SoftwarePlus.ai

All programs › BMPFast › BMPFast 2 sample problems

Stormwater harvesting for common-area irrigation

6 ac-ft harvested at 1.0 in/week over 12 ac; Net Improvement, Zone 2.

1The problem

A 40-acre subdivision harvests up to 6 ac-ft from its pond to irrigate 12 ac of common area at 1.0 in/week.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Net ImprovementSite (illustrative)
Catchment 1: Subdivision (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilySite (illustrative)
Area, pre / post40 / 40 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 75Site (illustrative)
DCIA, pre / post0 / 25 %Site (illustrative)
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
Stormwater Harvesting (worksheet)
Max available harvest volume6.0 ac-ftDesign (illustrative)
Harvest rate1.0 in/weekDesign (illustrative)
Area available for irrigation12 acDesign (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Stormwater harvesting: subdivision irrigating common areas; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis Net Improvement. (To follow along with the finished project instead, choose File ▸ Open and open stormwater-harvesting-irrigation.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Subdivision and enter: Land use (pre) Agricultural - Pasture; Land use (post) Single-Family; Area (pre) 40.00 ac; Area (post) 40.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 75.00; DCIA (post) 25.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.262; Runoff volume (post) 43.667 ac-ft/yr; Nitrogen load (post) 95.299 kg/yr; Phosphorus load (post) 17.606 kg/yr.

    The catchment Subdivision: its Entry tab.
    The catchment Subdivision: its Entry tab.
  3. With Subdivision selected, press Add Treatment and choose Stormwater Harvesting. On its Entry tab type the Treatment name Stormwater Harvesting (BMPFast 2 starts it as “Stormwater Harvesting 1”) and enter: Total contributing area 40.00 ac; Area available for irrigation 12.00 ac; Maximum available harvest volume 6.00 ac-ft; Harvest rate 1.00 in/week. The results are calculated as you type: Effective impervious area 10.48 ac; Harvest volume over the effective impervious area 1.35 in; Nitrogen removal provided 90.00 %; Phosphorus removal provided 90.00 %.

    The treatment Stormwater Harvesting: its Entry tab.
    The treatment Stormwater Harvesting: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

    The treatment Stormwater Harvesting: its Report tab.
    The treatment Stormwater Harvesting: its Report tab.
  5. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment used
    SubdivisionOutletStormwater Harvesting

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  6. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.032 / 0.262
Runoff, pre / post5.400 / 43.667 ac-ft/yr
TN load, pre / post20.174 / 95.299 kg/yr
TP load, pre / post3.948 / 17.606 kg/yr
Stormwater Harvesting: computed by BMPFast
Treatment depth1.350 in
Hydraulic capture efficiency90.00 %
Provided TN / TP removal90.00 % / 90.00 %
TN load in → out95.299 → 9.530 kg/yr
TP load in → out17.606 → 1.761 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet95.299 → 9.530 kg/yr
TP load: catchments → outlet17.606 → 1.761 kg/yr
Provided removal TN / TP90.0 % / 90.0 %
Required removal TN / TP (Maximum % Removal)78.8 % (met) / 77.6 % (met)

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site9.530 kg/yr9.530 kg/yrsame
Phosphorus leaving the site1.761 kg/yr1.761 kg/yrsame
Site removal, nitrogen90.000 %90.000 %same
Site removal, phosphorus90.000 %90.000 %same
Subdivision: Stormwater Harvesting removal, nitrogen90.000 %90.000 %same
Subdivision: Stormwater Harvesting removal, phosphorus90.000 %90.000 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

REV coordinates.

Capture. The REV curves of Florida Zone 2 at (x, y) give 90.00 %, the TN and TP removal. Demand 16.944 MG/yr, supply 12.806 MG/yr, supplemental water 4.138 MG/yr (Harvesting and Greenroof Methodology).

Load out.

The program’s Equations page

Open this report on its own page.

5Files

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.