All programs › BMPFast › Sample problems
Reports: Summary and Complete
BMPFast sample project: no treatment upstream of a wet pond.
Help: Reports (help page 813) · Download the .bmpt · Link to Solution in BMPFast Version 2
1The problem
The BMPFast sample project no BMP upstream detention: an untreated catchment drains to a catchment with a wet pond. Print the Summary Report and the Complete Report.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 2 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Specified Removal Efficiency | BMPFast sample project |
| Specified removal: TN / TP | 75 % / 75 % | BMPFast sample project |
| Catchment 1: downstream (Watershed Characteristics) | ||
| Land use, pre / post | User Defined Values / User Defined Values | BMPFast sample project |
| Area, pre / post | 1 / 1 ac | BMPFast sample project |
| Non-DCIA curve number, pre / post | 70 / 70 | BMPFast sample project |
| DCIA, pre / post | 24.33 / 24.33 % | BMPFast sample project |
| EMC TN, pre / post | 0.811 / 0.811 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.811 / 0.811 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| BMP used in routing | Wet Detention: permanent pool 0.1 ac-ft; Check if there is a littoral zone ticked; MAPs credit 0 % | BMPFast sample project |
| Routes to | the Outlet | BMPFast sample project |
| Catchment 2: upstream (Watershed Characteristics) | ||
| Land use, pre / post | User Defined Values / User Defined Values | BMPFast sample project |
| Area, pre / post | 99 / 99 ac | BMPFast sample project |
| Non-DCIA curve number, pre / post | 70 / 70 | BMPFast sample project |
| DCIA, pre / post | 24.33 / 24.33 % | BMPFast sample project |
| EMC TN, pre / post | 0.811 / 0.811 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.811 / 0.811 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| BMP used in routing | No Treatment (no BMP) | BMPFast sample project |
| Routes to | Catchment 1 | BMPFast sample project |
Find: what each report shows and where its numbers come from.
2Steps in BMPFast
Press Open Project and open
reports-summary-complete.bmpt(the file under Files; it is the BMPFast sample project No BMP Upstream then detention.bmpt). General Site Information (the main window; its title bar reads General Site Information and your license key) shows Florida Zone 2, 50.0 in of rainfall and the performance standard Specified Removal Efficiency.
General Site Information (the main window). Press 1. Enter Catchment and click Catchment 1 in the menu bar at the top of the Watershed Characteristics Worksheet. It holds: name downstream; land uses User Defined Values (pre) and User Defined Values (post); areas 1 and 1 ac; non-DCIA CN 70 and 70; DCIA 24.33 and 24.33 %. Press Back.
On the Watershed Characteristics Worksheet click Catchment 2 in the menu bar: name upstream; land uses User Defined Values (pre) and User Defined Values (post); areas 99 and 99 ac; non-DCIA CN 70 and 70; DCIA 24.33 and 24.33 %.
Press 2. Enter Treatment, click Catchment 1 in the menu bar to make it current, and press Wet Detention to see its BMP: permanent pool 0.1 ac-ft; Check if there is a littoral zone ticked; MAPs credit 0 %. Press Calculate, then Back.
On the main window press 3. Configure Catchments. in the row of Catchment 1 press Edit (the Routing Catchment From: 1 window opens). In Select BMP to use in routing choose Wet Detention; in Select Catchment to Route to choose the Outlet. Press Back.
Back on Select Catchment Configuration, in the row of Catchment 2 press Edit (the Routing Catchment From: 2 window opens). In Select BMP to use in routing choose No Treatment; in Select Catchment to Route to choose Catchment 1. Press Back (Back again closes Select Catchment Configuration).
Press 4. Summary Report: the catchments, the runoff, the removal against the standard and the loads.

The Summary Report (4. Summary Report) in the Report Viewer. Press 5. Complete Report: the routing table node by node, then every catchment and its BMP. Press Save Project to keep your copy; compare it with the .bmpt under Files.

The Complete Report (5. Complete Report).
3Results
| Result | Value |
|---|---|
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 100.014 → 96.648 kg/yr |
| TP load: catchments → outlet | 100.014 → 66.086 kg/yr |
| Provided removal TN / TP | 3.4 % / 33.9 % |
| Required removal TN / TP (Maximum % Removal) | 75.0 % (not met) / 75.0 % (not met) |
The Summary Report
Open this report on its own page.
The Complete Report
4Check
The reports agree. Both reports come from the same calculation: the outlet loads of the Summary Report are the last node of the Complete Report’s routing table, TN 96.648 and TP 66.086 kg/yr. The catchment loads add up to the total load (100.014 kg/yr TN) (help page 813).
5Files
- reports-summary-complete.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
- Summary Report (as BMPFast shows it)
- Complete Report (as BMPFast shows it)
6Help and methodology
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.