: nitrogen for a mixed-use siteSingle-family, multi-family and commercial parts of a 10-acre site.
- Composite EMC: phosphorus before developmentPasture, citrus and wet flatwoods on a 40-acre farm.
Mean Annual Rainfall
- Mean annual rainfall: a site near OrlandoCentral Florida: Zone 2, 50 in.
- Mean annual rainfall: a site near MiamiSouth Florida: Zone 5, 59 in.
Media Mix
- Media mix: a filter with and without mediaSurface discharge filter, no media against B&G CTS12.
- Media mix: residence time under and over 2 hoursSAT media in a detention rain garden.
Cost Analysis
- Cost analysis: a retention basinExample Problem 3’s basin: the worked example of the Cost Analysis Methodology.
- Cost analysis: stormwater harvesting with a water creditExample Problem 4: pump station, force main and pond, with the resale credit.
Reports
- Reports: Summary and CompleteBMPFast sample project: no treatment upstream of a wet pond.
- Reports: AH Vol I Section 9 compliance reportBMPFast sample project: wet ponds in series, All sites non-exempted.