Surface discharge filter with B&G CTS12
A 0.5-inch treatment depth through B&G CTS12 media; BMP Analysis, Zone 2.
Help: Surface Discharge Filter (help page 346) · Download the .bmpt · Link to Solution in BMPFast Version 2
1The problem
A 5-acre subdivision is treated by a surface discharge filter: 0.5 in of runoff over the catchment passes through B&G CTS12 media and is discharged.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 2 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | BMP Analysis | Site (illustrative) |
| Catchment 1: Subdivision (Watershed Characteristics) | ||
| Land use, pre / post | Agricultural - Pasture / Single-Family | Site (illustrative) |
| Area, pre / post | 5 / 5 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 61 / 75 | Site (illustrative) |
| DCIA, pre / post | 0 / 25 % | Site (illustrative) |
| EMC TN, pre / post | 3.030 / 1.770 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.593 / 0.327 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Media mix | B&G CTS12 (TN 60 %, TP 90 %) | BMPFast media table (help page 817) |
| Filtration System (worksheet) | ||
| Treatment Depth | 0.5 in | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast
Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Surface discharge filter: B&G CTS12, choose Florida Zone 2, enter 50 in of mean annual rainfall and choose the performance standard BMP Analysis.

General Site Information (the main window). Press 1. Enter Catchment. For Catchment 1 type the name Subdivision, choose the land uses Agricultural - Pasture (pre) and Single-Family (post), enter the areas 5 and 5 ac, the non-DCIA curve numbers 61 and 75 and the DCIA 0 and 25 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

Watershed Characteristics Worksheet (1. Enter Catchment). Press 2. Enter Treatment, then Surface Discharge Filter, and on its worksheet press Media. Choose B&G CTS12 (TN 60 %, TP 90 % when all the runoff is treated) and press Back.

Enter Media Mix Information (the Media button). Press 2. Enter Treatment and then Surface Discharge Filter. On the Filtration System worksheet: Treatment Depth 0.5 in. Press Calculate. The report on the worksheet shows the inputs and the results.

The BMP worksheet after Calculate: the report on the left. Press the same button again, now labelled Equations: the worksheet shows each equation with this problem’s values. Press Back to return to the treatment options.

The same worksheet showing Equations: each equation with this problem’s values. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Filtration as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

The Summary Report (4. Summary Report) in the Report Viewer.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.032 / 0.262 |
| Runoff, pre / post | 0.675 / 5.458 ac-ft/yr |
| TN load, pre / post | 2.522 / 11.912 kg/yr |
| TP load, pre / post | 0.494 / 2.201 kg/yr |
| Filtration: computed by BMPFast | |
| Treatment depth | 0.500 in |
| Hydraulic capture efficiency | 71.50 % |
| Provided TN / TP removal | 42.90 % / 64.35 % |
| TN load in → out | 11.912 → 6.802 kg/yr |
| TP load in → out | 2.201 → 0.785 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 11.912 → 6.802 kg/yr |
| TP load: catchments → outlet | 2.201 → 0.785 kg/yr |
| Provided removal TN / TP | 42.9 % / 64.3 % |
The BMP report
Open this report on its own page.
The Summary Report
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.262 × 5.00 ac × 50.0 in / 12 | |
| = 5.458 ac-ft/yr (program 5.458). |
| TN load | = EMC × runoff × 1.233 |
| = 1.770 × 5.458 × 1.233 | |
| = 11.912 kg/yr (program 11.912) |
| TP load | = 0.327 × 5.458 × 1.233 |
| = 2.201 kg/yr (program 2.201). |
1.233 kg is 1 mg/L in 1 ac-ft.
Capture. The retention efficiency tables for Florida Zone 2 at a treatment depth of 0.500 in, non-DCIA CN 75.00 and DCIA 25.0 % give a hydraulic capture of 71.50 % (AH Vol I Appendix O; read the same tables with Tools › Retention Efficiency Lookup Tables, help page 4325).
Removal.
The water captured passes through the media and leaves as surface discharge, so removal = capture × media reduction:
| TN | = 71.50 × 60 / 100 |
| = 42.90 % (program 42.90) |
| TP | = 71.50 × 90 / 100 |
| = 64.35 % (program 64.35). |
The media reductions are those of B&G CTS12 (Media and Filtration Methodology).
Load out.
| TN out | = load in × (1 − removal) |
| = 11.912 × (1 − 42.90 / 100) | |
| = 6.802 kg/yr (program 6.802) |
| TP out | = 2.201 × (1 − 64.35 / 100) |
| = 0.785 kg/yr (program 0.785). |
The program’s Equations page
5Files
- filter-cts12.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
- Equations page (worksheet) (as BMPFast shows it)
- Summary Report (as BMPFast shows it)
- BMP report (worksheet) (as BMPFast shows it)
6Help and methodology
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.