BMPFast sample project: wet ponds in series, All sites non-exempted.

1The problem

The BMPFast sample project Detention in series, 2020 TAC manual page 194 (three catchments with wet ponds in series, Zone 4, All sites non-exempted). Print the compliance report laid out like the ERP Applicant’s Handbook Vol I, Section 9.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 4Zone map (help page 815)
Mean annual rainfall52 inMean annual rainfall map (help page 815)
Performance standard (analysis type)All sites non-exemptedBMPFast sample project
Catchment 1: upstream one (Watershed Characteristics)
Land use, pre / postAgricultural - Citrus / User Defined ValuesBMPFast sample project
Area, pre / post20.75 / 20.75 acBMPFast sample project
Non-DCIA curve number, pre / post68.3 / 76.12BMPFast sample project
DCIA, pre / post0 / 17.9 %BMPFast sample project
EMC TN, pre / post2.110 / 1.816 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.180 / 0.453 mg/LBMPFast land use table (AH Vol I Table 9.2)
Wet pond area (no loading)0.79 acBMPFast sample project
BMP used in routingWet Detention: permanent pool 1 ac-ft; There is a littoral zone ticked; MAPs credit 0 %BMPFast sample project
Routes toCatchment 2BMPFast sample project
Catchment 2: Catchment 2 (Watershed Characteristics)
Land use, pre / postAgricultural - Citrus / User Defined ValuesBMPFast sample project
Area, pre / post25.13 / 25.13 acBMPFast sample project
Non-DCIA curve number, pre / post68.3 / 76.12BMPFast sample project
DCIA, pre / post0 / 17.8 %BMPFast sample project
EMC TN, pre / post2.110 / 1.715 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.180 / 0.407 mg/LBMPFast land use table (AH Vol I Table 9.2)
Wet pond area (no loading)1.55 acBMPFast sample project
BMP used in routingWet Detention: permanent pool 1.25 ac-ft; There is a littoral zone ticked; MAPs credit 0 %BMPFast sample project
Routes toCatchment 3BMPFast sample project
Catchment 3: Catchment 0 (Watershed Characteristics)
Land use, pre / postAgricultural - Citrus / User Defined ValuesBMPFast sample project
Area, pre / post37.41 / 37.41 acBMPFast sample project
Non-DCIA curve number, pre / post68.3 / 84BMPFast sample project
DCIA, pre / post0 / 19 %BMPFast sample project
EMC TN, pre / post2.110 / 1.816 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.180 / 0.453 mg/LBMPFast land use table (AH Vol I Table 9.2)
Wet pond area (no loading)1.70 acBMPFast sample project
BMP used in routingWet Detention: permanent pool 2.5 ac-ft; There is a littoral zone unticked; MAPs credit 0 %BMPFast sample project
Routes tothe OutletBMPFast sample project

Find: what each report shows and where its numbers come from.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Detention in series 2020 TAC manual page 194; Meteorological zone Florida Zone 4; Mean annual rainfall 52.00 in; Type of analysis All sites non-exempted. (To follow along with the finished project instead, choose File ▸ Open and open reports-ahvi-compliance.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name upstream one and enter: Land use (pre) Agricultural - Citrus; Land use (post) User Defined Values; Area (pre) 20.75 ac; Area (post) 20.75 ac; Non-DCIA curve number (pre) 68.30; Non-DCIA curve number (post) 76.12; DCIA (post) 17.90 %; Nitrogen EMC (post) 1.816 mg/L; Phosphorus EMC (post) 0.453 mg/L; Wet pond area (no loading from this area) 0.79 ac. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.232; Runoff volume (post) 20.077 ac-ft/yr; Nitrogen load (post) 44.954 kg/yr; Phosphorus load (post) 11.214 kg/yr.

    The catchment upstream one: its Entry tab.
    The catchment upstream one: its Entry tab.
  3. With upstream one selected, press Add Treatment and choose Wet Detention. On its Entry tab type the Treatment name Wet Detention (BMPFast 2 starts it as “Wet Detention 1”) and enter: Permanent pool volume 1.000 ac-ft; How the littoral zone counts Littoral zone credit (BMPFast 2); There is a littoral zone Yes; Littoral zone credit 10.0 %. The results are calculated as you type: Average residence time 18.18 days; Permanent pool volume for 31 days residence 1.71 ac-ft; Nitrogen removal provided 45.26 %; Phosphorus removal provided 70.40 %.

    The treatment Wet Detention: its Entry tab.
    The treatment Wet Detention: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal in this catchment, as a report to print or save.

    The treatment Wet Detention: its Report tab.
    The treatment Wet Detention: its Report tab.
  5. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Catchment 2 and enter: Land use (pre) Agricultural - Citrus; Land use (post) User Defined Values; Area (pre) 25.13 ac; Area (post) 25.13 ac; Non-DCIA curve number (pre) 68.30; Non-DCIA curve number (post) 76.12; DCIA (post) 17.80 %; Nitrogen EMC (post) 1.715 mg/L; Phosphorus EMC (post) 0.407 mg/L; Wet pond area (no loading from this area) 1.55 ac. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.231; Runoff volume (post) 23.645 ac-ft/yr; Nitrogen load (post) 50.000 kg/yr; Phosphorus load (post) 11.866 kg/yr.

    The catchment Catchment 2: its Entry tab.
    The catchment Catchment 2: its Entry tab.
  6. With Catchment 2 selected, press Add Treatment and choose Wet Detention. On its Entry tab type the Treatment name Wet Detention (BMPFast 2 starts it as “Wet Detention 1”) and enter: Permanent pool volume 1.250 ac-ft; How the littoral zone counts Littoral zone credit (BMPFast 2); There is a littoral zone Yes; Littoral zone credit 10.0 %. The results are calculated as you type: Average residence time 19.30 days; Permanent pool volume for 31 days residence 2.01 ac-ft; Nitrogen removal provided 45.66 %; Phosphorus removal provided 70.86 %. These are the treatment alone, on its own catchment’s runoff; the routing calculates it again with the water that drains to it from upstream, so the routing’s numbers below differ.

    The treatment Wet Detention: its Entry tab.
    The treatment Wet Detention: its Entry tab.
  7. Open the treatment’s Report tab: its inputs and removal in this catchment, as a report to print or save.

    The treatment Wet Detention: its Report tab.
    The treatment Wet Detention: its Report tab.
  8. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Catchment 0 and enter: Land use (pre) Agricultural - Citrus; Land use (post) User Defined Values; Area (pre) 37.41 ac; Area (post) 37.41 ac; Non-DCIA curve number (pre) 68.30; Non-DCIA curve number (post) 84.00; DCIA (post) 19.00 %; Nitrogen EMC (post) 1.816 mg/L; Phosphorus EMC (post) 0.453 mg/L; Wet pond area (no loading from this area) 1.70 ac. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.295; Runoff volume (post) 45.668 ac-ft/yr; Nitrogen load (post) 102.256 kg/yr; Phosphorus load (post) 25.508 kg/yr.

    The catchment Catchment 0: its Entry tab.
    The catchment Catchment 0: its Entry tab.
  9. With Catchment 0 selected, press Add Treatment and choose Wet Detention. On its Entry tab type the Treatment name Wet Detention (BMPFast 2 starts it as “Wet Detention 1”) and enter: Permanent pool volume 2.500 ac-ft; How the littoral zone counts Littoral zone credit (BMPFast 2). The results are calculated as you type: Average residence time 19.98 days; Permanent pool volume for 31 days residence 3.88 ac-ft; Nitrogen removal provided 35.88 %; Phosphorus removal provided 61.12 %. These are the treatment alone, on its own catchment’s runoff; the routing calculates it again with the water that drains to it from upstream, so the routing’s numbers below differ.

    The treatment Wet Detention: its Entry tab.
    The treatment Wet Detention: its Entry tab.
  10. Open the treatment’s Report tab: its inputs and removal in this catchment, as a report to print or save.

    The treatment Wet Detention: its Report tab.
    The treatment Wet Detention: its Report tab.
  11. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment usedRunoff from upstream catchments
    upstream oneCatchment 2Wet Detention
    Catchment 2Catchment 0Wet DetentionTreated with this catchment's own runoff
    Catchment 0OutletWet DetentionTreated with this catchment's own runoff

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  12. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

ResultValue
Site (all catchments, at the outlet)
TN load: catchments → outlet197.210 → 101.590 kg/yr
TP load: catchments → outlet48.587 → 13.453 kg/yr
Provided removal TN / TP48.5 % / 72.3 %
Required removal TN / TP (Maximum % Removal)68.9 % (not met) / 89.2 % (not met)

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site101.590 kg/yr113.730 kg/yrdiffers
Phosphorus leaving the site13.453 kg/yr16.166 kg/yrdiffers
Site removal, nitrogen48.486 %42.330 %differs
Site removal, phosphorus72.311 %66.727 %differs
upstream one: Wet Detention removal, nitrogen45.256 %35.256 %differs
upstream one: Wet Detention removal, phosphorus70.403 %60.403 %differs
Catchment 2: Wet Detention removal, nitrogen40.816 %30.816 %differs
Catchment 2: Wet Detention removal, phosphorus66.245 %56.245 %differs
Catchment 0: Wet Detention removal, nitrogen30.614 %27.553 %differs
Catchment 0: Wet Detention removal, phosphorus56.083 %50.475 %differs

BMPFast 2 gives a different number for: Nitrogen leaving the site, Phosphorus leaving the site, Site removal, nitrogen, Site removal, phosphorus, upstream one: Wet Detention removal, nitrogen, upstream one: Wet Detention removal, phosphorus, Catchment 2: Wet Detention removal, nitrogen, Catchment 2: Wet Detention removal, phosphorus, Catchment 0: Wet Detention removal, nitrogen, Catchment 0: Wet Detention removal, phosphorus. See the notes below the table.

When BMPFast 2 opened the v1 file it said:

  • upstream one, Wet Detention: BMPFast 2 takes the wet pond equations as a pond without a littoral zone, and adds a littoral zone credit of 10 percentage points (Appendix O's maximum) to this pond's removal, so it is higher than v1 shows; lower Littoral zone credit if your permit reviewer allows less. To calculate as v1, choose "Reduce without a littoral zone (v1)" in How the littoral zone counts (Design values) on the treatment's Entry tab.
  • Catchment 2, Wet Detention: BMPFast 2 takes the wet pond equations as a pond without a littoral zone, and adds a littoral zone credit of 10 percentage points (Appendix O's maximum) to this pond's removal, so it is higher than v1 shows; lower Littoral zone credit if your permit reviewer allows less. To calculate as v1, choose "Reduce without a littoral zone (v1)" in How the littoral zone counts (Design values) on the treatment's Entry tab.
  • Catchment 0, Wet Detention: BMPFast 2 takes the wet pond equations as a pond without a littoral zone, and this pond has none, so its removal is not multiplied by 0.90 as v1 does: it is higher than v1 shows. To calculate as v1, choose "Reduce without a littoral zone (v1)" in How the littoral zone counts (Design values) on the treatment's Entry tab.

4Check

Nothing is recalculated. The compliance report re-presents the project’s inputs and results in the Handbook’s order and terms; apart from unit conversions (kg and lb) its numbers are those of the Summary and Complete reports: outlet TN 101.590 kg/yr (223.966 lb/yr) and TP 13.453 kg/yr (help page 813).

5Files

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.