BMPFast sample project: no treatment upstream of a wet pond.

1The problem

The BMPFast sample project no BMP upstream detention: an untreated catchment drains to a catchment with a wet pond. Print the Summary Report and the Complete Report.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Specified Removal EfficiencyBMPFast sample project
Specified removal: TN / TP75 % / 75 %BMPFast sample project
Catchment 1: downstream (Watershed Characteristics)
Land use, pre / postUser Defined Values / User Defined ValuesBMPFast sample project
Area, pre / post1 / 1 acBMPFast sample project
Non-DCIA curve number, pre / post70 / 70BMPFast sample project
DCIA, pre / post24.33 / 24.33 %BMPFast sample project
EMC TN, pre / post0.811 / 0.811 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.811 / 0.811 mg/LBMPFast land use table (AH Vol I Table 9.2)
BMP used in routingWet Detention: permanent pool 0.1 ac-ft; There is a littoral zone ticked; MAPs credit 0 %BMPFast sample project
Routes tothe OutletBMPFast sample project
Catchment 2: upstream (Watershed Characteristics)
Land use, pre / postUser Defined Values / User Defined ValuesBMPFast sample project
Area, pre / post99 / 99 acBMPFast sample project
Non-DCIA curve number, pre / post70 / 70BMPFast sample project
DCIA, pre / post24.33 / 24.33 %BMPFast sample project
EMC TN, pre / post0.811 / 0.811 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.811 / 0.811 mg/LBMPFast land use table (AH Vol I Table 9.2)
BMP used in routingNo Treatment (no BMP)BMPFast sample project
Routes toCatchment 1BMPFast sample project

Find: what each report shows and where its numbers come from.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name no BMP upstream detention; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis Specified Removal Efficiency; Nitrogen Removal Performance Specified 75 %; Phosphorus Removal Performance Specified 75 %. (To follow along with the finished project instead, choose File ▸ Open and open reports-summary-complete.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name downstream and enter: Land use (pre) User Defined Values; Land use (post) User Defined Values; Area (pre) 1.00 ac; Area (post) 1.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 70.00; DCIA (pre) 24.33 %; DCIA (post) 24.33 %; Nitrogen EMC (pre) 0.811 mg/L; Nitrogen EMC (post) 0.811 mg/L; Phosphorus EMC (pre) 0.811 mg/L; Phosphorus EMC (post) 0.811 mg/L. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.240; Runoff volume (post) 1.000 ac-ft/yr; Nitrogen load (post) 1.000 kg/yr; Phosphorus load (post) 1.000 kg/yr.

    The catchment downstream: its Entry tab.
    The catchment downstream: its Entry tab.
  3. With downstream selected, press Add Treatment and choose Wet Detention. On its Entry tab type the Treatment name Wet Detention (BMPFast 2 starts it as “Wet Detention 1”) and enter: Permanent pool volume 0.100 ac-ft; How the littoral zone counts Littoral zone credit (BMPFast 2); There is a littoral zone Yes; Littoral zone credit 10.0 %. The results are calculated as you type: Average residence time 36.49 days; Permanent pool volume for 31 days residence 0.08 ac-ft; Nitrogen removal provided 49.06 %; Phosphorus removal provided 75.81 %. These are the treatment alone, on its own catchment’s runoff; the routing calculates it again with the water that drains to it from upstream, so the routing’s numbers below differ.

    The treatment Wet Detention: its Entry tab.
    The treatment Wet Detention: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal in this catchment, as a report to print or save.

    The treatment Wet Detention: its Report tab.
    The treatment Wet Detention: its Report tab.
  5. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name upstream and enter: Land use (pre) User Defined Values; Land use (post) User Defined Values; Area (pre) 99.00 ac; Area (post) 99.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 70.00; DCIA (pre) 24.33 %; DCIA (post) 24.33 %; Nitrogen EMC (pre) 0.811 mg/L; Nitrogen EMC (post) 0.811 mg/L; Phosphorus EMC (pre) 0.811 mg/L; Phosphorus EMC (post) 0.811 mg/L. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.240; Runoff volume (post) 99.017 ac-ft/yr; Nitrogen load (post) 99.014 kg/yr; Phosphorus load (post) 99.014 kg/yr.

    The catchment upstream: its Entry tab.
    The catchment upstream: its Entry tab.
  6. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment usedRunoff from upstream catchments
    downstreamOutletWet DetentionTreated with this catchment's own runoff
    upstreamdownstreamNo treatment

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  7. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

ResultValue
Site (all catchments, at the outlet)
TN load: catchments → outlet100.014 → 86.647 kg/yr
TP load: catchments → outlet100.014 → 56.084 kg/yr
Provided removal TN / TP13.4 % / 43.9 %
Required removal TN / TP (Maximum % Removal)75.0 % (not met) / 75.0 % (not met)

The Summary Report

Open this report on its own page.

The Complete Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site86.647 kg/yr96.648 kg/yrdiffers
Phosphorus leaving the site56.084 kg/yr66.086 kg/yrdiffers
Site removal, nitrogen13.365 %3.365 %differs
Site removal, phosphorus43.923 %33.923 %differs
downstream: Wet Detention removal, nitrogen13.365 %3.365 %differs
downstream: Wet Detention removal, phosphorus43.923 %33.923 %differs

BMPFast 2 gives a different number for: Nitrogen leaving the site, Phosphorus leaving the site, Site removal, nitrogen, Site removal, phosphorus, downstream: Wet Detention removal, nitrogen, downstream: Wet Detention removal, phosphorus. See the notes below the table.

When BMPFast 2 opened the v1 file it said:

  • downstream, Wet Detention: BMPFast 2 takes the wet pond equations as a pond without a littoral zone, and adds a littoral zone credit of 10 percentage points (Appendix O's maximum) to this pond's removal, so it is higher than v1 shows; lower Littoral zone credit if your permit reviewer allows less. To calculate as v1, choose "Reduce without a littoral zone (v1)" in How the littoral zone counts (Design values) on the treatment's Entry tab.

4Check

The reports agree. Both reports come from the same calculation: the outlet loads of the Summary Report are the last node of the Complete Report’s routing table, TN 86.647 and TP 56.084 kg/yr. The catchment loads add up to the total load (100.014 kg/yr TN) (help page 813).

5Files

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.