All programs › BMPFast › Sample problems
Vegetated natural buffer with plants (detention)
A 100 ft buffer on a 6 % slope; Impaired Water + OFW, Zone 3.
Help: Vegetated Natural Buffer (help page 296) · Download the .bmpt · Link to Solution in BMPFast Version 2
1The problem
A 1.5-acre road edge drains across a 100 ft natural buffer on a 6 % slope. The removal is by the soil and plants (Detention + Plants).
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 3 | Zone map (help page 815) |
| Mean annual rainfall | 54 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Impaired Water + OFW | Site (illustrative) |
| Catchment 1: Road edge (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / Highway | Site (illustrative) |
| Area, pre / post | 1.5 / 1.5 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 80 | Site (illustrative) |
| DCIA, pre / post | 0 / 50 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 1.250 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.173 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Vegetated Natural Buffer (worksheet) | ||
| Retention or Detention + Plants | Detention + Plants | Design (illustrative) |
| Buffer width | 100 ft | Design (illustrative) |
| Buffer length | 500 ft | Design (illustrative) |
| Storage depth | 0.5 ft | Design (illustrative) |
| Width of feeder area | 130 ft | Design (illustrative) |
| Soil storage capacity | 0.15 in/in | Design (illustrative) |
| Buffer width slope | 6 % | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast
Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Vegetated natural buffer: detention + plants, choose Florida Zone 3, enter 54 in of mean annual rainfall and choose the performance standard Impaired Water + OFW.

General Site Information (the main window). Press 1. Enter Catchment. For Catchment 1 type the name Road edge, choose the land uses Undeveloped - Mesic Flatwoods (pre) and Highway (post), enter the areas 1.5 and 1.5 ac, the non-DCIA curve numbers 70 and 80 and the DCIA 0 and 50 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

Watershed Characteristics Worksheet (1. Enter Catchment). Press 2. Enter Treatment and then Vegetated Buffer. On the Vegetated Natural Buffer worksheet: Retention or Detention + Plants Detention + Plants; Buffer width 100 ft; Buffer length 500 ft; Storage depth 0.5 ft; Width of feeder area 130 ft; Soil storage capacity 0.15 in/in; Buffer width slope 6 %. Press Calculate. The report on the worksheet shows the inputs and the results.

The BMP worksheet after Calculate: the report on the left. Press the same button again, now labelled Equations: the worksheet shows each equation with this problem’s values. Press Back to return to the treatment options.

The same worksheet showing Equations: each equation with this problem’s values. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Vegetated Natural Buffer as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

The Summary Report (4. Summary Report) in the Report Viewer.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.078 / 0.463 |
| Runoff, pre / post | 0.526 / 3.125 ac-ft/yr |
| TN load, pre / post | 0.706 / 4.817 kg/yr |
| TP load, pre / post | 0.028 / 0.667 kg/yr |
| Vegetated Natural Buffer: computed by BMPFast | |
| Treatment depth | 0.391 in |
| Provided TN / TP removal | 45.00 % / 25.00 % |
| TN load in → out | 4.817 → 2.649 kg/yr |
| TP load in → out | 0.667 → 0.500 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 4.817 → 2.649 kg/yr |
| TP load: catchments → outlet | 0.667 → 0.500 kg/yr |
| Provided removal TN / TP | 45.0 % / 25.0 % |
| Required removal TN / TP (Maximum % Removal) | 95.0 % (not met) / 95.8 % (not met) |
The BMP report
Open this report on its own page.
The Summary Report
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.463 × 1.50 ac × 54.0 in / 12 | |
| = 3.125 ac-ft/yr (program 3.125). |
| TN load | = EMC × runoff × 1.233 |
| = 1.250 × 3.125 × 1.233 | |
| = 4.817 kg/yr (program 4.817) |
| TP load | = 0.173 × 3.125 × 1.233 |
| = 0.667 kg/yr (program 0.667). |
1.233 kg is 1 mg/L in 1 ac-ft.
Removal. A buffer with plants (detention) holds no volume. Its removal comes from the buffer tables (based on EPA/600/R-05/118) at a slope of 6 % and a width of 100 ft: TN 45 %, TP 25 % (program 45.00 / 25.00).
Load out.
| TN out | = load in × (1 − removal) |
| = 4.817 × (1 − 45.00 / 100) | |
| = 2.649 kg/yr (program 2.649) |
| TP out | = 0.667 × (1 − 25.00 / 100) |
| = 0.500 kg/yr (program 0.500). |
The standard is not met, and that is expected. “Impaired Water + OFW” requires 95 % TN and 95 % TP, and post not above pre, where the HUC 12 has both an impaired water and an OFW (AH Vol I 8.3.4(a)). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 85.4 % and TP 95.8 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 95.0 % and TP 95.8 %. This problem shows what this design removes (45.0 % / 25.0 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).
The program’s Equations page
5Files
- buffer-plants.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
- Equations page (worksheet) (as BMPFast shows it)
- Summary Report (as BMPFast shows it)
- BMP report (worksheet) (as BMPFast shows it)
6Help and methodology
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.