SoftwarePlus.ai

All programs › BMPFast › BMPFast 2 sample problems

Permeable pavement in a redevelopment

1.2 ac of FlexiPave over pea rock and #57 rock; Redevelopment, Zone 4.

1The problem

A 3-acre commercial redevelopment replaces 1.2 ac of asphalt with FlexiPave (6 in) over #89 pea rock (4 in) and #57 rock (18 in).

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 4Zone map (help page 815)
Mean annual rainfall52 inMean annual rainfall map (help page 815)
Performance standard (analysis type)RedevelopmentSite (illustrative)
Catchment 1: Commercial site (Watershed Characteristics)
Land use, pre / postUndeveloped - Mesic Flatwoods / High-Intensity CommercialSite (illustrative)
Area, pre / post3 / 3 acSite (illustrative)
Non-DCIA curve number, pre / post70 / 80Site (illustrative)
DCIA, pre / post0 / 70 %Site (illustrative)
EMC TN, pre / post1.087 / 2.400 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.043 / 0.345 mg/LBMPFast land use table (AH Vol I Table 9.2)
Layers (thickness, sustainable void)#89 pea rock 4 in, 25 %, #57 rock(non-calcareous) 18 in, 21 %, FlexiPaveTM 6 in, 20 %Design; voids from the program’s pavement table
Permeable Pavement (worksheet)
Permeable Pavement Area1.2 acDesign (illustrative)
Time to recover design volume72 hrDesign (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Permeable pavement: redevelopment; Meteorological zone Florida Zone 4; Mean annual rainfall 52.00 in; Type of analysis Redevelopment. (To follow along with the finished project instead, choose File ▸ Open and open permeable-pavement-redevelopment.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Commercial site and enter: Land use (pre) Undeveloped - Mesic Flatwoods; Land use (post) High-Intensity Commercial; Area (pre) 3.00 ac; Area (post) 3.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 80.00; DCIA (post) 70.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.615; Runoff volume (post) 7.995 ac-ft/yr; Nitrogen load (post) 23.659 kg/yr; Phosphorus load (post) 3.401 kg/yr.

    The catchment Commercial site: its Entry tab.
    The catchment Commercial site: its Entry tab.
  3. With Commercial site selected, press Add Treatment and choose Permeable Pavement. On its Entry tab type the Treatment name Permeable Pavement (BMPFast 2 starts it as “Permeable Pavement 1”) and enter: Permeable pavement area 1.20 ac; Time to recover the design volume 72.00 hr; FlexiPaveTM thickness 6.00 in; #57 rock(non-calcareous) thickness 18.00 in; #89 pea rock thickness 4.00 in. The results are calculated as you type: Total storage of the pavement 0.598 ac-ft; Treatment depth 2.392 in; Nitrogen removal provided 92.15 %; Phosphorus removal provided 92.15 %.

    The treatment Permeable Pavement: its Entry tab.
    The treatment Permeable Pavement: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

    The treatment Permeable Pavement: its Report tab.
    The treatment Permeable Pavement: its Report tab.
  5. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment used
    Commercial siteOutletPermeable Pavement

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  6. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.071 / 0.615
Runoff, pre / post0.923 / 7.995 ac-ft/yr
TN load, pre / post1.237 / 23.659 kg/yr
TP load, pre / post0.049 / 3.401 kg/yr
Permeable Pavement: computed by BMPFast
Treatment depth2.392 in
Hydraulic capture efficiency92.15 %
Provided TN / TP removal92.15 % / 92.15 %
TN load in → out23.659 → 1.857 kg/yr
TP load in → out3.401 → 0.267 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet23.659 → 1.857 kg/yr
TP load: catchments → outlet3.401 → 0.267 kg/yr
Provided removal TN / TP92.2 % / 92.2 %
Required removal TN / TP (Maximum % Removal)45.0 % (met) / 80.0 % (met)

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site1.857 kg/yr1.857 kg/yrsame
Phosphorus leaving the site0.267 kg/yr0.267 kg/yrsame
Site removal, nitrogen92.152 %92.152 %same
Site removal, phosphorus92.152 %92.152 %same
Commercial site: Permeable Pavement removal, nitrogen92.152 %92.152 %same
Commercial site: Permeable Pavement removal, phosphorus92.152 %92.152 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Storage.

Treatment depth.

The depth is taken over the whole catchment (3.00 ac): the pavement treats the rain falling on it and the runoff of the 1.80 ac draining onto it.

Capture. The retention efficiency tables for Florida Zone 4 at a treatment depth of 2.392 in, non-DCIA CN 80.00 and DCIA 70.0 % give a hydraulic capture of 92.15 % (AH Vol I Appendix O; read the same tables with Calculators ▸ Retention Efficiency Tables, help page 4325). Permeable pavement is a retention BMP: the removal equals the capture.

Load out.

The program’s Equations page

Open this report on its own page.

5Files

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.