All programs › BMPFast › BMPFast 2 sample problems
Surface discharge filter with B&G CTS12
A 0.5-inch treatment depth through B&G CTS12 media; BMP Analysis, Zone 2.
Help: Surface Discharge Filter (help page 346) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
A 5-acre subdivision is treated by a surface discharge filter: 0.5 in of runoff over the catchment passes through B&G CTS12 media and is discharged.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 2 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | BMP Analysis | Site (illustrative) |
| Catchment 1: Subdivision (Watershed Characteristics) | ||
| Land use, pre / post | Agricultural - Pasture / Single-Family | Site (illustrative) |
| Area, pre / post | 5 / 5 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 61 / 75 | Site (illustrative) |
| DCIA, pre / post | 0 / 25 % | Site (illustrative) |
| EMC TN, pre / post | 3.030 / 1.770 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.593 / 0.327 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Media mix | B&G CTS12 (TN 60 %, TP 90 %) | BMPFast media table (help page 817) |
| Filtration System (worksheet) | ||
| Treatment Depth | 0.5 in | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Surface discharge filter: B_G CTS12; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis BMP Analysis; Conduct groundwater discharge analysis Yes. (To follow along with the finished project instead, choose File ▸ Open and open
filter-cts12.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Subdivision and enter: Land use (pre) Agricultural - Pasture; Land use (post) Single-Family; Area (pre) 5.00 ac; Area (post) 5.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 75.00; DCIA (post) 25.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.262; Runoff volume (post) 5.458 ac-ft/yr; Nitrogen load (post) 11.912 kg/yr; Phosphorus load (post) 2.201 kg/yr.

The catchment Subdivision: its Entry tab. With Subdivision selected, press Add Treatment and choose Surface Discharge Filter. On its Entry tab type the Treatment name Surface Discharge Filter (BMPFast 2 starts it as “Surface Discharge Filter 1”) and enter: Treatment depth 0.50 in; Media mix B&G CTS12; Is the media design residence time more than 2 hours? Yes; Media nitrogen reduction 60.00 %; Media phosphorus reduction 90.00 %. The results are calculated as you type: Hydraulic capture 71.50 %; Nitrogen removal provided 42.90 %; Phosphorus removal provided 64.35 %.

The treatment Surface Discharge Filter: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment Surface Discharge Filter: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Subdivision Outlet Surface Discharge Filter A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.032 / 0.262 |
| Runoff, pre / post | 0.675 / 5.458 ac-ft/yr |
| TN load, pre / post | 2.522 / 11.912 kg/yr |
| TP load, pre / post | 0.494 / 2.201 kg/yr |
| Filtration: computed by BMPFast | |
| Treatment depth | 0.500 in |
| Hydraulic capture efficiency | 71.50 % |
| Provided TN / TP removal | 42.90 % / 64.35 % |
| TN load in → out | 11.912 → 6.802 kg/yr |
| TP load in → out | 2.201 → 0.785 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 11.912 → 6.802 kg/yr |
| TP load: catchments → outlet | 2.201 → 0.785 kg/yr |
| Provided removal TN / TP | 42.9 % / 64.3 % |
The BMP report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 6.802 kg/yr | 6.802 kg/yr | same |
| Phosphorus leaving the site | 0.785 kg/yr | 0.785 kg/yr | same |
| Site removal, nitrogen | 42.900 % | 42.900 % | same |
| Site removal, phosphorus | 64.350 % | 64.350 % | same |
| Subdivision: Filtration removal, nitrogen | 42.900 % | 42.900 % | same |
| Subdivision: Filtration removal, phosphorus | 64.350 % | 64.350 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.262 × 5.00 ac × 50.0 in / 12 | |
| = 5.458 ac-ft/yr (program 5.458). |
| TN load | = EMC × runoff × 1.233 |
| = 1.770 × 5.458 × 1.233 | |
| = 11.912 kg/yr (program 11.912) |
| TP load | = 0.327 × 5.458 × 1.233 |
| = 2.201 kg/yr (program 2.201). |
1.233 kg is 1 mg/L in 1 ac-ft.
Capture. The retention efficiency tables for Florida Zone 2 at a treatment depth of 0.500 in, non-DCIA CN 75.00 and DCIA 25.0 % give a hydraulic capture of 71.50 % (AH Vol I Appendix O; read the same tables with Calculators ▸ Retention Efficiency Tables, help page 4325).
Removal.
The water captured passes through the media and leaves as surface discharge, so removal = capture × media reduction:
| TN | = 71.50 × 60 / 100 |
| = 42.90 % (program 42.90) |
| TP | = 71.50 × 90 / 100 |
| = 64.35 % (program 64.35). |
The media reductions are those of B&G CTS12 (Media and Filtration Methodology).
Load out.
| TN out | = load in × (1 − removal) |
| = 11.912 × (1 − 42.90 / 100) | |
| = 6.802 kg/yr (program 6.802) |
| TP out | = 2.201 × (1 − 64.35 / 100) |
| = 0.785 kg/yr (program 0.785). |
The program’s Equations page
5Files
- filter-cts12.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- filter-cts12.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Surface Discharge Filter (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Surface Discharge Filter — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.