Tree wells with an underdrain and media (detention)

Twelve 10 × 10 ft tree wells with B&G CTS12; Specified Removal 50 / 50 %, Zone 4.

1The problem

A 1-acre plaza drains to twelve 10 ft × 10 ft tree wells with an underdrain (detention) and B&G CTS12 media. The permit asks for 50 % TN and TP.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 4Zone map (help page 815)
Mean annual rainfall52 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Specified Removal EfficiencySite (illustrative)
Specified removal: TN / TP50 % / 50 %Site (illustrative)
Catchment 1: Plaza (Watershed Characteristics)
Land use, pre / postUndeveloped - Mesic Flatwoods / High-Intensity CommercialSite (illustrative)
Area, pre / post1 / 1 acSite (illustrative)
Non-DCIA curve number, pre / post70 / 80Site (illustrative)
DCIA, pre / post0 / 90 %Site (illustrative)
EMC TN, pre / post1.087 / 2.400 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.043 / 0.345 mg/LBMPFast land use table (AH Vol I Table 9.2)
Media mixB&G CTS12 (TN 60 %, TP 90 %)BMPFast media table (help page 817)
Tree Well (worksheet)
Retention or DetentionDetentionDesign (illustrative)
Vegetated area (tree well) depth3 ftDesign (illustrative)
Tree well storage (above media + canopy capture)0.5 ftDesign (illustrative)
Vegetated area width10 ftDesign (illustrative)
Vegetated area length10 ftDesign (illustrative)
Number of tree well areas12Design (illustrative)
Sustainable water storage capacity of the soil0.25Design (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Tree wells: detention with underdrain; Meteorological zone Florida Zone 4; Mean annual rainfall 52.00 in; Type of analysis Specified Removal Efficiency; Conduct groundwater discharge analysis Yes; Nitrogen Removal Performance Specified 50 %; Phosphorus Removal Performance Specified 50 %. (To follow along with the finished project instead, choose File ▸ Open and open tree-well-detention.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Plaza and enter: Land use (pre) Undeveloped - Mesic Flatwoods; Land use (post) High-Intensity Commercial; Area (pre) 1.00 ac; Area (post) 1.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 80.00; DCIA (post) 90.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.754; Runoff volume (post) 3.267 ac-ft/yr; Nitrogen load (post) 9.669 kg/yr; Phosphorus load (post) 1.390 kg/yr.

    The catchment Plaza: its Entry tab.
    The catchment Plaza: its Entry tab.
  3. With Plaza selected, press Add Treatment and choose Tree Well. On its Entry tab type the Treatment name Tree Well (BMPFast 2 starts it as “Tree Well 1”) and enter: Tree well length 10.00 ft; Tree well width 10.00 ft; Tree well depth 3.00 ft; Tree well storage (above media + canopy capture) 0.50 ft; Sustainable water storage capacity of the soil 0.25; Number of tree well areas in the catchment 12; Retention or detention Detention; Media mix B&G CTS12; Is the media design residence time more than 2 hours? Yes; Media nitrogen reduction 60.00 %; Media phosphorus reduction 90.00 %. The results are calculated as you type: Retention volume 0.090 ac-ft; Treatment depth 1.074 in; Nitrogen removal provided 42.07 %; Phosphorus removal provided 63.10 %.

    The treatment Tree Well: its Entry tab.
    The treatment Tree Well: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

    The treatment Tree Well: its Report tab.
    The treatment Tree Well: its Report tab.
  5. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment used
    PlazaOutletTree Well

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  6. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.071 / 0.754
Runoff, pre / post0.308 / 3.267 ac-ft/yr
TN load, pre / post0.412 / 9.669 kg/yr
TP load, pre / post0.016 / 1.390 kg/yr
Tree Well: computed by BMPFast
Treatment depth1.074 in
Hydraulic capture efficiency70.11 %
Provided TN / TP removal42.07 % / 63.10 %
TN load in → out9.669 → 5.601 kg/yr
TP load in → out1.390 → 0.513 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet9.669 → 5.601 kg/yr
TP load: catchments → outlet1.390 → 0.513 kg/yr
Provided removal TN / TP42.1 % / 63.1 %
Required removal TN / TP (Maximum % Removal)50.0 % (not met) / 50.0 % (met)

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site5.601 kg/yr5.601 kg/yrsame
Phosphorus leaving the site0.513 kg/yr0.513 kg/yrsame
Site removal, nitrogen42.067 %42.067 %same
Site removal, phosphorus63.101 %63.101 %same
Plaza: Tree Well removal, nitrogen42.067 %42.067 %same
Plaza: Tree Well removal, phosphorus63.101 %63.101 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Storage (as the program calculates it).

The Tree Well Storage entered (0.50 ft) is not part of this equation; it is listed for review.

Treatment depth.

Capture. The retention efficiency tables for Florida Zone 4 at a treatment depth of 1.074 in, non-DCIA CN 80.00 and DCIA 90.0 % give a hydraulic capture of 70.11 % (AH Vol I Appendix O; read the same tables with Calculators ▸ Retention Efficiency Tables, help page 4325).

Removal.

A detention tree well discharges what it filters:

Load out.

The standard is not met, and that is expected. “Specified Removal Efficiency” requires the TN and TP percentages entered for the project, for example a TMDL or BMAP criterion (AH Vol I 8.3.4(b), or as the Agency directs). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 95.7 % and TP 98.8 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 50.0 % and TP 50.0 %. This problem shows what this design removes (42.1 % / 63.1 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).

The program’s Equations page

Open this report on its own page.

5Files

  • tree-well-detention.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
  • tree-well-detention.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
  • Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Tree Well (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Tree Well — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.