All programs › BMPFast › BMPFast 2 sample problems
User defined BMP: alum injection
Alum treatment with 50 % TN and 90 % TP removal; Specified Removal 60 / 85 %, Zone 3.
Help: User Defined (help page 809) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
A 20-acre commercial area is treated by alum injection, with 50 % TN and 90 % TP removal (illustrative). The permit asks for 60 % TN and 85 % TP.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 3 | Zone map (help page 815) |
| Mean annual rainfall | 54 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Specified Removal Efficiency | Site (illustrative) |
| Specified removal: TN / TP | 60 % / 85 % | Site (illustrative) |
| Catchment 1: Commercial site (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / High-Intensity Commercial | Site (illustrative) |
| Area, pre / post | 20 / 20 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 80 | Site (illustrative) |
| DCIA, pre / post | 0 / 70 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 2.400 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.345 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| User Defined BMP (worksheet) | ||
| BMP name | Alum Treating | Design (illustrative) |
| Provided nitrogen treatment | 50 % | Design (illustrative) |
| Provided phosphorus treatment | 90 % | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name User defined BMP: alum treatment; Meteorological zone Florida Zone 3; Mean annual rainfall 54.00 in; Type of analysis Specified Removal Efficiency; Nitrogen Removal Performance Specified 60 %; Phosphorus Removal Performance Specified 85 %. (To follow along with the finished project instead, choose File ▸ Open and open
user-defined-alum.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Commercial site and enter: Land use (pre) Undeveloped - Mesic Flatwoods; Land use (post) High-Intensity Commercial; Area (pre) 20.00 ac; Area (post) 20.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 80.00; DCIA (post) 70.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.596; Runoff volume (post) 53.640 ac-ft/yr; Nitrogen load (post) 158.731 kg/yr; Phosphorus load (post) 22.818 kg/yr.

The catchment Commercial site: its Entry tab. With Commercial site selected, press Add Treatment and choose User Defined BMP. On its Entry tab type the Treatment name User Defined BMP (BMPFast 2 starts it as “User Defined BMP 1”) and enter: BMP name Alum Treating; Provided nitrogen treatment 50.0 %; Provided phosphorus treatment 90.0 %; Hydraulic capture 90.0 %. The results are calculated as you type: About the capture Check: this 90.0 % equals the phosphorus removal, so it probably came from an older BMPFast file (v1 showed the P removal as the capture). A user-defined BMP passes all its flow on unless you enter a capture: set it to 0 unless the device really holds water back.; Nitrogen removal provided 50.00 %; Phosphorus removal provided 90.00 %.

The treatment User Defined BMP: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment User Defined BMP: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Commercial site Outlet User Defined BMP A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.078 / 0.596 |
| Runoff, pre / post | 7.020 / 53.640 ac-ft/yr |
| TN load, pre / post | 9.409 / 158.731 kg/yr |
| TP load, pre / post | 0.372 / 22.818 kg/yr |
| User Defined BMP: computed by BMPFast | |
| Hydraulic capture efficiency | 90.00 % |
| Provided TN / TP removal | 50.00 % / 90.00 % |
| TN load in → out | 158.731 → 79.366 kg/yr |
| TP load in → out | 22.818 → 2.282 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 158.731 → 79.366 kg/yr |
| TP load: catchments → outlet | 22.818 → 2.282 kg/yr |
| Provided removal TN / TP | 50.0 % / 90.0 % |
| Required removal TN / TP (Maximum % Removal) | 60.0 % (not met) / 85.0 % (met) |
The BMP report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 79.366 kg/yr | 79.366 kg/yr | same |
| Phosphorus leaving the site | 2.282 kg/yr | 2.282 kg/yr | same |
| Site removal, nitrogen | 50.000 % | 50.000 % | same |
| Site removal, phosphorus | 90.000 % | 90.000 % | same |
| Commercial site: User Defined BMP removal, nitrogen | 50.000 % | 50.000 % | same |
| Commercial site: User Defined BMP removal, phosphorus | 90.000 % | 90.000 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.596 × 20.00 ac × 54.0 in / 12 | |
| = 53.640 ac-ft/yr (program 53.640). |
| TN load | = EMC × runoff × 1.233 |
| = 2.400 × 53.640 × 1.233 | |
| = 158.731 kg/yr (program 158.731) |
| TP load | = 0.345 × 53.640 × 1.233 |
| = 22.818 kg/yr (program 22.818). |
1.233 kg is 1 mg/L in 1 ac-ft.
Removal. A user defined BMP removes the percentages entered: TN 50.0 % and TP 90.0 %. They must be backed by data the permitting agency accepts (help page 809).
Load out.
| TN out | = load in × (1 − removal) |
| = 158.731 × (1 − 50.00 / 100) | |
| = 79.366 kg/yr (program 79.366) |
| TP out | = 22.818 × (1 − 90.00 / 100) |
| = 2.282 kg/yr (program 2.282). |
The standard is not met, and that is expected. “Specified Removal Efficiency” requires the TN and TP percentages entered for the project, for example a TMDL or BMAP criterion (AH Vol I 8.3.4(b), or as the Agency directs). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 94.1 % and TP 98.4 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 60.0 % and TP 85.0 %. This problem shows what this design removes (50.0 % / 90.0 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).
The program’s Equations page
5Files
- user-defined-alum.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- user-defined-alum.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- User Defined BMP (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- User Defined BMP — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.