Vegetated natural buffer behind homes (retention)

A 50 ft buffer, 600 ft long; BMP Analysis, Zone 2.

1The problem

The back yards of a 2-acre row of homes (145 ft deep) drain across an undisturbed natural buffer 50 ft wide and 600 ft long that infiltrates.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)BMP AnalysisSite (illustrative)
Catchment 1: Backyards (Watershed Characteristics)
Land use, pre / postUndeveloped - Mesic Flatwoods / Single-FamilySite (illustrative)
Area, pre / post2 / 2 acSite (illustrative)
Non-DCIA curve number, pre / post70 / 75Site (illustrative)
DCIA, pre / post0 / 20 %Site (illustrative)
EMC TN, pre / post1.087 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.043 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
Vegetated Natural Buffer (worksheet)
Retention or Detention + PlantsRetentionDesign (illustrative)
Buffer width50 ftDesign (illustrative)
Buffer length600 ftDesign (illustrative)
Storage depth1 ftDesign (illustrative)
Width of feeder area145 ftDesign (illustrative)
Soil storage capacity0.2 in/inDesign (illustrative)
Buffer width slope2 %Design (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Vegetated natural buffer: retention; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis BMP Analysis. (To follow along with the finished project instead, choose File ▸ Open and open buffer-retention.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Backyards and enter: Land use (pre) Undeveloped - Mesic Flatwoods; Land use (post) Single-Family; Area (pre) 2.00 ac; Area (post) 2.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 75.00; DCIA (post) 20.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.225; Runoff volume (post) 1.875 ac-ft/yr; Nitrogen load (post) 4.092 kg/yr; Phosphorus load (post) 0.756 kg/yr.

    The catchment Backyards: its Entry tab.
    The catchment Backyards: its Entry tab.
  3. With Backyards selected, press Add Treatment and choose Vegetated Natural Buffer. On its Entry tab type the Treatment name Vegetated Natural Buffer (BMPFast 2 starts it as “Vegetated Natural Buffer 1”) and enter: Retention or detention + plants Retention; Buffer width 50.00 ft; Buffer length 600.00 ft; Storage depth 1.00 ft; Width of the feeder area 145.00 ft; Soil storage capacity 0.20 in/in; Buffer width slope 2.00 %. The results are calculated as you type: Runoff (feeder) area 1.997 ac; Buffer area 0.689 ac; Treatment depth 0.615 in; Nitrogen removal provided 75.73 %; Phosphorus removal provided 75.73 %.

    The treatment Vegetated Natural Buffer: its Entry tab.
    The treatment Vegetated Natural Buffer: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

    The treatment Vegetated Natural Buffer: its Report tab.
    The treatment Vegetated Natural Buffer: its Report tab.
  5. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment used
    BackyardsOutletVegetated Natural Buffer

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  6. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.057 / 0.225
Runoff, pre / post0.475 / 1.875 ac-ft/yr
TN load, pre / post0.637 / 4.092 kg/yr
TP load, pre / post0.025 / 0.756 kg/yr
Vegetated Natural Buffer: computed by BMPFast
Treatment depth0.615 in
Hydraulic capture efficiency75.73 %
Provided TN / TP removal75.73 % / 75.73 %
TN load in → out4.092 → 0.993 kg/yr
TP load in → out0.756 → 0.183 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet4.092 → 0.993 kg/yr
TP load: catchments → outlet0.756 → 0.183 kg/yr
Provided removal TN / TP75.7 % / 75.7 %

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site0.993 kg/yr0.993 kg/yrsame
Phosphorus leaving the site0.183 kg/yr0.183 kg/yrsame
Site removal, nitrogen75.731 %75.731 %same
Site removal, phosphorus75.731 %75.731 %same
Backyards: Vegetated Natural Buffer removal, nitrogen75.731 %75.731 %same
Backyards: Vegetated Natural Buffer removal, phosphorus75.731 %75.731 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Treatment depth.

Capture. The retention efficiency tables for Florida Zone 2 at a treatment depth of 0.615 in, non-DCIA CN 75.00 and DCIA 20.0 % give a hydraulic capture of 75.73 % (AH Vol I Appendix O; read the same tables with Calculators ▸ Retention Efficiency Tables, help page 4325). As a retention system the removal equals the capture.

Load out.

The program’s Equations page

Open this report on its own page.

5Files

  • buffer-retention.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
  • buffer-retention.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
  • Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Vegetated Natural Buffer (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Vegetated Natural Buffer — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.