Stormwater harvesting for common-area irrigation

6 ac-ft harvested at 1.0 in/week over 12 ac; Net Improvement, Zone 2.

1The problem

A 40-acre subdivision harvests up to 6 ac-ft from its pond to irrigate 12 ac of common area at 1.0 in/week.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Net ImprovementSite (illustrative)
Catchment 1: Subdivision (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilySite (illustrative)
Area, pre / post40 / 40 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 75Site (illustrative)
DCIA, pre / post0 / 25 %Site (illustrative)
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
Stormwater Harvesting (worksheet)
Max available harvest volume6.0 ac-ftDesign (illustrative)
Harvest rate1.0 in/weekDesign (illustrative)
Area available for irrigation12 acDesign (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast

  1. Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Stormwater harvesting: subdivision irrigating common areas, choose Florida Zone 2, enter 50 in of mean annual rainfall and choose the performance standard Net Improvement.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment. For Catchment 1 type the name Subdivision, choose the land uses Agricultural - Pasture (pre) and Single-Family (post), enter the areas 40 and 40 ac, the non-DCIA curve numbers 61 and 75 and the DCIA 0 and 25 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

    Watershed Characteristics Worksheet (1. Enter Catchment).
    Watershed Characteristics Worksheet (1. Enter Catchment).
  3. Press 2. Enter Treatment and then Stormwater Harvesting. On the Stormwater Harvesting worksheet: Max available harvest volume 6.0 ac-ft; Harvest rate 1.0 in/week; Area available for irrigation 12 ac. Press Calculate. The report on the worksheet shows the inputs and the results.

    The BMP worksheet after Calculate: the report on the left.
    The BMP worksheet after Calculate: the report on the left.
  4. Press the same button again, now labelled Equations: the worksheet shows each equation with this problem’s values. Press Back to return to the treatment options.

    The same worksheet showing Equations: each equation with this problem’s values.
    The same worksheet showing Equations: each equation with this problem’s values.
  5. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Stormwater Harvesting as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
  6. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Summary Report (4. Summary Report) in the Report Viewer.
    The Summary Report (4. Summary Report) in the Report Viewer.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.032 / 0.262
Runoff, pre / post5.400 / 43.667 ac-ft/yr
TN load, pre / post20.174 / 95.299 kg/yr
TP load, pre / post3.948 / 17.606 kg/yr
Stormwater Harvesting: computed by BMPFast
Treatment depth1.350 in
Hydraulic capture efficiency90.00 %
Provided TN / TP removal90.00 % / 90.00 %
TN load in → out95.299 → 9.530 kg/yr
TP load in → out17.606 → 1.761 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet95.299 → 9.530 kg/yr
TP load: catchments → outlet17.606 → 1.761 kg/yr
Provided removal TN / TP90.0 % / 90.0 %
Required removal TN / TP (Maximum % Removal)78.8 % (met) / 77.6 % (met)

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

REV coordinates.

Capture. The REV curves of Florida Zone 2 at (x, y) give 90.00 %, the TN and TP removal. Demand 16.944 MG/yr, supply 12.806 MG/yr, supplemental water 4.138 MG/yr (Harvesting and Greenroof Methodology).

Load out.

The program’s Equations page

Open this report on its own page.

5Files

6Help and methodology