All programs › BMPFast › BMPFast 2 sample problems
BMPs in series: permeable pavement then wet pond
BMPFast sample project Example Problem 5: permeable pavement → wet detention.
Help: BMPs in Series (help page 504) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
A 6-acre catchment in Zone 5 with permeable pavement draining to a wet detention pond (BMPFast sample project).
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 5 | Zone map (help page 815) |
| Mean annual rainfall | 61 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Specified Removal Efficiency | BMPFast sample project |
| Specified removal: TN / TP | 55 % / 75 % | BMPFast sample project |
| Catchment 1: Highway Section 206 (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Wet Flatwoods / Highway | BMPFast sample project |
| Area, pre / post | 6 / 6 ac | BMPFast sample project |
| Non-DCIA curve number, pre / post | 80 / 80 | BMPFast sample project |
| DCIA, pre / post | 0 / 60 % | BMPFast sample project |
| EMC TN, pre / post | 1.213 / 1.250 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.021 / 0.173 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Wet pond area (no loading) | 1.00 ac | BMPFast sample project |
| BMPs in Series | ||
| BMP 1: Permeable Pavement | 2.04 ac, storage 0.592 ac-ft | BMPFast sample project |
| BMP 2: Wet Detention | permanent pool 3.809 ac-ft, littoral zone yes | BMPFast sample project |
Find: the removal of the series as one system, and the loads leaving the site.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Ex # 5 perm pave to det one catch; Meteorological zone Florida Zone 5; Mean annual rainfall 61.00 in; Type of analysis Specified Removal Efficiency; Nitrogen Removal Performance Specified 55 %; Phosphorus Removal Performance Specified 75 %. (To follow along with the finished project instead, choose File ▸ Open and open
series-pavement-wet-detention.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Highway Section 206 and enter: Land use (pre) Undeveloped - Wet Flatwoods; Land use (post) Highway; Area (pre) 6.00 ac; Area (post) 6.00 ac; Non-DCIA curve number (pre) 80.00; Non-DCIA curve number (post) 80.00; DCIA (post) 60.00 %; Wet pond area (no loading from this area) 1.00 ac. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.547; Runoff volume (post) 13.903 ac-ft/yr; Nitrogen load (post) 21.428 kg/yr; Phosphorus load (post) 2.966 kg/yr.

The catchment Highway Section 206: its Entry tab. With Highway Section 206 selected, press Add Treatment and choose Wet Detention. On its Entry tab type the Treatment name Wet Detention (BMPFast 2 starts it as “Wet Detention 1”) and enter: Permanent pool volume 3.809 ac-ft; How the littoral zone counts Littoral zone credit (BMPFast 2); There is a littoral zone Yes; Littoral zone credit 10.0 %. The results are calculated as you type: Average residence time 100.00 days; Permanent pool volume for 31 days residence 1.18 ac-ft; Nitrogen removal provided 51.91 %; Phosphorus removal provided 83.99 %.

The treatment Wet Detention: its Entry tab. With Highway Section 206 selected, press Add Treatment and choose Permeable Pavement. On its Entry tab type the Treatment name Permeable Pavement (BMPFast 2 starts it as “Permeable Pavement 1”) and enter: Permeable pavement area 2.04 ac; Time to recover the design volume 72.00 hr; FilterPaveTM thickness 4.00 in; #57 rock(non-calcareous) thickness 8.00 in; #89 pea rock thickness 4.00 in; Media mix None. The results are calculated as you type: Total storage of the pavement 0.592 ac-ft; Treatment depth 1.420 in; Nitrogen removal provided 79.05 %; Phosphorus removal provided 79.05 %.

The treatment Permeable Pavement: its Entry tab. With Highway Section 206 selected, press Add Treatment and choose BMPs in Series. On its Entry tab type the Treatment name BMPs in Series and choose, upstream first: BMP 1 (upstream) Permeable Pavement; BMP 2 Wet Detention; BMP 3 (none); A series that starts with retention is calculated as One retention system (v1's method). Each member is a treatment of this catchment (the steps above). The results are at the bottom of the tab: Equivalent treatment depth 1.42 in; Equivalent treatment efficiency 79.05 %; Nitrogen removal provided 88.57 %; Phosphorus removal provided 96.17 %.

The treatment BMPs in Series: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment BMPs in Series: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Highway Section 206 Outlet BMPs in Series A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.157 / 0.547 |
| Runoff, pre / post | 4.788 / 13.903 ac-ft/yr |
| TN load, pre / post | 7.162 / 21.428 kg/yr |
| TP load, pre / post | 0.124 / 2.966 kg/yr |
| BMPs in Series: computed by BMPFast | |
| Equivalent Treatment Depth / Efficiency | 1.420 in / 79.05 % |
| Treatment depth | 1.420 in |
| Hydraulic capture efficiency | 79.05 % |
| Provided TN / TP removal | 88.57 % / 96.17 % |
| TN load in → out | 21.428 → 2.449 kg/yr |
| TP load in → out | 2.966 → 0.114 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 21.428 → 2.449 kg/yr |
| TP load: catchments → outlet | 2.966 → 0.114 kg/yr |
| Provided removal TN / TP | 88.6 % / 96.2 % |
| Required removal TN / TP (Maximum % Removal) | 55.0 % (met) / 75.0 % (met) |
The BMPs in Series Equations report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 2.449 kg/yr | 2.897 kg/yr | differs |
| Phosphorus leaving the site | 0.114 kg/yr | 0.176 kg/yr | differs |
| Site removal, nitrogen | 88.573 % | 86.478 % | differs |
| Site removal, phosphorus | 96.173 % | 94.078 % | differs |
| Highway Section 206: Multiple BMP removal, nitrogen | 88.573 % | 86.478 % | differs |
| Highway Section 206: Multiple BMP removal, phosphorus | 96.173 % | 94.078 % | differs |
BMPFast 2 gives a different number for: Nitrogen leaving the site, Phosphorus leaving the site, Site removal, nitrogen, Site removal, phosphorus, Highway Section 206: Multiple BMP removal, nitrogen, Highway Section 206: Multiple BMP removal, phosphorus. See the notes below the table.
When BMPFast 2 opened the v1 file it said:
- Highway Section 206, Wet Detention: BMPFast 2 takes the wet pond equations as a pond without a littoral zone, and adds a littoral zone credit of 10 percentage points (Appendix O's maximum) to this pond's removal, so it is higher than v1 shows; lower Littoral zone credit if your permit reviewer allows less. To calculate as v1, choose "Reduce without a littoral zone (v1)" in How the littoral zone counts (Design values) on the treatment's Entry tab.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.547 × 5.00 ac × 61.0 in / 12 | |
| = 13.903 ac-ft/yr (program 13.903). |
| TN load | = EMC × runoff × 1.233 |
| = 1.250 × 13.903 × 1.233 | |
| = 21.428 kg/yr (program 21.428) |
| TP load | = 0.173 × 13.903 × 1.233 |
| = 2.966 kg/yr (program 2.966). |
1.233 kg is 1 mg/L in 1 ac-ft.
Permeable Pavement → Wet Detention. The permeable pavement (a retention BMP) captures 79.05 % of the runoff (treatment depth 1.420 in). Only the rest, 20.95 %, reaches the pond, so the pond’s residence time is worked out on that volume and its removal applies to what reaches it. The system removes TN 88.57 % and TP 96.17 %; the Equations report below lists every step with its numbers (help page 504).
Load out.
| TN out | = load in × (1 − removal) |
| = 21.428 × (1 − 88.57 / 100) | |
| = 2.449 kg/yr (program 2.449) |
| TP out | = 2.966 × (1 − 96.17 / 100) |
| = 0.114 kg/yr (program 0.114). |
5Files
- series-pavement-wet-detention.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- series-pavement-wet-detention.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- BMPs in Series (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- BMPs in Series — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
- BMPs in Series (help page 504)
- Strand Based Routing for Retention in Series (help page 4824)
- Comparison of Methods for Wet Detention Ponds in Series (help page 4869)
- Comparison of Methods for Filters in Series (help page 4825)
- Retention Methodology (help page 4537)
- Wet Detention Methodology (help page 4590)
- Link to Solution in BMPFast Version 1
- All BMPFast 2 sample problems
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.