Greenroof with a cistern for irrigation
One acre of greenroof with 2 in of cistern storage, Miami; Redevelopment + Impaired.
Help: Greenroof (help page 288) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
A 1-acre hotel roof in Miami is a greenroof whose filtrate goes to a cistern of 2 in over the roof; the water irrigates the roof (20 in/yr).
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 5 | Zone map (help page 815) |
| Mean annual rainfall | 60 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Redevelopment + Impaired | Site (illustrative) |
| Catchment 1: Hotel roof (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / Conventional Roofs | Site (illustrative) |
| Area, pre / post | 1 / 1 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 98 | Site (illustrative) |
| DCIA, pre / post | 0 / 100 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 1.050 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.120 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Greenroof (worksheet) | ||
| Rainfall station | Miami #5663 | Design (illustrative) |
| Greenroof area | 43560 sf | Design (illustrative) |
| Cistern storage over greenroof area | 2.0 in | Design (illustrative) |
| Irrigation demand | 20 in/yr | Design (illustrative) |
| Rainfall excess (filtrate underdrain flow) | 0 in/yr | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Greenroof: with cistern for irrigation; Meteorological zone Florida Zone 5; Mean annual rainfall 60.00 in; Type of analysis Redevelopment + Impaired. (To follow along with the finished project instead, choose File ▸ Open and open
greenroof-cistern.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Hotel roof and enter: Land use (pre) Undeveloped - Mesic Flatwoods; Land use (post) Conventional Roofs; Area (pre) 1.00 ac; Area (post) 1.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 98.00; DCIA (post) 100.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.808; Runoff volume (post) 4.040 ac-ft/yr; Nitrogen load (post) 5.230 kg/yr; Phosphorus load (post) 0.598 kg/yr.

The catchment Hotel roof: its Entry tab. With Hotel roof selected, press Add Treatment and choose Greenroof. On its Entry tab type the Treatment name Greenroof (BMPFast 2 starts it as “Greenroof 1”) and enter: Removal method Rainfall station curves; Rainfall station Miami #5663; Cistern storage over the greenroof area (0 = no cistern) 2.00 in; Greenroof area 43,560.00 ft²; Irrigation demand 20.00 in/yr. The results are calculated as you type: Hydraulic capture 69.00 %; Nitrogen removal provided 69.10 %; Phosphorus removal provided 69.10 %.

The treatment Greenroof: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment Greenroof: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Hotel roof Outlet Greenroof A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.093 / 0.808 |
| Runoff, pre / post | 0.465 / 4.040 ac-ft/yr |
| TN load, pre / post | 0.623 / 5.230 kg/yr |
| TP load, pre / post | 0.025 / 0.598 kg/yr |
| Greenroof: computed by BMPFast | |
| Treatment depth | 2.000 in |
| Hydraulic capture efficiency | 69.00 % |
| Provided TN / TP removal | 69.10 % / 69.10 % |
| TN load in → out | 5.230 → 1.616 kg/yr |
| TP load in → out | 0.598 → 0.185 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 5.230 → 1.616 kg/yr |
| TP load: catchments → outlet | 0.598 → 0.185 kg/yr |
| Provided removal TN / TP | 69.1 % / 69.1 % |
| Required removal TN / TP (Maximum % Removal) | 88.1 % (not met) / 95.9 % (not met) |
The BMP report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 1.616 kg/yr | 1.616 kg/yr | same |
| Phosphorus leaving the site | 0.185 kg/yr | 0.185 kg/yr | same |
| Site removal, nitrogen | 69.103 % | 69.103 % | same |
| Site removal, phosphorus | 69.103 % | 69.103 % | same |
| Hotel roof: Greenroof removal, nitrogen | 69.103 % | 69.103 % | same |
| Hotel roof: Greenroof removal, phosphorus | 69.103 % | 69.103 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.808 × 1.00 ac × 60.0 in / 12 | |
| = 4.040 ac-ft/yr (program 4.040). |
| TN load | = EMC × runoff × 1.233 |
| = 1.050 × 4.040 × 1.233 | |
| = 5.230 kg/yr (program 5.230) |
| TP load | = 0.120 × 4.040 × 1.233 |
| = 0.598 kg/yr (program 0.598). |
1.233 kg is 1 mg/L in 1 ac-ft.
Capture. With 2.00 in of cistern storage over the roof and 20 in/yr of irrigation demand, the greenroof tables for Miami #5663 give 69.00 %. The water that stays on the roof keeps its nitrogen and phosphorus, so the TN and TP removal equal the capture (Harvesting and Greenroof Methodology).
Load out.
| TN out | = load in × (1 − removal) |
| = 5.230 × (1 − 69.10 / 100) | |
| = 1.616 kg/yr (program 1.616) |
| TP out | = 0.598 × (1 − 69.10 / 100) |
| = 0.185 kg/yr (program 0.185). |
The standard is not met, and that is expected. “Redevelopment + Impaired” requires the redevelopment percentages, 45 % TN and 80 % TP, together with the pre/post comparison (AH Vol I 8.3.5(c)). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 88.1 % and TP 95.9 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 88.1 % and TP 95.9 %. This problem shows what this design removes (69.1 % / 69.1 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).
The program’s Equations page
5Files
- greenroof-cistern.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- greenroof-cistern.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Greenroof (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Greenroof — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.