SoftwarePlus.ai

All programs › BMPFast › BMPFast 2 sample problems

Stormwater harvesting from a pond, Zone 5

1 ac-ft harvested at 0.8 in/week over 3 ac; BMP Analysis, Zone 5, 61 in.

1The problem

A 5-acre commercial site in Zone 5 (61 in) drains to a pond from which 1 ac-ft can be harvested to irrigate 3 ac at 0.8 in/week (the pond and irrigation of Example Problem 4 of the BMP Trains manual, on this site).

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 5Zone map (help page 815)
Mean annual rainfall61 inMean annual rainfall map (help page 815)
Performance standard (analysis type)BMP AnalysisSite (illustrative)
Catchment 1: Watershed (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / High-Intensity CommercialSite (illustrative)
Area, pre / post5 / 5 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 80Site (illustrative)
DCIA, pre / post0 / 70 %Site (illustrative)
EMC TN, pre / post3.030 / 2.400 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.345 mg/LBMPFast land use table (AH Vol I Table 9.2)
Stormwater Harvesting (worksheet)
Max available harvest volume1.0 ac-ftDesign (illustrative)
Harvest rate0.8 in/weekDesign (illustrative)
Area available for irrigation3 acDesign (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Stormwater harvesting: 5 ac commercial site, Zone 5; Meteorological zone Florida Zone 5; Mean annual rainfall 61.00 in; Type of analysis BMP Analysis. (To follow along with the finished project instead, choose File ▸ Open and open stormwater-harvesting-commercial.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Watershed and enter: Land use (pre) Agricultural - Pasture; Land use (post) High-Intensity Commercial; Area (pre) 5.00 ac; Area (post) 5.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 80.00; DCIA (post) 70.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.613; Runoff volume (post) 15.580 ac-ft/yr; Nitrogen load (post) 46.106 kg/yr; Phosphorus load (post) 6.628 kg/yr.

    The catchment Watershed: its Entry tab.
    The catchment Watershed: its Entry tab.
  3. With Watershed selected, press Add Treatment and choose Stormwater Harvesting. On its Entry tab type the Treatment name Stormwater Harvesting (BMPFast 2 starts it as “Stormwater Harvesting 1”) and enter: Total contributing area 5.00 ac; Area available for irrigation 3.00 ac; Maximum available harvest volume 1.00 ac-ft; Harvest rate 0.80 in/week. The results are calculated as you type: Effective impervious area 3.06 ac; Harvest volume over the effective impervious area 0.81 in; Nitrogen removal provided 62.02 %; Phosphorus removal provided 62.02 %.

    The treatment Stormwater Harvesting: its Entry tab.
    The treatment Stormwater Harvesting: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

    The treatment Stormwater Harvesting: its Report tab.
    The treatment Stormwater Harvesting: its Report tab.
  5. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment used
    WatershedOutletStormwater Harvesting

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  6. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.060 / 0.613
Runoff, pre / post1.530 / 15.580 ac-ft/yr
TN load, pre / post5.716 / 46.106 kg/yr
TP load, pre / post1.119 / 6.628 kg/yr
Stormwater Harvesting: computed by BMPFast
Treatment depth0.809 in
Hydraulic capture efficiency62.02 %
Provided TN / TP removal62.02 % / 62.02 %
TN load in → out46.106 → 17.513 kg/yr
TP load in → out6.628 → 2.517 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet46.106 → 17.513 kg/yr
TP load: catchments → outlet6.628 → 2.517 kg/yr
Provided removal TN / TP62.0 % / 62.0 %

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site17.513 kg/yr17.513 kg/yrsame
Phosphorus leaving the site2.517 kg/yr2.517 kg/yrsame
Site removal, nitrogen62.016 %62.016 %same
Site removal, phosphorus62.016 %62.016 %same
Watershed: Stormwater Harvesting removal, nitrogen62.016 %62.016 %same
Watershed: Stormwater Harvesting removal, phosphorus62.016 %62.016 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

REV coordinates.

Capture. The REV curves of Florida Zone 5 at (x, y) give 62.02 %, the TN and TP removal. Demand 3.389 MG/yr, supply 3.148 MG/yr, supplemental water 0.240 MG/yr (Harvesting and Greenroof Methodology).

Load out.

The program’s Equations page

Open this report on its own page.

5Files

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.