Detention rain garden with an underdrain

A rain garden with an underdrain and B&G CTS12 media; Net Improvement, Zone 4.

1The problem

A 1-acre townhome site drains to a rain garden with an underdrain (detention): what it filters through B&G CTS12 media is discharged.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 4Zone map (help page 815)
Mean annual rainfall52 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Net ImprovementSite (illustrative)
Catchment 1: Townhomes (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Multi-FamilySite (illustrative)
Area, pre / post1 / 1 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 80Site (illustrative)
DCIA, pre / post0 / 50 %Site (illustrative)
EMC TN, pre / post3.030 / 1.840 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.520 mg/LBMPFast land use table (AH Vol I Table 9.2)
Media mixB&G CTS12 (TN 60 %, TP 90 %)BMPFast media table (help page 817)
Rain Garden Analysis (worksheet)
System TypeDetentionDesign (illustrative)
Sustainable Void Fraction0.3Design (illustrative)
Native Soil Volume2000 cubic feetDesign (illustrative)
Water Storage above Media1000 cubic feetDesign (illustrative)
Credit for Native Soil and Cover Crop0 %Design (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Rain garden: detention with underdrain; Meteorological zone Florida Zone 4; Mean annual rainfall 52.00 in; Type of analysis Net Improvement; Conduct groundwater discharge analysis Yes. (To follow along with the finished project instead, choose File ▸ Open and open rain-garden-detention.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Townhomes and enter: Land use (pre) Agricultural - Pasture; Land use (post) Multi-Family; Area (pre) 1.00 ac; Area (post) 1.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 80.00; DCIA (post) 50.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.476; Runoff volume (post) 2.063 ac-ft/yr; Nitrogen load (post) 4.680 kg/yr; Phosphorus load (post) 1.322 kg/yr.

    The catchment Townhomes: its Entry tab.
    The catchment Townhomes: its Entry tab.
  3. With Townhomes selected, press Add Treatment and choose Rain Garden. On its Entry tab type the Treatment name Rain Garden (BMPFast 2 starts it as “Rain Garden 1”) and enter: System type Detention; Sustainable void fraction 0.30; Native soil volume 2,000 ft³; Water storage above the media 1,000.00 ft³; Media mix B&G CTS12; Is the media design residence time more than 2 hours? Yes; Media nitrogen reduction 60.00 %; Media phosphorus reduction 90.00 %. The results are calculated as you type: Provided retention volume 0.037 ac-ft; Provided media treatment depth 0.44 in; Minimum media area to drain in 48 hours 80 ft²; Nitrogen removal provided 60.00 %; Phosphorus removal provided 90.00 %.

    The treatment Rain Garden: its Entry tab.
    The treatment Rain Garden: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

    The treatment Rain Garden: its Report tab.
    The treatment Rain Garden: its Report tab.
  5. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment used
    TownhomesOutletRain Garden

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  6. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.043 / 0.476
Runoff, pre / post0.185 / 2.063 ac-ft/yr
TN load, pre / post0.693 / 4.680 kg/yr
TP load, pre / post0.136 / 1.322 kg/yr
Rain Garden: computed by BMPFast
Treatment depth0.441 in
Provided TN / TP removal60.00 % / 90.00 %
TN load in → out4.680 → 1.872 kg/yr
TP load in → out1.322 → 0.132 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet4.680 → 1.872 kg/yr
TP load: catchments → outlet1.322 → 0.132 kg/yr
Provided removal TN / TP60.0 % / 90.0 %
Required removal TN / TP (Maximum % Removal)85.2 % (not met) / 89.7 % (met)

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site1.872 kg/yr1.872 kg/yrsame
Phosphorus leaving the site0.132 kg/yr0.132 kg/yrsame
Site removal, nitrogen60.000 %60.000 %same
Site removal, phosphorus90.000 %90.000 %same
Townhomes: Rain Garden removal, nitrogen60.000 %60.000 %same
Townhomes: Rain Garden removal, phosphorus90.000 %90.000 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Storage.

Treatment depth.

Removal. A detention rain garden discharges what it filters, so its removal is the media reduction of B&G CTS12: TN 60 %, TP 90 % (program 60.00 / 90.00).

Load out.

The standard is not met, and that is expected. “Net Improvement” requires only that the post-development load is not above the pre-development load (Equation 9-3) (AH Vol I 8.2.3 and 8.3.4(a)3). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 85.2 % and TP 89.7 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 85.2 % and TP 89.7 %. This problem shows what this design removes (60.0 % / 90.0 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).

The program’s Equations page

Open this report on its own page.

5Files

  • rain-garden-detention.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
  • rain-garden-detention.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
  • Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Rain Garden (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Rain Garden — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.