All programs › BMPFast › BMPFast 2 sample problems
Stormwater harvesting from a pond, Zone 5
1 ac-ft harvested at 0.8 in/week over 3 ac; BMP Analysis, Zone 5, 61 in.
Help: Stormwater Harvesting (help page 308) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
A 5-acre commercial site in Zone 5 (61 in) drains to a pond from which 1 ac-ft can be harvested to irrigate 3 ac at 0.8 in/week (the pond and irrigation of Example Problem 4 of the BMP Trains manual, on this site).
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 5 | Zone map (help page 815) |
| Mean annual rainfall | 61 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | BMP Analysis | Site (illustrative) |
| Catchment 1: Watershed (Watershed Characteristics) | ||
| Land use, pre / post | Agricultural - Pasture / High-Intensity Commercial | Site (illustrative) |
| Area, pre / post | 5 / 5 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 61 / 80 | Site (illustrative) |
| DCIA, pre / post | 0 / 70 % | Site (illustrative) |
| EMC TN, pre / post | 3.030 / 2.400 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.593 / 0.345 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Stormwater Harvesting (worksheet) | ||
| Max available harvest volume | 1.0 ac-ft | Design (illustrative) |
| Harvest rate | 0.8 in/week | Design (illustrative) |
| Area available for irrigation | 3 ac | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Stormwater harvesting: 5 ac commercial site, Zone 5; Meteorological zone Florida Zone 5; Mean annual rainfall 61.00 in; Type of analysis BMP Analysis. (To follow along with the finished project instead, choose File ▸ Open and open
stormwater-harvesting-commercial.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Watershed and enter: Land use (pre) Agricultural - Pasture; Land use (post) High-Intensity Commercial; Area (pre) 5.00 ac; Area (post) 5.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 80.00; DCIA (post) 70.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.613; Runoff volume (post) 15.580 ac-ft/yr; Nitrogen load (post) 46.106 kg/yr; Phosphorus load (post) 6.628 kg/yr.

The catchment Watershed: its Entry tab. With Watershed selected, press Add Treatment and choose Stormwater Harvesting. On its Entry tab type the Treatment name Stormwater Harvesting (BMPFast 2 starts it as “Stormwater Harvesting 1”) and enter: Total contributing area 5.00 ac; Area available for irrigation 3.00 ac; Maximum available harvest volume 1.00 ac-ft; Harvest rate 0.80 in/week. The results are calculated as you type: Effective impervious area 3.06 ac; Harvest volume over the effective impervious area 0.81 in; Nitrogen removal provided 62.02 %; Phosphorus removal provided 62.02 %.

The treatment Stormwater Harvesting: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment Stormwater Harvesting: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Watershed Outlet Stormwater Harvesting A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.060 / 0.613 |
| Runoff, pre / post | 1.530 / 15.580 ac-ft/yr |
| TN load, pre / post | 5.716 / 46.106 kg/yr |
| TP load, pre / post | 1.119 / 6.628 kg/yr |
| Stormwater Harvesting: computed by BMPFast | |
| Treatment depth | 0.809 in |
| Hydraulic capture efficiency | 62.02 % |
| Provided TN / TP removal | 62.02 % / 62.02 % |
| TN load in → out | 46.106 → 17.513 kg/yr |
| TP load in → out | 6.628 → 2.517 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 46.106 → 17.513 kg/yr |
| TP load: catchments → outlet | 6.628 → 2.517 kg/yr |
| Provided removal TN / TP | 62.0 % / 62.0 % |
The BMP report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 17.513 kg/yr | 17.513 kg/yr | same |
| Phosphorus leaving the site | 2.517 kg/yr | 2.517 kg/yr | same |
| Site removal, nitrogen | 62.016 % | 62.016 % | same |
| Site removal, phosphorus | 62.016 % | 62.016 % | same |
| Watershed: Stormwater Harvesting removal, nitrogen | 62.016 % | 62.016 % | same |
| Watershed: Stormwater Harvesting removal, phosphorus | 62.016 % | 62.016 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.613 × 5.00 ac × 61.0 in / 12 | |
| = 15.580 ac-ft/yr (program 15.580). |
| TN load | = EMC × runoff × 1.233 |
| = 2.400 × 15.580 × 1.233 | |
| = 46.106 kg/yr (program 46.106) |
| TP load | = 0.345 × 15.580 × 1.233 |
| = 6.628 kg/yr (program 6.628). |
1.233 kg is 1 mg/L in 1 ac-ft.
REV coordinates.
| Effective impervious area | = area × ROC |
| = 5.00 × 0.613 | |
| = 3.065 ac (program 3.065). |
| x | = volume × 12 / EIA |
| = 1.00 × 12 / 3.065 | |
| = 3.9152 in (program 3.9152) |
| y | = rate × irrigated area / 7 / EIA |
| = 0.80 × 3.00 / 7 / 3.065 | |
| = 0.1119 in/day (program 0.1119). |
Capture. The REV curves of Florida Zone 5 at (x, y) give 62.02 %, the TN and TP removal. Demand 3.389 MG/yr, supply 3.148 MG/yr, supplemental water 0.240 MG/yr (Harvesting and Greenroof Methodology).
Load out.
| TN out | = load in × (1 − removal) |
| = 46.106 × (1 − 62.02 / 100) | |
| = 17.513 kg/yr (program 17.513) |
| TP out | = 6.628 × (1 − 62.02 / 100) |
| = 2.517 kg/yr (program 2.517). |
The program’s Equations page
5Files
- stormwater-harvesting-commercial.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- stormwater-harvesting-commercial.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Stormwater Harvesting (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Stormwater Harvesting — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.