Tree wells with an underdrain and media (detention)
Twelve 10 × 10 ft tree wells with B&G CTS12; Specified Removal 50 / 50 %, Zone 4.
Help: Tree Well (help page 807) · Download the .bmpt · Link to Solution in BMPFast Version 2
1The problem
A 1-acre plaza drains to twelve 10 ft × 10 ft tree wells with an underdrain (detention) and B&G CTS12 media. The permit asks for 50 % TN and TP.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 4 | Zone map (help page 815) |
| Mean annual rainfall | 52 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Specified Removal Efficiency | Site (illustrative) |
| Specified removal: TN / TP | 50 % / 50 % | Site (illustrative) |
| Catchment 1: Plaza (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / High-Intensity Commercial | Site (illustrative) |
| Area, pre / post | 1 / 1 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 80 | Site (illustrative) |
| DCIA, pre / post | 0 / 90 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 2.400 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.345 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Media mix | B&G CTS12 (TN 60 %, TP 90 %) | BMPFast media table (help page 817) |
| Tree Well (worksheet) | ||
| Retention or Detention | Detention | Design (illustrative) |
| Vegetated area (tree well) depth | 3 ft | Design (illustrative) |
| Tree well storage (above media + canopy capture) | 0.5 ft | Design (illustrative) |
| Vegetated area width | 10 ft | Design (illustrative) |
| Vegetated area length | 10 ft | Design (illustrative) |
| Number of tree well areas | 12 | Design (illustrative) |
| Sustainable water storage capacity of the soil | 0.25 | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast
Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Tree wells: detention with underdrain, choose Florida Zone 4, enter 52 in of mean annual rainfall and choose the performance standard Specified Removal Efficiency, with TN 50 % and TP 50 %.

General Site Information (the main window). Press 1. Enter Catchment. For Catchment 1 type the name Plaza, choose the land uses Undeveloped - Mesic Flatwoods (pre) and High-Intensity Commercial (post), enter the areas 1 and 1 ac, the non-DCIA curve numbers 70 and 80 and the DCIA 0 and 90 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

Watershed Characteristics Worksheet (1. Enter Catchment). Press 2. Enter Treatment, then Tree Well, and on its worksheet press Media. Choose B&G CTS12 (TN 60 %, TP 90 % when all the runoff is treated) and press Back.

Enter Media Mix Information (the Media button). Press 2. Enter Treatment and then Tree Well. On the Tree Well worksheet: Retention or Detention Detention; Vegetated area (tree well) depth 3 ft; Tree well storage (above media + canopy capture) 0.5 ft; Vegetated area width 10 ft; Vegetated area length 10 ft; Number of tree well areas 12; Sustainable water storage capacity of the soil 0.25. Press Calculate. The report on the worksheet shows the inputs and the results.

The BMP worksheet after Calculate: the report on the left. Press the same button again, now labelled Equations: the worksheet shows each equation with this problem’s values. Press Back to return to the treatment options.

The same worksheet showing Equations: each equation with this problem’s values. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Tree Well as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

The Summary Report (4. Summary Report) in the Report Viewer.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.071 / 0.754 |
| Runoff, pre / post | 0.308 / 3.267 ac-ft/yr |
| TN load, pre / post | 0.412 / 9.669 kg/yr |
| TP load, pre / post | 0.016 / 1.390 kg/yr |
| Tree Well: computed by BMPFast | |
| Treatment depth | 1.074 in |
| Hydraulic capture efficiency | 70.11 % |
| Provided TN / TP removal | 42.07 % / 63.10 % |
| TN load in → out | 9.669 → 5.601 kg/yr |
| TP load in → out | 1.390 → 0.513 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 9.669 → 5.601 kg/yr |
| TP load: catchments → outlet | 1.390 → 0.513 kg/yr |
| Provided removal TN / TP | 42.1 % / 63.1 % |
| Required removal TN / TP (Maximum % Removal) | 50.0 % (not met) / 50.0 % (met) |
The BMP report
Open this report on its own page.
The Summary Report
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.754 × 1.00 ac × 52.0 in / 12 | |
| = 3.267 ac-ft/yr (program 3.267). |
| TN load | = EMC × runoff × 1.233 |
| = 2.400 × 3.267 × 1.233 | |
| = 9.669 kg/yr (program 9.669) |
| TP load | = 0.345 × 3.267 × 1.233 |
| = 1.390 kg/yr (program 1.390). |
1.233 kg is 1 mg/L in 1 ac-ft.
Storage (as the program calculates it).
| Storage per area | = length × width × (depth + soil storage capacity) / 43,560 |
| = 10 × 10 × (3.00 + 0.25) / 43,560, times 12 areas | |
| = 0.0895 ac-ft (program 0.0895). |
The Tree Well Storage entered (0.50 ft) is not part of this equation; it is listed for review.
Treatment depth.
| Depth | = storage × 12 / area |
| = 0.0895 ac-ft × 12 / 1.00 ac | |
| = 1.074 in (program 1.074). |
Capture. The retention efficiency tables for Florida Zone 4 at a treatment depth of 1.074 in, non-DCIA CN 80.00 and DCIA 90.0 % give a hydraulic capture of 70.11 % (AH Vol I Appendix O; read the same tables with Tools › Retention Efficiency Lookup Tables, help page 4325).
Removal.
A detention tree well discharges what it filters:
| removal | = capture × media reduction. |
| TN | = 70.11 × 60 / 100 |
| = 42.07 % (program 42.07) |
| TP | = 70.11 × 90 / 100 |
| = 63.10 % (program 63.10). |
Load out.
| TN out | = load in × (1 − removal) |
| = 9.669 × (1 − 42.07 / 100) | |
| = 5.601 kg/yr (program 5.601) |
| TP out | = 1.390 × (1 − 63.10 / 100) |
| = 0.513 kg/yr (program 0.513). |
The standard is not met, and that is expected. “Specified Removal Efficiency” requires the TN and TP percentages entered for the project, for example a TMDL or BMAP criterion (AH Vol I 8.3.4(b), or as the Agency directs). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 95.7 % and TP 98.8 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 50.0 % and TP 50.0 %. This problem shows what this design removes (42.1 % / 63.1 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).
The program’s Equations page
5Files
- tree-well-detention.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
- Equations page (worksheet) (as BMPFast shows it)
- Summary Report (as BMPFast shows it)
- BMP report (worksheet) (as BMPFast shows it)
6Help and methodology
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.