SoftwarePlus.ai

All programs › BMPFast › Sample problems

Reports: Summary and Complete

BMPFast sample project: no treatment upstream of a wet pond.

1The problem

The BMPFast sample project no BMP upstream detention: an untreated catchment drains to a catchment with a wet pond. Print the Summary Report and the Complete Report.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Specified Removal EfficiencyBMPFast sample project
Specified removal: TN / TP75 % / 75 %BMPFast sample project
Catchment 1: downstream (Watershed Characteristics)
Land use, pre / postUser Defined Values / User Defined ValuesBMPFast sample project
Area, pre / post1 / 1 acBMPFast sample project
Non-DCIA curve number, pre / post70 / 70BMPFast sample project
DCIA, pre / post24.33 / 24.33 %BMPFast sample project
EMC TN, pre / post0.811 / 0.811 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.811 / 0.811 mg/LBMPFast land use table (AH Vol I Table 9.2)
BMP used in routingWet Detention: permanent pool 0.1 ac-ft; Check if there is a littoral zone ticked; MAPs credit 0 %BMPFast sample project
Routes tothe OutletBMPFast sample project
Catchment 2: upstream (Watershed Characteristics)
Land use, pre / postUser Defined Values / User Defined ValuesBMPFast sample project
Area, pre / post99 / 99 acBMPFast sample project
Non-DCIA curve number, pre / post70 / 70BMPFast sample project
DCIA, pre / post24.33 / 24.33 %BMPFast sample project
EMC TN, pre / post0.811 / 0.811 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.811 / 0.811 mg/LBMPFast land use table (AH Vol I Table 9.2)
BMP used in routingNo Treatment (no BMP)BMPFast sample project
Routes toCatchment 1BMPFast sample project

Find: what each report shows and where its numbers come from.

2Steps in BMPFast

  1. Press Open Project and open reports-summary-complete.bmpt (the file under Files; it is the BMPFast sample project No BMP Upstream then detention.bmpt). General Site Information (the main window; its title bar reads General Site Information and your license key) shows Florida Zone 2, 50.0 in of rainfall and the performance standard Specified Removal Efficiency.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment and click Catchment 1 in the menu bar at the top of the Watershed Characteristics Worksheet. It holds: name downstream; land uses User Defined Values (pre) and User Defined Values (post); areas 1 and 1 ac; non-DCIA CN 70 and 70; DCIA 24.33 and 24.33 %. Press Back.

  3. On the Watershed Characteristics Worksheet click Catchment 2 in the menu bar: name upstream; land uses User Defined Values (pre) and User Defined Values (post); areas 99 and 99 ac; non-DCIA CN 70 and 70; DCIA 24.33 and 24.33 %.

  4. Press 2. Enter Treatment, click Catchment 1 in the menu bar to make it current, and press Wet Detention to see its BMP: permanent pool 0.1 ac-ft; Check if there is a littoral zone ticked; MAPs credit 0 %. Press Calculate, then Back.

  5. On the main window press 3. Configure Catchments. in the row of Catchment 1 press Edit (the Routing Catchment From: 1 window opens). In Select BMP to use in routing choose Wet Detention; in Select Catchment to Route to choose the Outlet. Press Back.

  6. Back on Select Catchment Configuration, in the row of Catchment 2 press Edit (the Routing Catchment From: 2 window opens). In Select BMP to use in routing choose No Treatment; in Select Catchment to Route to choose Catchment 1. Press Back (Back again closes Select Catchment Configuration).

  7. Press 4. Summary Report: the catchments, the runoff, the removal against the standard and the loads.

    The Summary Report (4. Summary Report) in the Report Viewer.
    The Summary Report (4. Summary Report) in the Report Viewer.
  8. Press 5. Complete Report: the routing table node by node, then every catchment and its BMP. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Complete Report (5. Complete Report).
    The Complete Report (5. Complete Report).

3Results

ResultValue
Site (all catchments, at the outlet)
TN load: catchments → outlet100.014 → 96.648 kg/yr
TP load: catchments → outlet100.014 → 66.086 kg/yr
Provided removal TN / TP3.4 % / 33.9 %
Required removal TN / TP (Maximum % Removal)75.0 % (not met) / 75.0 % (not met)

The Summary Report

Open this report on its own page.

The Complete Report

Open this report on its own page.

4Check

The reports agree. Both reports come from the same calculation: the outlet loads of the Summary Report are the last node of the Complete Report’s routing table, TN 96.648 and TP 66.086 kg/yr. The catchment loads add up to the total load (100.014 kg/yr TN) (help page 813).

5Files

  • reports-summary-complete.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
  • Summary Report (as BMPFast shows it)
  • Complete Report (as BMPFast shows it)

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.