SoftwarePlus.ai

All programs › BMPFast › Sample problems

Stormwater harvesting from a pond, Zone 5

1 ac-ft harvested at 0.8 in/week over 3 ac; BMP Analysis, Zone 5, 61 in.

1The problem

A 5-acre commercial site in Zone 5 (61 in) drains to a pond from which 1 ac-ft can be harvested to irrigate 3 ac at 0.8 in/week (the pond and irrigation of Example Problem 4 of the BMP Trains manual, on this site).

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 5Zone map (help page 815)
Mean annual rainfall61 inMean annual rainfall map (help page 815)
Performance standard (analysis type)BMP AnalysisSite (illustrative)
Catchment 1: Watershed (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / High-Intensity CommercialSite (illustrative)
Area, pre / post5 / 5 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 80Site (illustrative)
DCIA, pre / post0 / 70 %Site (illustrative)
EMC TN, pre / post3.030 / 2.400 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.345 mg/LBMPFast land use table (AH Vol I Table 9.2)
Stormwater Harvesting (worksheet)
Max available harvest volume1.0 ac-ftDesign (illustrative)
Harvest rate0.8 in/weekDesign (illustrative)
Area available for irrigation3 acDesign (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast

  1. Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Stormwater harvesting: 5 ac commercial site, Zone 5, choose Florida Zone 5, enter 61 in of mean annual rainfall and choose the performance standard BMP Analysis.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment. For Catchment 1 type the name Watershed, choose the land uses Agricultural - Pasture (pre) and High-Intensity Commercial (post), enter the areas 5 and 5 ac, the non-DCIA curve numbers 61 and 80 and the DCIA 0 and 70 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

    Watershed Characteristics Worksheet (1. Enter Catchment).
    Watershed Characteristics Worksheet (1. Enter Catchment).
  3. Press 2. Enter Treatment and then Stormwater Harvesting. On the Stormwater Harvesting worksheet: Max available harvest volume 1.0 ac-ft; Harvest rate 0.8 in/week; Area available for irrigation 3 ac. Press Calculate. The report on the worksheet shows the inputs and the results.

    The BMP worksheet after Calculate: the report on the left.
    The BMP worksheet after Calculate: the report on the left.
  4. Press the same button again, now labelled Equations: the worksheet shows each equation with this problem’s values. Press Back to return to the treatment options.

    The same worksheet showing Equations: each equation with this problem’s values.
    The same worksheet showing Equations: each equation with this problem’s values.
  5. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Stormwater Harvesting as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
  6. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Summary Report (4. Summary Report) in the Report Viewer.
    The Summary Report (4. Summary Report) in the Report Viewer.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.060 / 0.613
Runoff, pre / post1.530 / 15.580 ac-ft/yr
TN load, pre / post5.716 / 46.106 kg/yr
TP load, pre / post1.119 / 6.628 kg/yr
Stormwater Harvesting: computed by BMPFast
Treatment depth0.809 in
Hydraulic capture efficiency62.02 %
Provided TN / TP removal62.02 % / 62.02 %
TN load in → out46.106 → 17.513 kg/yr
TP load in → out6.628 → 2.517 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet46.106 → 17.513 kg/yr
TP load: catchments → outlet6.628 → 2.517 kg/yr
Provided removal TN / TP62.0 % / 62.0 %

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

REV coordinates.

Capture. The REV curves of Florida Zone 5 at (x, y) give 62.02 %, the TN and TP removal. Demand 3.389 MG/yr, supply 3.148 MG/yr, supplemental water 0.240 MG/yr (Harvesting and Greenroof Methodology).

Load out.

The program’s Equations page

Open this report on its own page.

5Files

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.