SoftwarePlus.ai

All programs › BMPFast › Sample problems

Rainwater harvesting for a house

A 1,500-gallon cistern on a shingle roof; BMP Analysis, Zone 2.

1The problem

A 3,049 sf shingle roof fills a 1,500-gallon cistern used to irrigate 5,000 sf of lawn at 1.0 in/week.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)BMP AnalysisSite (illustrative)
Catchment 1: Roof (Watershed Characteristics)
Land use, pre / postUndeveloped - Mesic Flatwoods / Conventional RoofsSite (illustrative)
Area, pre / post0.07 / 0.07 acSite (illustrative)
Non-DCIA curve number, pre / post70 / 98Site (illustrative)
DCIA, pre / post0 / 100 %Site (illustrative)
EMC TN, pre / post1.087 / 1.050 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.043 / 0.120 mg/LBMPFast land use table (AH Vol I Table 9.2)
Rainwater Harvesting (worksheet)
Roof typeSHINGLES, 25% SLOPEDesign (illustrative)
Contributing area3049 sfDesign (illustrative)
Available harvest volume1500 galDesign (illustrative)
Harvest rate1.0 in/weekDesign (illustrative)
Area available for irrigation5000 sfDesign (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast

  1. Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Rainwater harvesting: house with cistern, choose Florida Zone 2, enter 50 in of mean annual rainfall and choose the performance standard BMP Analysis.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment. For Catchment 1 type the name Roof, choose the land uses Undeveloped - Mesic Flatwoods (pre) and Conventional Roofs (post), enter the areas 0.07 and 0.07 ac, the non-DCIA curve numbers 70 and 98 and the DCIA 0 and 100 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

    Watershed Characteristics Worksheet (1. Enter Catchment).
    Watershed Characteristics Worksheet (1. Enter Catchment).
  3. Press 2. Enter Treatment and then Rainwater Harvesting. On the Rainwater Harvesting worksheet: Roof type SHINGLES, 25% SLOPE; Contributing area 3049 sf; Available harvest volume 1500 gal; Harvest rate 1.0 in/week; Area available for irrigation 5000 sf. Press Calculate. The report on the worksheet shows the inputs and the results.

    The BMP worksheet after Calculate: the report on the left.
    The BMP worksheet after Calculate: the report on the left.
  4. Press the same button again, now labelled Equations: the worksheet shows each equation with this problem’s values. Press Back to return to the treatment options.

    The same worksheet showing Equations: each equation with this problem’s values.
    The same worksheet showing Equations: each equation with this problem’s values.
  5. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Rainwater Harvesting as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
  6. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Summary Report (4. Summary Report) in the Report Viewer.
    The Summary Report (4. Summary Report) in the Report Viewer.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.057 / 0.809
Runoff, pre / post0.017 / 0.236 ac-ft/yr
TN load, pre / post0.022 / 0.305 kg/yr
TP load, pre / post0.001 / 0.035 kg/yr
Rainwater Harvesting: computed by BMPFast
Hydraulic capture efficiency76.21 %
Provided TN / TP removal76.21 % / 76.21 %
TN load in → out0.305 → 0.073 kg/yr
TP load in → out0.035 → 0.008 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet0.305 → 0.073 kg/yr
TP load: catchments → outlet0.035 → 0.008 kg/yr
Provided removal TN / TP76.2 % / 76.2 %

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

REV coordinates.

Capture. The rate-efficiency-volume (REV) curves for Florida Zone 2 at those coordinates give 76.21 %; water that is used is not discharged, so TN and TP removal equal it (Harvesting and Greenroof Methodology).

Load out.

The program’s Equations page

Open this report on its own page.

5Files

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.