1The problem
The same catchment as Example Problem 5 with two retention basins in series.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 5 | Zone map (help page 815) |
| Mean annual rainfall | 61 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Specified Removal Efficiency | BMPFast sample project |
| Specified removal: TN / TP | 55 % / 80 % | BMPFast sample project |
| Catchment 1: Highway Section 206 (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Wet Flatwoods / Highway | BMPFast sample project |
| Area, pre / post | 6 / 6 ac | BMPFast sample project |
| Non-DCIA curve number, pre / post | 80 / 80 | BMPFast sample project |
| DCIA, pre / post | 0 / 60 % | BMPFast sample project |
| EMC TN, pre / post | 1.213 / 1.250 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.021 / 0.173 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Wet pond area (no loading) | 1.00 ac | BMPFast sample project |
| BMPs in Series | ||
| BMP 1: Permeable Pavement | 1.00 ac, storage 0.275 ac-ft | BMPFast sample project |
| BMP 2: Retention | treatment depth 0.751 in (0.313 ac-ft) | BMPFast sample project |
Find: the removal of the series as one system, and the loads leaving the site.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Ex # 5 ret to ret one catch; Meteorological zone Florida Zone 5; Mean annual rainfall 61.00 in; Type of analysis Specified Removal Efficiency; Nitrogen Removal Performance Specified 55 %; Phosphorus Removal Performance Specified 80 %. (To follow along with the finished project instead, choose File ▸ Open and open
series-retention-retention.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Highway Section 206 and enter: Land use (pre) Undeveloped - Wet Flatwoods; Land use (post) Highway; Area (pre) 6.00 ac; Area (post) 6.00 ac; Non-DCIA curve number (pre) 80.00; Non-DCIA curve number (post) 80.00; DCIA (post) 60.00 %; Wet pond area (no loading from this area) 1.00 ac. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.547; Runoff volume (post) 13.903 ac-ft/yr; Nitrogen load (post) 21.428 kg/yr; Phosphorus load (post) 2.966 kg/yr.

The catchment Highway Section 206: its Entry tab. With Highway Section 206 selected, press Add Treatment and choose Retention. On its Entry tab type the Treatment name Retention (BMPFast 2 starts it as “Retention 1”) and enter: Provided retention volume 0.313 ac-ft; Time to recover the design volume 72.00 hr; Media mix None. The results are calculated as you type: Treatment depth 0.751 in; Nitrogen removal provided 62.14 %; Phosphorus removal provided 62.14 %.

The treatment Retention: its Entry tab. With Highway Section 206 selected, press Add Treatment and choose Permeable Pavement. On its Entry tab type the Treatment name Permeable Pavement (BMPFast 2 starts it as “Permeable Pavement 1”) and enter: Permeable pavement area 1.00 ac; Time to recover the design volume 72.00 hr; PowerBLOCK(TM) thickness 4.00 in; #57 rock(non-calcareous) thickness 10.00 in; #89 pea rock thickness 4.00 in; Media mix None. The results are calculated as you type: Total storage of the pavement 0.275 ac-ft; Treatment depth 0.660 in; Nitrogen removal provided 57.85 %; Phosphorus removal provided 57.85 %.

The treatment Permeable Pavement: its Entry tab. With Highway Section 206 selected, press Add Treatment and choose BMPs in Series. On its Entry tab type the Treatment name BMPs in Series and choose, upstream first: BMP 1 (upstream) Permeable Pavement; BMP 2 Retention; BMP 3 (none); A series that starts with retention is calculated as One retention system (v1's method). Each member is a treatment of this catchment (the steps above). The results are at the bottom of the tab: Equivalent treatment depth 1.41 in; Equivalent treatment efficiency 78.91 %; Nitrogen removal provided 78.91 %; Phosphorus removal provided 78.91 %.

The treatment BMPs in Series: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment BMPs in Series: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Highway Section 206 Outlet BMPs in Series A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.157 / 0.547 |
| Runoff, pre / post | 4.788 / 13.903 ac-ft/yr |
| TN load, pre / post | 7.162 / 21.428 kg/yr |
| TP load, pre / post | 0.124 / 2.966 kg/yr |
| BMPs in Series: computed by BMPFast | |
| Equivalent Treatment Depth / Efficiency | 1.411 in / 78.91 % |
| Treatment depth | 1.411 in |
| Hydraulic capture efficiency | 78.91 % |
| Provided TN / TP removal | 78.91 % / 78.91 % |
| TN load in → out | 21.428 → 4.520 kg/yr |
| TP load in → out | 2.966 → 0.626 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 21.428 → 4.520 kg/yr |
| TP load: catchments → outlet | 2.966 → 0.626 kg/yr |
| Provided removal TN / TP | 78.9 % / 78.9 % |
| Required removal TN / TP (Maximum % Removal) | 55.0 % (met) / 80.0 % (not met) |
The BMPs in Series Equations report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 4.520 kg/yr | 4.520 kg/yr | same |
| Phosphorus leaving the site | 0.626 kg/yr | 0.626 kg/yr | same |
| Site removal, nitrogen | 78.908 % | 78.908 % | same |
| Site removal, phosphorus | 78.908 % | 78.908 % | same |
| Highway Section 206: Multiple BMP removal, nitrogen | 78.908 % | 78.908 % | same |
| Highway Section 206: Multiple BMP removal, phosphorus | 78.908 % | 78.908 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
When BMPFast 2 opened the v1 file it said:
- Highway Section 206, Wet Detention: BMPFast 2 takes the wet pond equations as a pond without a littoral zone, and adds a littoral zone credit of 10 percentage points (Appendix O's maximum) to this pond's removal, so it is higher than v1 shows; lower Littoral zone credit if your permit reviewer allows less. To calculate as v1, choose "Reduce without a littoral zone (v1)" in How the littoral zone counts (Design values) on the treatment's Entry tab.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.547 × 5.00 ac × 61.0 in / 12 | |
| = 13.903 ac-ft/yr (program 13.903). |
| TN load | = EMC × runoff × 1.233 |
| = 1.250 × 13.903 × 1.233 | |
| = 21.428 kg/yr (program 21.428) |
| TP load | = 0.173 × 13.903 × 1.233 |
| = 2.966 kg/yr (program 2.966). |
1.233 kg is 1 mg/L in 1 ac-ft.
Retention in series. Retention BMPs in a row are one system: their treatment depths add to the Equivalent Treatment Depth of 1.411 in, and the retention tables at that depth give the system’s capture, 78.91 % (program TN removal 78.91 %). Adding each basin’s removal as a treatment train would overstate it, because the second basin sees only the larger storms the first one passes (Strand Based Routing for Retention in Series).
Load out.
| TN out | = load in × (1 − removal) |
| = 21.428 × (1 − 78.91 / 100) | |
| = 4.520 kg/yr (program 4.520) |
| TP out | = 2.966 × (1 − 78.91 / 100) |
| = 0.626 kg/yr (program 0.626). |
The standard is not met, and that is expected. “Specified Removal Efficiency” requires the TN and TP percentages entered for the project, for example a TMDL or BMAP criterion (AH Vol I 8.3.4(b), or as the Agency directs). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 66.6 % and TP 95.8 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 55.0 % and TP 80.0 %. This problem shows what this design removes (78.9 % / 78.9 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).
5Files
- series-retention-retention.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- series-retention-retention.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- BMPs in Series (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- BMPs in Series — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
- BMPs in Series (help page 504)
- Strand Based Routing for Retention in Series (help page 4824)
- Comparison of Methods for Wet Detention Ponds in Series (help page 4869)
- Comparison of Methods for Filters in Series (help page 4825)
- Retention Methodology (help page 4537)
- Wet Detention Methodology (help page 4590)
- Link to Solution in BMPFast Version 1