SoftwarePlus.ai

All programs › BMPFast › Sample problems

Permeable concrete parking with a stone reservoir

0.5 ac of permeable concrete over #57 rock; BMP Analysis, Zone 3.

1The problem

Half an acre of a 2-acre parking lot is built as permeable concrete (6 in) over 12 in of #57 rock; the rest of the lot drains onto it.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 3Zone map (help page 815)
Mean annual rainfall54 inMean annual rainfall map (help page 815)
Performance standard (analysis type)BMP AnalysisSite (illustrative)
Catchment 1: Commercial site (Watershed Characteristics)
Land use, pre / postUndeveloped - Mesic Flatwoods / High-Intensity CommercialSite (illustrative)
Area, pre / post2 / 2 acSite (illustrative)
Non-DCIA curve number, pre / post70 / 80Site (illustrative)
DCIA, pre / post0 / 70 %Site (illustrative)
EMC TN, pre / post1.087 / 2.400 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.043 / 0.345 mg/LBMPFast land use table (AH Vol I Table 9.2)
Layers (thickness, sustainable void)#57 rock(non-calcareous) 12 in, 21 %, Concrete Permeable Pavement 6 in, 25 %Design; voids from the program’s pavement table
Permeable Pavement (worksheet)
Permeable Pavement Area0.5 acDesign (illustrative)
Time to recover design volume72 hrDesign (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast

  1. Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Permeable pavement: commercial parking, choose Florida Zone 3, enter 54 in of mean annual rainfall and choose the performance standard BMP Analysis.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment. For Catchment 1 type the name Commercial site, choose the land uses Undeveloped - Mesic Flatwoods (pre) and High-Intensity Commercial (post), enter the areas 2 and 2 ac, the non-DCIA curve numbers 70 and 80 and the DCIA 0 and 70 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

    Watershed Characteristics Worksheet (1. Enter Catchment).
    Watershed Characteristics Worksheet (1. Enter Catchment).
  3. Press 2. Enter Treatment, then Permeable Pavement. Type the pavement area, then press Edit Pavement Types and Depths. Enter the layer thicknesses: #57 rock(non-calcareous) 12 in (void 21 %), Concrete Permeable Pavement 6 in (void 25 %). Press Calculate, then Back.

    Edit Pavement Types and Depths: the layers and their thicknesses.
    Edit Pavement Types and Depths: the layers and their thicknesses.
  4. Press 2. Enter Treatment and then Permeable Pavement. On the Permeable Pavement worksheet: Permeable Pavement Area 0.5 ac; Time to recover design volume 72 hr. Press Calculate. The report on the worksheet shows the inputs and the results.

    The BMP worksheet after Calculate: the report on the left.
    The BMP worksheet after Calculate: the report on the left.
  5. Press the same button again, now labelled Equations: the worksheet shows each equation with this problem’s values. Press Back to return to the treatment options.

    The same worksheet showing Equations: each equation with this problem’s values.
    The same worksheet showing Equations: each equation with this problem’s values.
  6. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Permeable Pavement as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
  7. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Summary Report (4. Summary Report) in the Report Viewer.
    The Summary Report (4. Summary Report) in the Report Viewer.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.078 / 0.596
Runoff, pre / post0.702 / 5.364 ac-ft/yr
TN load, pre / post0.941 / 15.873 kg/yr
TP load, pre / post0.037 / 2.282 kg/yr
Permeable Pavement: computed by BMPFast
Treatment depth1.005 in
Hydraulic capture efficiency71.21 %
Provided TN / TP removal71.21 % / 71.21 %
TN load in → out15.873 → 4.570 kg/yr
TP load in → out2.282 → 0.657 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet15.873 → 4.570 kg/yr
TP load: catchments → outlet2.282 → 0.657 kg/yr
Provided removal TN / TP71.2 % / 71.2 %

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Storage.

Treatment depth.

The depth is taken over the whole catchment (2.00 ac): the pavement treats the rain falling on it and the runoff of the 1.50 ac draining onto it.

Capture. The retention efficiency tables for Florida Zone 3 at a treatment depth of 1.005 in, non-DCIA CN 80.00 and DCIA 70.0 % give a hydraulic capture of 71.21 % (AH Vol I Appendix O; read the same tables with Tools › Retention Efficiency Lookup Tables, help page 4325). Permeable pavement is a retention BMP: the removal equals the capture.

Load out.

The program’s Equations page

Open this report on its own page.

5Files

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.