BMPFast sample project Example Problem 6: three retention BMPs in series.

1The problem

The BMPFast sample project Example Problem 6: tree wells, an exfiltration trench and a retention basin in series on a 6-acre catchment.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall51 inMean annual rainfall map (help page 815)
Performance standard (analysis type)BMP AnalysisBMPFast sample project
Catchment 1: Road and Commercial Center (Watershed Characteristics)
Land use, pre / postUndeveloped - Dry Prairie / Low-Intensity CommercialBMPFast sample project
Area, pre / post6 / 6 acBMPFast sample project
Non-DCIA curve number, pre / post79 / 85BMPFast sample project
DCIA, pre / post0 / 65 %BMPFast sample project
EMC TN, pre / post2.025 / 0.930 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.184 / 0.188 mg/LBMPFast land use table (AH Vol I Table 9.2)
BMPs in Series (Multiple BMP)
BMP 1: Tree Well40 wells, storage 0.098 ac-ftBMPFast sample project
BMP 2: Exfiltrationstorage 0.069 ac-ftBMPFast sample project
BMP 3: Retentiontreatment depth 1.000 in (0.500 ac-ft)BMPFast sample project

Find: the removal of the series as one system, and the loads leaving the site.

2Steps in BMPFast

  1. Press Open Project and open series-tree-well-exfiltration-retention.bmpt (the file under Files; it is the BMPFast sample project Example problem 6 Multiple BMP _ Cost.bmpt). General Site Information (the main window; its title bar reads General Site Information and your license key) shows Florida Zone 2, 51.0 in of rainfall and the performance standard BMP Analysis.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment to see the catchment (nothing to change). Press Back.

    Watershed Characteristics Worksheet (1. Enter Catchment).
    Watershed Characteristics Worksheet (1. Enter Catchment).
  3. Press 2. Enter Treatment and open Tree Well: BMP 1 of the series is defined on its own worksheet. Press Calculate, then Back.

    BMP 1 of the series on its own worksheet.
    BMP 1 of the series on its own worksheet.
  4. Press 2. Enter Treatment and open Exfiltration: BMP 2 of the series is defined on its own worksheet. Press Calculate, then Back.

    BMP 2 of the series on its own worksheet.
    BMP 2 of the series on its own worksheet.
  5. Press 2. Enter Treatment and open Retention: BMP 3 of the series is defined on its own worksheet. Press Calculate, then Back.

    BMP 3 of the series on its own worksheet.
    BMP 3 of the series on its own worksheet.
  6. On Treatment Options press BMPs in Series. BMP 1 to BMP 3 read Tree Well → Exfiltration → Retention. Press Calculate.

    BMPs in Series (Multiple BMP) worksheet.
    BMPs in Series (Multiple BMP) worksheet.
  7. Calculate opens the series report: each BMP’s inputs and the system’s removal.

    The BMPs in Series report that Calculate opens.
    The BMPs in Series report that Calculate opens.
  8. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Multiple BMP as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
  9. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Summary Report (4. Summary Report) in the Report Viewer.
    The Summary Report (4. Summary Report) in the Report Viewer.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.105 / 0.582
Runoff, pre / post2.667 / 14.841 ac-ft/yr
TN load, pre / post6.660 / 17.018 kg/yr
TP load, pre / post0.605 / 3.440 kg/yr
Multiple BMP: computed by BMPFast
Equivalent Treatment Depth / Efficiency1.333 in / 83.30 %
Treatment depth1.333 in
Hydraulic capture efficiency83.30 %
Provided TN / TP removal83.30 % / 83.30 %
TN load in → out17.018 → 2.842 kg/yr
TP load in → out3.440 → 0.575 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet17.018 → 2.842 kg/yr
TP load: catchments → outlet3.440 → 0.575 kg/yr
Provided removal TN / TP83.3 % / 83.3 %

The BMPs in Series Equations report

Open this report on its own page.

The Summary Report

Open this report on its own page.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Retention in series. Retention BMPs in a row are one system: their treatment depths add to the Equivalent Treatment Depth of 1.333 in, and the retention tables at that depth give the system’s capture, 83.30 % (program TN removal 83.30 %). Adding each basin’s removal as a treatment train would overstate it, because the second basin sees only the larger storms the first one passes (Strand Based Routing for Retention in Series).

Load out.

5Files

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.