1The problem

The 10-acre subdivision’s outfall has a second-generation baffle box. Its removal, from the manufacturer’s tested data, is 19 % TN and 35 % TP (illustrative).

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)BMP AnalysisSite (illustrative)
Catchment 1: Subdivision (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilySite (illustrative)
Area, pre / post10 / 10 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 75Site (illustrative)
DCIA, pre / post0 / 25 %Site (illustrative)
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
User Defined BMP (worksheet)
BMP nameBaffle Boxes 2nd GenDesign (illustrative)
Provided nitrogen treatment19 %Design (illustrative)
Provided phosphorus treatment35 %Design (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name User defined BMP: baffle box; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis BMP Analysis. (To follow along with the finished project instead, choose File ▸ Open and open user-defined-baffle-box.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Subdivision and enter: Land use (pre) Agricultural - Pasture; Land use (post) Single-Family; Area (pre) 10.00 ac; Area (post) 10.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 75.00; DCIA (post) 25.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.262; Runoff volume (post) 10.917 ac-ft/yr; Nitrogen load (post) 23.825 kg/yr; Phosphorus load (post) 4.402 kg/yr.

    The catchment Subdivision: its Entry tab.
    The catchment Subdivision: its Entry tab.
  3. With Subdivision selected, press Add Treatment and choose User Defined BMP. On its Entry tab type the Treatment name User Defined BMP (BMPFast 2 starts it as “User Defined BMP 1”) and enter: BMP name Baffle Boxes 2nd Gen; Provided nitrogen treatment 19.0 %; Provided phosphorus treatment 35.0 %; Hydraulic capture 35.0 %. The results are calculated as you type: About the capture Check: this 35.0 % equals the phosphorus removal, so it probably came from an older BMPFast file (v1 showed the P removal as the capture). A user-defined BMP passes all its flow on unless you enter a capture: set it to 0 unless the device really holds water back.; Nitrogen removal provided 19.00 %; Phosphorus removal provided 35.00 %.

    The treatment User Defined BMP: its Entry tab.
    The treatment User Defined BMP: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

    The treatment User Defined BMP: its Report tab.
    The treatment User Defined BMP: its Report tab.
  5. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment used
    SubdivisionOutletUser Defined BMP

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  6. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.032 / 0.262
Runoff, pre / post1.350 / 10.917 ac-ft/yr
TN load, pre / post5.044 / 23.825 kg/yr
TP load, pre / post0.987 / 4.402 kg/yr
User Defined BMP: computed by BMPFast
Hydraulic capture efficiency35.00 %
Provided TN / TP removal19.00 % / 35.00 %
TN load in → out23.825 → 19.298 kg/yr
TP load in → out4.402 → 2.861 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet23.825 → 19.298 kg/yr
TP load: catchments → outlet4.402 → 2.861 kg/yr
Provided removal TN / TP19.0 % / 35.0 %

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site19.298 kg/yr19.298 kg/yrsame
Phosphorus leaving the site2.861 kg/yr2.861 kg/yrsame
Site removal, nitrogen19.000 %19.000 %same
Site removal, phosphorus35.000 %35.000 %same
Subdivision: User Defined BMP removal, nitrogen19.000 %19.000 %same
Subdivision: User Defined BMP removal, phosphorus35.000 %35.000 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Removal. A user defined BMP removes the percentages entered: TN 19.0 % and TP 35.0 %. They must be backed by data the permitting agency accepts (help page 809).

Load out.

The program’s Equations page

Open this report on its own page.

5Files

  • user-defined-baffle-box.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
  • user-defined-baffle-box.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
  • Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • User Defined BMP (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • User Defined BMP — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.