Rainwater harvesting at a school
A 30,000-gallon cistern on a flat concrete roof; Redevelopment + OFW, Zone 3.
Help: Rainwater Harvesting (help page 292) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
A 1-acre flat concrete school roof fills a 30,000-gallon cistern that irrigates 2 acres of fields at 1.5 in/week.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 3 | Zone map (help page 815) |
| Mean annual rainfall | 54 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Redevelopment + OFW | Site (illustrative) |
| Catchment 1: School roof (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / Conventional Roofs | Site (illustrative) |
| Area, pre / post | 1 / 1 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 98 | Site (illustrative) |
| DCIA, pre / post | 0 / 100 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 1.050 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.120 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Rainwater Harvesting (worksheet) | ||
| Roof type | CONCRETE, 0.2% SLOPE | Design (illustrative) |
| Contributing area | 43560 sf | Design (illustrative) |
| Available harvest volume | 30000 gal | Design (illustrative) |
| Harvest rate | 1.5 in/week | Design (illustrative) |
| Area available for irrigation | 87120 sf | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Rainwater harvesting: school, flat roof; Meteorological zone Florida Zone 3; Mean annual rainfall 54.00 in; Type of analysis Redevelopment + OFW. (To follow along with the finished project instead, choose File ▸ Open and open
rainwater-school.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name School roof and enter: Land use (pre) Undeveloped - Mesic Flatwoods; Land use (post) Conventional Roofs; Area (pre) 1.00 ac; Area (post) 1.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 98.00; DCIA (post) 100.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.795; Runoff volume (post) 3.578 ac-ft/yr; Nitrogen load (post) 4.632 kg/yr; Phosphorus load (post) 0.529 kg/yr.

The catchment School roof: its Entry tab. With School roof selected, press Add Treatment and choose Rainwater Harvesting. On its Entry tab type the Treatment name Rainwater Harvesting (BMPFast 2 starts it as “Rainwater Harvesting 1”) and enter: Roof type CONCRETE, 0.2% SLOPE; Contributing area 43,560.00 ft²; Area available for irrigation 87,120.00 ft²; Available harvest volume 30,000.00 gal; Harvest rate 1.50 in/week. The results are calculated as you type: Equivalent impervious area 41,517 ft²; Harvest volume over the equivalent impervious area 1.16 in; Nitrogen removal provided 84.62 %; Phosphorus removal provided 84.62 %.

The treatment Rainwater Harvesting: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment Rainwater Harvesting: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used School roof Outlet Rainwater Harvesting A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.078 / 0.795 |
| Runoff, pre / post | 0.351 / 3.578 ac-ft/yr |
| TN load, pre / post | 0.470 / 4.632 kg/yr |
| TP load, pre / post | 0.019 / 0.529 kg/yr |
| Rainwater Harvesting: computed by BMPFast | |
| Hydraulic capture efficiency | 85.00 % |
| Provided TN / TP removal | 84.62 % / 84.62 % |
| TN load in → out | 4.632 → 0.713 kg/yr |
| TP load in → out | 0.529 → 0.081 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 4.632 → 0.713 kg/yr |
| TP load: catchments → outlet | 0.529 → 0.081 kg/yr |
| Provided removal TN / TP | 84.6 % / 84.6 % |
| Required removal TN / TP (Maximum % Removal) | 60.0 % (met) / 90.0 % (not met) |
The BMP report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 0.713 kg/yr | 0.713 kg/yr | same |
| Phosphorus leaving the site | 0.081 kg/yr | 0.081 kg/yr | same |
| Site removal, nitrogen | 84.616 % | 84.616 % | same |
| Site removal, phosphorus | 84.616 % | 84.616 % | same |
| School roof: Rainwater Harvesting removal, nitrogen | 84.616 % | 84.616 % | same |
| School roof: Rainwater Harvesting removal, phosphorus | 84.616 % | 84.616 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.795 × 1.00 ac × 54.0 in / 12 | |
| = 3.578 ac-ft/yr (program 3.578). |
| TN load | = EMC × runoff × 1.233 |
| = 1.050 × 3.578 × 1.233 | |
| = 4.632 kg/yr (program 4.632) |
| TP load | = 0.120 × 3.578 × 1.233 |
| = 0.529 kg/yr (program 0.529). |
1.233 kg is 1 mg/L in 1 ac-ft.
REV coordinates.
| Equivalent impervious area EIA | = 41,517 sf (roof area × the runoff coefficient of a concrete, 0.2% slope roof). |
| Harvest volume over EIA | = 30,000 gal / 7.4805 gal/cf / 41,517 sf × 12 |
| = 1.1592 in (program 1.1592). |
| Use rate over EIA | = 1.50 in/week × 87,120 sf / 7 / 41,517 sf |
| = 0.4497 in/day (program 0.4497). |
Capture. The rate-efficiency-volume (REV) curves for Florida Zone 3 at those coordinates give 85.00 %; water that is used is not discharged, so TN and TP removal equal it (Harvesting and Greenroof Methodology).
Load out.
| TN out | = load in × (1 − removal) |
| = 4.632 × (1 − 84.62 / 100) | |
| = 0.713 kg/yr (program 0.713) |
| TP out | = 0.529 × (1 − 84.62 / 100) |
| = 0.081 kg/yr (program 0.081). |
The standard is not met, and that is expected. “Redevelopment + OFW” requires 60 % TN and 90 % TP of the post-development load (AH Vol I 8.3.5(b)). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 89.8 % and TP 96.5 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 60.0 % and TP 90.0 %. This problem shows what this design removes (84.6 % / 84.6 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).
The program’s Equations page
5Files
- rainwater-school.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- rainwater-school.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Rainwater Harvesting (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Rainwater Harvesting — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.