SoftwarePlus.ai

All programs › BMPFast › Sample problems

BMPs in series: permeable pavement then wet pond

BMPFast sample project Example Problem 5: permeable pavement → wet detention.

1The problem

A 6-acre catchment in Zone 5 with permeable pavement draining to a wet detention pond (BMPFast sample project).

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 5Zone map (help page 815)
Mean annual rainfall61 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Specified Removal EfficiencyBMPFast sample project
Specified removal: TN / TP55 % / 75 %BMPFast sample project
Catchment 1: Highway Section 206 (Watershed Characteristics)
Land use, pre / postUndeveloped - Wet Flatwoods / HighwayBMPFast sample project
Area, pre / post6 / 6 acBMPFast sample project
Non-DCIA curve number, pre / post80 / 80BMPFast sample project
DCIA, pre / post0 / 60 %BMPFast sample project
EMC TN, pre / post1.213 / 1.250 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.021 / 0.173 mg/LBMPFast land use table (AH Vol I Table 9.2)
Wet pond area (no loading)1.00 acBMPFast sample project
BMPs in Series (Multiple BMP)
BMP 1: Permeable Pavement2.04 ac, storage 0.592 ac-ftBMPFast sample project
BMP 2: Wet Detentionpermanent pool 3.809 ac-ft, littoral zone yesBMPFast sample project

Find: the removal of the series as one system, and the loads leaving the site.

2Steps in BMPFast

  1. Press Open Project and open series-pavement-wet-detention.bmpt (the file under Files; it is the BMPFast sample project Example Problem 5 one perm pave to det.bmpt). General Site Information (the main window; its title bar reads General Site Information and your license key) shows Florida Zone 5, 61.0 in of rainfall and the performance standard Specified Removal Efficiency.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment to see the catchment (nothing to change). Press Back.

    Watershed Characteristics Worksheet (1. Enter Catchment).
    Watershed Characteristics Worksheet (1. Enter Catchment).
  3. Press 2. Enter Treatment and open Permeable Pavement: BMP 1 of the series is defined on its own worksheet. Press Calculate, then Back.

    BMP 1 of the series on its own worksheet.
    BMP 1 of the series on its own worksheet.
  4. Press 2. Enter Treatment and open Wet Detention: BMP 2 of the series is defined on its own worksheet. Press Calculate, then Back.

    BMP 2 of the series on its own worksheet.
    BMP 2 of the series on its own worksheet.
  5. On Treatment Options press BMPs in Series. BMP 1 to BMP 2 read Permeable Pavement → Wet Detention. Press Calculate.

    BMPs in Series (Multiple BMP) worksheet.
    BMPs in Series (Multiple BMP) worksheet.
  6. Calculate opens the series report: each BMP’s inputs and the system’s removal.

    The BMPs in Series report that Calculate opens.
    The BMPs in Series report that Calculate opens.
  7. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Multiple BMP as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
  8. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Summary Report (4. Summary Report) in the Report Viewer.
    The Summary Report (4. Summary Report) in the Report Viewer.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.157 / 0.547
Runoff, pre / post4.788 / 13.903 ac-ft/yr
TN load, pre / post7.162 / 21.428 kg/yr
TP load, pre / post0.124 / 2.966 kg/yr
Multiple BMP: computed by BMPFast
Equivalent Treatment Depth / Efficiency1.420 in / 79.05 %
Treatment depth1.420 in
Hydraulic capture efficiency79.05 %
Provided TN / TP removal86.48 % / 94.08 %
TN load in → out21.428 → 2.897 kg/yr
TP load in → out2.966 → 0.176 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet21.428 → 2.897 kg/yr
TP load: catchments → outlet2.966 → 0.176 kg/yr
Provided removal TN / TP86.5 % / 94.1 %
Required removal TN / TP (Maximum % Removal)55.0 % (met) / 75.0 % (met)

The BMPs in Series Equations report

Open this report on its own page.

The Summary Report

Open this report on its own page.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Permeable Pavement → Wet Detention. The permeable pavement (a retention BMP) captures 79.05 % of the runoff (treatment depth 1.420 in). Only the rest, 20.95 %, reaches the pond, so the pond’s residence time is worked out on that volume and its removal applies to what reaches it. The system removes TN 86.48 % and TP 94.08 %; the Equations report below lists every step with its numbers (help page 504).

Load out.

5Files

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.