1The problem

The BMPFast sample project example problem 1 swale ground water discharge: a roadside swale treats the runoff of the road and its shoulders.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 1Zone map (help page 815)
Mean annual rainfall60 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Net ImprovementBMPFast sample project
Catchment 1: roadside (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / HighwayBMPFast sample project
Area, pre / post1.2 / 1.2 acBMPFast sample project
Non-DCIA curve number, pre / post80 / 85BMPFast sample project
DCIA, pre / post0 / 60 %BMPFast sample project
EMC TN, pre / post3.030 / 1.250 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.173 mg/LBMPFast land use table (AH Vol I Table 9.2)
Swale (worksheet)
Swale top width for flood conditions [W]10 ftBMPFast sample project
Swale bottom width [B]0 ftBMPFast sample project
Swale length [L]871.2 ftBMPFast sample project
Average catchment length871.2 ftBMPFast sample project
Average impervious width (including shoulder)20 ftBMPFast sample project
Average width of pervious area including swale40 ftBMPFast sample project
Swale slope [S]0.001 ft/ftBMPFast sample project
Manning's n0.05BMPFast sample project
Soil infiltration rate2.5 in/hrBMPFast sample project
Side slope [Z]5 H:VBMPFast sample project
Average height of the swale blocks [H]0 ftBMPFast sample project
Length of the berm upstream of the crest0 ftBMPFast sample project
Number of swale blocks0BMPFast sample project

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name swale example 1; Meteorological zone Florida Zone 1; Mean annual rainfall 60.00 in; Type of analysis Net Improvement; Conduct groundwater discharge analysis Yes. (To follow along with the finished project instead, choose File ▸ Open and open swale-groundwater.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name roadside and enter: Land use (pre) Agricultural - Pasture; Land use (post) Highway; Area (pre) 1.20 ac; Area (post) 1.20 ac; Non-DCIA curve number (pre) 80.00; Non-DCIA curve number (post) 85.00; DCIA (post) 60.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.598; Runoff volume (post) 3.588 ac-ft/yr; Nitrogen load (post) 5.530 kg/yr; Phosphorus load (post) 0.765 kg/yr.

    The catchment roadside : its Entry tab.
    The catchment roadside : its Entry tab.
  3. With roadside selected, press Add Treatment and choose Swale. On its Entry tab type the Treatment name Swale (BMPFast 2 starts it as “Swale 1”) and enter: Top width for flood conditions [W] 10.00 ft; Length [L] 871.20 ft; Slope [S] 0.0010 ft/ft; Side slope [Z] 5.00 H:V; Manning's n 0.050; Soil infiltration rate 2.50 in/hr; Average impervious width (including shoulder) 20.00 ft; Average catchment length 871.20 ft; Average pervious width (including the swale) 40.00 ft; Media mix B&G CTS24; Is the media design residence time more than 2 hours? Yes; Media nitrogen reduction 75.00 %; Media phosphorus reduction 95.00 %. The results are calculated as you type: Swale catchment area used 1.20 ac; Rainfall excess area 0.600 ac; Retention volume 0.020 ac-ft; Treatment depth 0.396 in; Nitrogen removal provided 38.85 %; Phosphorus removal provided 38.85 %.

    The treatment Swale: its Entry tab.
    The treatment Swale: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

    The treatment Swale: its Report tab.
    The treatment Swale: its Report tab.
  5. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment used
    roadside OutletSwale

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  6. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.162 / 0.598
Runoff, pre / post0.972 / 3.588 ac-ft/yr
TN load, pre / post3.631 / 5.530 kg/yr
TP load, pre / post0.711 / 0.765 kg/yr
Swale: computed by BMPFast
Treatment depth0.396 in
Hydraulic capture efficiency38.85 %
Provided TN / TP removal38.85 % / 38.85 %
TN load in → out5.530 → 3.382 kg/yr
TP load in → out0.765 → 0.468 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet5.530 → 3.382 kg/yr
TP load: catchments → outlet0.765 → 0.468 kg/yr
Provided removal TN / TP38.8 % / 38.8 %
Required removal TN / TP (Maximum % Removal)34.3 % (met) / 7.1 % (met)

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site3.382 kg/yr3.382 kg/yrsame
Phosphorus leaving the site0.468 kg/yr0.468 kg/yrsame
Site removal, nitrogen38.847 %38.847 %same
Site removal, phosphorus38.847 %38.847 %same
roadside : Swale removal, nitrogen38.847 %38.847 %same
roadside : Swale removal, phosphorus38.847 %38.847 %same

Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Infiltration. With no swale blocks the treatment depth is the depth infiltrated along the swale: 0.3959 in (program treatment depth 0.3959; the Equations page shows the Manning and infiltration steps).

Capture. The retention efficiency tables for Florida Zone 1 at a treatment depth of 0.396 in, non-DCIA CN 85.00 and DCIA 60.0 % give a hydraulic capture of 38.85 % (AH Vol I Appendix O; read the same tables with Calculators ▸ Retention Efficiency Tables, help page 4325). A swale is a retention BMP: the removal equals the capture.

Load out.

The program’s Equations page

Open this report on its own page.

5Files

  • swale-groundwater.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
  • swale-groundwater.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
  • Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Swale (BMPFast 2’s report, as Open in browser on its Report tab gives it)
  • Swale — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.