Rainwater harvesting for a house
A 1,500-gallon cistern on a shingle roof; BMP Analysis, Zone 2.
Help: Rainwater Harvesting (help page 292) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
A 3,049 sf shingle roof fills a 1,500-gallon cistern used to irrigate 5,000 sf of lawn at 1.0 in/week.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 2 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | BMP Analysis | Site (illustrative) |
| Catchment 1: Roof (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / Conventional Roofs | Site (illustrative) |
| Area, pre / post | 0.07 / 0.07 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 98 | Site (illustrative) |
| DCIA, pre / post | 0 / 100 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 1.050 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.120 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Rainwater Harvesting (worksheet) | ||
| Roof type | SHINGLES, 25% SLOPE | Design (illustrative) |
| Contributing area | 3049 sf | Design (illustrative) |
| Available harvest volume | 1500 gal | Design (illustrative) |
| Harvest rate | 1.0 in/week | Design (illustrative) |
| Area available for irrigation | 5000 sf | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Rainwater harvesting: house with cistern; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis BMP Analysis. (To follow along with the finished project instead, choose File ▸ Open and open
rainwater-cistern.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Roof and enter: Land use (pre) Undeveloped - Mesic Flatwoods; Land use (post) Conventional Roofs; Area (pre) 0.07 ac; Area (post) 0.07 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 98.00; DCIA (post) 100.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.809; Runoff volume (post) 0.236 ac-ft/yr; Nitrogen load (post) 0.305 kg/yr; Phosphorus load (post) 0.035 kg/yr.

The catchment Roof: its Entry tab. With Roof selected, press Add Treatment and choose Rainwater Harvesting. On its Entry tab type the Treatment name Rainwater Harvesting (BMPFast 2 starts it as “Rainwater Harvesting 1”) and enter: Roof type SHINGLES, 25% SLOPE; Contributing area 3,049.20 ft²; Area available for irrigation 5,000.00 ft²; Available harvest volume 1,500.00 gal; Harvest rate 1.00 in/week. The results are calculated as you type: Equivalent impervious area 2,923 ft²; Harvest volume over the equivalent impervious area 0.82 in; Nitrogen removal provided 76.21 %; Phosphorus removal provided 76.21 %.

The treatment Rainwater Harvesting: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment Rainwater Harvesting: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Roof Outlet Rainwater Harvesting A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.057 / 0.809 |
| Runoff, pre / post | 0.017 / 0.236 ac-ft/yr |
| TN load, pre / post | 0.022 / 0.305 kg/yr |
| TP load, pre / post | 0.001 / 0.035 kg/yr |
| Rainwater Harvesting: computed by BMPFast | |
| Hydraulic capture efficiency | 76.00 % |
| Provided TN / TP removal | 76.21 % / 76.21 % |
| TN load in → out | 0.305 → 0.073 kg/yr |
| TP load in → out | 0.035 → 0.008 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 0.305 → 0.073 kg/yr |
| TP load: catchments → outlet | 0.035 → 0.008 kg/yr |
| Provided removal TN / TP | 76.2 % / 76.2 % |
The BMP report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 0.073 kg/yr | 0.073 kg/yr | same |
| Phosphorus leaving the site | 0.008 kg/yr | 0.008 kg/yr | same |
| Site removal, nitrogen | 76.213 % | 76.213 % | same |
| Site removal, phosphorus | 76.213 % | 76.213 % | same |
| Roof: Rainwater Harvesting removal, nitrogen | 76.213 % | 76.213 % | same |
| Roof: Rainwater Harvesting removal, phosphorus | 76.213 % | 76.213 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.809 × 0.07 ac × 50.0 in / 12 | |
| = 0.236 ac-ft/yr (program 0.236). |
| TN load | = EMC × runoff × 1.233 |
| = 1.050 × 0.236 × 1.233 | |
| = 0.305 kg/yr (program 0.305) |
| TP load | = 0.120 × 0.236 × 1.233 |
| = 0.035 kg/yr (program 0.035). |
1.233 kg is 1 mg/L in 1 ac-ft.
REV coordinates.
| Equivalent impervious area EIA | = 2,923 sf (roof area × the runoff coefficient of a shingles, 25% slope roof). |
| Harvest volume over EIA | = 1,500 gal / 7.4805 gal/cf / 2,923 sf × 12 |
| = 0.8231 in (program 0.8231). |
| Use rate over EIA | = 1.00 in/week × 5,000 sf / 7 / 2,923 sf |
| = 0.2443 in/day (program 0.2443). |
Capture. The rate-efficiency-volume (REV) curves for Florida Zone 2 at those coordinates give 76.00 %; water that is used is not discharged, so TN and TP removal equal it (Harvesting and Greenroof Methodology).
Load out.
| TN out | = load in × (1 − removal) |
| = 0.305 × (1 − 76.21 / 100) | |
| = 0.073 kg/yr (program 0.073) |
| TP out | = 0.035 × (1 − 76.21 / 100) |
| = 0.008 kg/yr (program 0.008). |
The program’s Equations page
5Files
- rainwater-cistern.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- rainwater-cistern.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Rainwater Harvesting (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Rainwater Harvesting — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.