1The problem

The back yards of a 2-acre row of homes (145 ft deep) drain across an undisturbed natural buffer 50 ft wide and 600 ft long that infiltrates.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)BMP AnalysisSite (illustrative)
Catchment 1: Backyards (Watershed Characteristics)
Land use, pre / postUndeveloped - Mesic Flatwoods / Single-FamilySite (illustrative)
Area, pre / post2 / 2 acSite (illustrative)
Non-DCIA curve number, pre / post70 / 75Site (illustrative)
DCIA, pre / post0 / 20 %Site (illustrative)
EMC TN, pre / post1.087 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.043 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
Vegetated Natural Buffer (worksheet)
Retention or Detention + PlantsRetentionDesign (illustrative)
Buffer width50 ftDesign (illustrative)
Buffer length600 ftDesign (illustrative)
Storage depth1 ftDesign (illustrative)
Width of feeder area145 ftDesign (illustrative)
Soil storage capacity0.2 in/inDesign (illustrative)
Buffer width slope2 %Design (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast

  1. Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Vegetated natural buffer: retention, choose Florida Zone 2, enter 50 in of mean annual rainfall and choose the performance standard BMP Analysis.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment. For Catchment 1 type the name Backyards, choose the land uses Undeveloped - Mesic Flatwoods (pre) and Single-Family (post), enter the areas 2 and 2 ac, the non-DCIA curve numbers 70 and 75 and the DCIA 0 and 20 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

    Watershed Characteristics Worksheet (1. Enter Catchment).
    Watershed Characteristics Worksheet (1. Enter Catchment).
  3. Press 2. Enter Treatment and then Vegetated Buffer. On the Vegetated Natural Buffer worksheet: Retention or Detention + Plants Retention; Buffer width 50 ft; Buffer length 600 ft; Storage depth 1 ft; Width of feeder area 145 ft; Soil storage capacity 0.2 in/in; Buffer width slope 2 %. Press Calculate. The report on the worksheet shows the inputs and the results.

    The BMP worksheet after Calculate: the report on the left.
    The BMP worksheet after Calculate: the report on the left.
  4. Press the same button again, now labelled Equations: the worksheet shows each equation with this problem’s values. Press Back to return to the treatment options.

    The same worksheet showing Equations: each equation with this problem’s values.
    The same worksheet showing Equations: each equation with this problem’s values.
  5. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Vegetated Natural Buffer as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
  6. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Summary Report (4. Summary Report) in the Report Viewer.
    The Summary Report (4. Summary Report) in the Report Viewer.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.057 / 0.225
Runoff, pre / post0.475 / 1.875 ac-ft/yr
TN load, pre / post0.637 / 4.092 kg/yr
TP load, pre / post0.025 / 0.756 kg/yr
Vegetated Natural Buffer: computed by BMPFast
Treatment depth0.615 in
Hydraulic capture efficiency75.73 %
Provided TN / TP removal75.73 % / 75.73 %
TN load in → out4.092 → 0.993 kg/yr
TP load in → out0.756 → 0.183 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet4.092 → 0.993 kg/yr
TP load: catchments → outlet0.756 → 0.183 kg/yr
Provided removal TN / TP75.7 % / 75.7 %

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Treatment depth.

Capture. The retention efficiency tables for Florida Zone 2 at a treatment depth of 0.615 in, non-DCIA CN 75.00 and DCIA 20.0 % give a hydraulic capture of 75.73 % (AH Vol I Appendix O; read the same tables with Tools › Retention Efficiency Lookup Tables, help page 4325). As a retention system the removal equals the capture.

Load out.

The program’s Equations page

Open this report on its own page.

5Files

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.