All programs › BMPFast › BMPFast 2 sample problems
Discovery plot: outlet phosphorus against DCIA
Example Problem 5: TP at the outlet as the directly connected impervious area grows.
Help: Discovery Plots (help page 4477) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
The BMPFast sample project Example Problem 5 (retention → wet pond). How does the outlet phosphorus load change as the post-development DCIA goes from 20 % to 80 %?
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 5 | Zone map (help page 815) |
| Mean annual rainfall | 61 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Specified Removal Efficiency | BMPFast sample project |
| Specified removal: TN / TP | 70 % / 80 % | BMPFast sample project |
| Catchment 1: Highway Section 206 (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Wet Flatwoods / Highway | BMPFast sample project |
| Area, pre / post | 6 / 6 ac | BMPFast sample project |
| Non-DCIA curve number, pre / post | 80 / 80 | BMPFast sample project |
| DCIA, pre / post | 0 / 60 % | BMPFast sample project |
| EMC TN, pre / post | 1.213 / 1.250 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.021 / 0.173 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Wet pond area (no loading) | 1.00 ac | BMPFast sample project |
Find: how Total Outlet Phosphorus Loading changes as Post DCIA Percent varies.
2Steps in BMPFast 2
Start BMPFast 2, choose File ▸ Open and open
discovery-dcia.bmpf(under Files below). The tree on the left opens on the project, General Site Information: Florida Zone 5, 61.0 in of rainfall, type of analysis Specified Removal Efficiency.
General Site Information: the project’s Entry tab. Under Catchment Routings select Routing 1 and open its Plots tab: the Discovery Plot. It opens on Provided Nitrogen Treatment Efficiency (%) in What to plot (Y) and Treatment Depth (in) — Multiple BMP: BMP 1 (Retention) — Catchment 1 (Highway Section 206) in Vary (X). The lists hold the routing’s results and the design values of its catchments and of the treatments it uses.

The routing’s Plots tab as it opens: the Discovery Plot. In What to plot (Y) choose Total Outlet Phosphorus Loading (kg/yr). In Vary (X) choose Post DCIA Percent (0-100) — Catchment 1 (Highway Section 206): Its value now shows 60.00 %, and From and To are filled with a range around it (0.00 to 100.00). Type 20 in From, 80 in To and 7 in Steps (pressing Enter after each), then press Draw the plot. Each of the 7 steps (so 8 points, From and To included) is a full calculation of the routing with only that value changed; the routing itself is not changed.

The Discovery Plot set up: what to plot, what to vary, the range and the steps. Scroll down: the plot is under the form. This design: 60.00 % gives 0.23 kg/yr; at From 20.00 gives 0.08, at To 80.00 gives 0.34. The diamond is the design as it stands.

The plot, under the form.
3Results
Total Outlet Phosphorus Loading against Post DCIA Percent, 7 steps from 20 to 80:
| Post DCIA Percent (0-100) | Total Outlet Phosphorus Loading (kg/yr), BMPFast 2 | BMPFast (v1) |
|---|---|---|
| 20.000 | 0.078 | 0.133 |
| 28.571 | 0.100 | 0.164 |
| 37.143 | 0.128 | 0.202 |
| 45.714 | 0.160 | 0.247 |
| 54.286 | 0.198 | 0.300 |
| 62.857 | 0.241 | 0.359 |
| 71.429 | 0.290 | 0.425 |
| 80.000 | 0.343 | 0.498 |
Some points differ from v1’s: see the table. Routing 1: each point is the whole routing calculated with Post DCIA Percent at that value; everything else as entered. The diamond is the design as it stands.
The routing’s Results report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 4.314 kg/yr | 5.125 kg/yr | differs |
| Phosphorus leaving the site | 0.226 kg/yr | 0.338 kg/yr | differs |
| Site removal, nitrogen | 79.867 % | 76.081 % | differs |
| Site removal, phosphorus | 92.374 % | 88.588 % | differs |
| Highway Section 206: Multiple BMP removal, nitrogen | 79.867 % | 76.081 % | differs |
| Highway Section 206: Multiple BMP removal, phosphorus | 92.374 % | 88.588 % | differs |
BMPFast 2 gives a different number for: Nitrogen leaving the site, Phosphorus leaving the site, Site removal, nitrogen, Site removal, phosphorus, Highway Section 206: Multiple BMP removal, nitrogen, Highway Section 206: Multiple BMP removal, phosphorus. See the notes below the table.
When BMPFast 2 opened the v1 file it said:
- Highway Section 206, Wet Detention: BMPFast 2 takes the wet pond equations as a pond without a littoral zone, and adds a littoral zone credit of 10 percentage points (Appendix O's maximum) to this pond's removal, so it is higher than v1 shows; lower Littoral zone credit if your permit reviewer allows less. To calculate as v1, choose "Reduce without a littoral zone (v1)" in How the littoral zone counts (Design values) on the treatment's Entry tab.
4Check
The current design is on the curve. The project’s own value, Post DCIA Percent (0-100) = 60.000, gives Total Outlet Phosphorus Loading (kg/yr) = 0.226: the diamond on the plot, and the same as the routing’s Results report. Every other point is the whole routing calculated with only that value changed, so any point can be checked by typing that value on the treatment’s or catchment’s Entry tab and reading the routing’s Results (then Edit ▸ Undo). The curve runs from 0.078 to 0.343 over the range (Discovery Plots Methodology).
5Files
- discovery-dcia.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- discovery-dcia.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- BMPs in Series (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- BMPs in Series — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.