Reports: Summary and Complete
BMPFast sample project: no treatment upstream of a wet pond.
Help: Reports (help page 813) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
The BMPFast sample project no BMP upstream detention: an untreated catchment drains to a catchment with a wet pond. Print the Summary Report and the Complete Report.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 2 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Specified Removal Efficiency | BMPFast sample project |
| Specified removal: TN / TP | 75 % / 75 % | BMPFast sample project |
| Catchment 1: downstream (Watershed Characteristics) | ||
| Land use, pre / post | User Defined Values / User Defined Values | BMPFast sample project |
| Area, pre / post | 1 / 1 ac | BMPFast sample project |
| Non-DCIA curve number, pre / post | 70 / 70 | BMPFast sample project |
| DCIA, pre / post | 24.33 / 24.33 % | BMPFast sample project |
| EMC TN, pre / post | 0.811 / 0.811 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.811 / 0.811 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| BMP used in routing | Wet Detention: permanent pool 0.1 ac-ft; There is a littoral zone ticked; MAPs credit 0 % | BMPFast sample project |
| Routes to | the Outlet | BMPFast sample project |
| Catchment 2: upstream (Watershed Characteristics) | ||
| Land use, pre / post | User Defined Values / User Defined Values | BMPFast sample project |
| Area, pre / post | 99 / 99 ac | BMPFast sample project |
| Non-DCIA curve number, pre / post | 70 / 70 | BMPFast sample project |
| DCIA, pre / post | 24.33 / 24.33 % | BMPFast sample project |
| EMC TN, pre / post | 0.811 / 0.811 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.811 / 0.811 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| BMP used in routing | No Treatment (no BMP) | BMPFast sample project |
| Routes to | Catchment 1 | BMPFast sample project |
Find: what each report shows and where its numbers come from.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name no BMP upstream detention; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis Specified Removal Efficiency; Nitrogen Removal Performance Specified 75 %; Phosphorus Removal Performance Specified 75 %. (To follow along with the finished project instead, choose File ▸ Open and open
reports-summary-complete.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name downstream and enter: Land use (pre) User Defined Values; Land use (post) User Defined Values; Area (pre) 1.00 ac; Area (post) 1.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 70.00; DCIA (pre) 24.33 %; DCIA (post) 24.33 %; Nitrogen EMC (pre) 0.811 mg/L; Nitrogen EMC (post) 0.811 mg/L; Phosphorus EMC (pre) 0.811 mg/L; Phosphorus EMC (post) 0.811 mg/L. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.240; Runoff volume (post) 1.000 ac-ft/yr; Nitrogen load (post) 1.000 kg/yr; Phosphorus load (post) 1.000 kg/yr.

The catchment downstream: its Entry tab. With downstream selected, press Add Treatment and choose Wet Detention. On its Entry tab type the Treatment name Wet Detention (BMPFast 2 starts it as “Wet Detention 1”) and enter: Permanent pool volume 0.100 ac-ft; How the littoral zone counts Littoral zone credit (BMPFast 2); There is a littoral zone Yes; Littoral zone credit 10.0 %. The results are calculated as you type: Average residence time 36.49 days; Permanent pool volume for 31 days residence 0.08 ac-ft; Nitrogen removal provided 49.06 %; Phosphorus removal provided 75.81 %. These are the treatment alone, on its own catchment’s runoff; the routing calculates it again with the water that drains to it from upstream, so the routing’s numbers below differ.

The treatment Wet Detention: its Entry tab. Open the treatment’s Report tab: its inputs and removal in this catchment, as a report to print or save.

The treatment Wet Detention: its Report tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name upstream and enter: Land use (pre) User Defined Values; Land use (post) User Defined Values; Area (pre) 99.00 ac; Area (post) 99.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 70.00; DCIA (pre) 24.33 %; DCIA (post) 24.33 %; Nitrogen EMC (pre) 0.811 mg/L; Nitrogen EMC (post) 0.811 mg/L; Phosphorus EMC (pre) 0.811 mg/L; Phosphorus EMC (post) 0.811 mg/L. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.240; Runoff volume (post) 99.017 ac-ft/yr; Nitrogen load (post) 99.014 kg/yr; Phosphorus load (post) 99.014 kg/yr.

The catchment upstream: its Entry tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Runoff from upstream catchments downstream Outlet Wet Detention Treated with this catchment's own runoff upstream downstream No treatment A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 100.014 → 86.647 kg/yr |
| TP load: catchments → outlet | 100.014 → 56.084 kg/yr |
| Provided removal TN / TP | 13.4 % / 43.9 % |
| Required removal TN / TP (Maximum % Removal) | 75.0 % (not met) / 75.0 % (not met) |
The Summary Report
Open this report on its own page.
The Complete Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 86.647 kg/yr | 96.648 kg/yr | differs |
| Phosphorus leaving the site | 56.084 kg/yr | 66.086 kg/yr | differs |
| Site removal, nitrogen | 13.365 % | 3.365 % | differs |
| Site removal, phosphorus | 43.923 % | 33.923 % | differs |
| downstream: Wet Detention removal, nitrogen | 13.365 % | 3.365 % | differs |
| downstream: Wet Detention removal, phosphorus | 43.923 % | 33.923 % | differs |
BMPFast 2 gives a different number for: Nitrogen leaving the site, Phosphorus leaving the site, Site removal, nitrogen, Site removal, phosphorus, downstream: Wet Detention removal, nitrogen, downstream: Wet Detention removal, phosphorus. See the notes below the table.
When BMPFast 2 opened the v1 file it said:
- downstream, Wet Detention: BMPFast 2 takes the wet pond equations as a pond without a littoral zone, and adds a littoral zone credit of 10 percentage points (Appendix O's maximum) to this pond's removal, so it is higher than v1 shows; lower Littoral zone credit if your permit reviewer allows less. To calculate as v1, choose "Reduce without a littoral zone (v1)" in How the littoral zone counts (Design values) on the treatment's Entry tab.
4Check
The reports agree. Both reports come from the same calculation: the outlet loads of the Summary Report are the last node of the Complete Report’s routing table, TN 86.647 and TP 56.084 kg/yr. The catchment loads add up to the total load (100.014 kg/yr TN) (help page 813).
5Files
- reports-summary-complete.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- reports-summary-complete.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Complete Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Wet Detention (downstream) (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Wet Detention — calculations (downstream) (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.