All programs › BMPFast › BMPFast 2 sample problems
Vegetated filter strip with media (detention)
A 30 ft strip with B&G CTS12 media; Impaired Water + OFW, Zone 4.
Help: Vegetated Filter Strip (help page 304) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
A 2-acre highway sheds its runoff across a 30 ft filter strip, 800 ft long, built over B&G CTS12 media (detention).
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 4 | Zone map (help page 815) |
| Mean annual rainfall | 52 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Impaired Water + OFW | Site (illustrative) |
| Catchment 1: Highway (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / Highway | Site (illustrative) |
| Area, pre / post | 2 / 2 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 80 | Site (illustrative) |
| DCIA, pre / post | 0 / 50 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 1.250 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.173 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Media mix | B&G CTS12 (TN 60 %, TP 90 %) | BMPFast media table (help page 817) |
| Vegetated Filter Strip (worksheet) | ||
| System type | Detention | Design (illustrative) |
| VFS width | 30 ft | Design (illustrative) |
| VFS length | 800 ft | Design (illustrative) |
| VFS depth | 2 ft | Design (illustrative) |
| Width of DCIA | 79 ft | Design (illustrative) |
| VFS storage capacity | 0.25 in/in | Design (illustrative) |
| VFS slope | 4 % | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Vegetated filter strip: detention with media; Meteorological zone Florida Zone 4; Mean annual rainfall 52.00 in; Type of analysis Impaired Water + OFW; Conduct groundwater discharge analysis Yes. (To follow along with the finished project instead, choose File ▸ Open and open
filter-strip-media.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Highway and enter: Land use (pre) Undeveloped - Mesic Flatwoods; Land use (post) Highway; Area (pre) 2.00 ac; Area (post) 2.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 80.00; DCIA (post) 50.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.476; Runoff volume (post) 4.125 ac-ft/yr; Nitrogen load (post) 6.358 kg/yr; Phosphorus load (post) 0.880 kg/yr.

The catchment Highway: its Entry tab. With Highway selected, press Add Treatment and choose Vegetated Filter Strip. On its Entry tab type the Treatment name Vegetated Filter Strip (BMPFast 2 starts it as “Vegetated Filter Strip 1”) and enter: System type Detention; Strip width 30.00 ft; Strip length 800.00 ft; Strip depth 2.00 ft; Width of the DCIA 79.00 ft; Storage capacity 0.25 in/in; Strip slope 4.00 %; Media mix B&G CTS12; Is the media design residence time more than 2 hours? Yes; Media nitrogen reduction 60.00 %; Media phosphorus reduction 90.00 %. The results are calculated as you type: Runoff (feeder) area 1.451 ac; Buffer area 0.551 ac; Treatment depth 1.651 in; Nitrogen removal provided 75.60 %; Phosphorus removal provided 92.70 %.

The treatment Vegetated Filter Strip: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment Vegetated Filter Strip: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Highway Outlet Vegetated Filter Strip A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.071 / 0.476 |
| Runoff, pre / post | 0.615 / 4.125 ac-ft/yr |
| TN load, pre / post | 0.825 / 6.358 kg/yr |
| TP load, pre / post | 0.033 / 0.880 kg/yr |
| Vegetated Filter Strip: computed by BMPFast | |
| Treatment depth | 1.651 in |
| Provided TN / TP removal | 75.60 % / 92.70 % |
| TN load in → out | 6.358 → 1.551 kg/yr |
| TP load in → out | 0.880 → 0.064 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 6.358 → 1.551 kg/yr |
| TP load: catchments → outlet | 0.880 → 0.064 kg/yr |
| Provided removal TN / TP | 75.6 % / 92.7 % |
| Required removal TN / TP (Maximum % Removal) | 95.0 % (not met) / 96.3 % (not met) |
The BMP report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 1.551 kg/yr | 1.551 kg/yr | same |
| Phosphorus leaving the site | 0.064 kg/yr | 0.064 kg/yr | same |
| Site removal, nitrogen | 75.600 % | 75.600 % | same |
| Site removal, phosphorus | 92.700 % | 92.700 % | same |
| Highway: Vegetated Filter Strip removal, nitrogen | 75.600 % | 75.600 % | same |
| Highway: Vegetated Filter Strip removal, phosphorus | 92.700 % | 92.700 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.476 × 2.00 ac × 52.0 in / 12 | |
| = 4.125 ac-ft/yr (program 4.125). |
| TN load | = EMC × runoff × 1.233 |
| = 1.250 × 4.125 × 1.233 | |
| = 6.358 kg/yr (program 6.358) |
| TP load | = 0.173 × 4.125 × 1.233 |
| = 0.880 kg/yr (program 0.880). |
1.233 kg is 1 mg/L in 1 ac-ft.
Removal.
The buffer tables at a slope of 4 % and a width of 30 ft give TN 39 % and TP 27 %. The media then treat what is left:
| TN | = 39 + 60 × (100 − 39) / 100 |
| = 75.60 % (program 75.60) |
| TP | = 27 + 90 × (100 − 27) / 100 |
| = 92.70 % (program 92.70). |
Load out.
| TN out | = load in × (1 − removal) |
| = 6.358 × (1 − 75.60 / 100) | |
| = 1.551 kg/yr (program 1.551) |
| TP out | = 0.880 × (1 − 92.70 / 100) |
| = 0.064 kg/yr (program 0.064). |
The standard is not met, and that is expected. “Impaired Water + OFW” requires 95 % TN and 95 % TP, and post not above pre, where the HUC 12 has both an impaired water and an OFW (AH Vol I 8.3.4(a)). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 87.0 % and TP 96.3 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 95.0 % and TP 96.3 %. This problem shows what this design removes (75.6 % / 92.7 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).
The program’s Equations page
5Files
- filter-strip-media.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- filter-strip-media.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Vegetated Filter Strip (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Vegetated Filter Strip — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.