SoftwarePlus.ai

All programs › BMPFast › Sample problems

User defined BMP: second-generation baffle box

A baffle box with 19 % TN and 35 % TP removal; BMP Analysis, Zone 2.

1The problem

The 10-acre subdivision’s outfall has a second-generation baffle box. Its removal, from the manufacturer’s tested data, is 19 % TN and 35 % TP (illustrative).

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)BMP AnalysisSite (illustrative)
Catchment 1: Subdivision (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilySite (illustrative)
Area, pre / post10 / 10 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 75Site (illustrative)
DCIA, pre / post0 / 25 %Site (illustrative)
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
User Defined BMP (worksheet)
BMP nameBaffle Boxes 2nd GenDesign (illustrative)
Provided nitrogen treatment19 %Design (illustrative)
Provided phosphorus treatment35 %Design (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast

  1. Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name User defined BMP: baffle box, choose Florida Zone 2, enter 50 in of mean annual rainfall and choose the performance standard BMP Analysis.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment. For Catchment 1 type the name Subdivision, choose the land uses Agricultural - Pasture (pre) and Single-Family (post), enter the areas 10 and 10 ac, the non-DCIA curve numbers 61 and 75 and the DCIA 0 and 25 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

    Watershed Characteristics Worksheet (1. Enter Catchment).
    Watershed Characteristics Worksheet (1. Enter Catchment).
  3. Press 2. Enter Treatment and then User Defined. On the User Defined BMP worksheet: BMP name Baffle Boxes 2nd Gen; Provided nitrogen treatment 19 %; Provided phosphorus treatment 35 %. Press Calculate. The report on the worksheet shows the inputs and the results.

    The BMP worksheet after Calculate: the report on the left.
    The BMP worksheet after Calculate: the report on the left.
  4. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose User Defined BMP as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
  5. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Summary Report (4. Summary Report) in the Report Viewer.
    The Summary Report (4. Summary Report) in the Report Viewer.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.032 / 0.262
Runoff, pre / post1.350 / 10.917 ac-ft/yr
TN load, pre / post5.044 / 23.825 kg/yr
TP load, pre / post0.987 / 4.402 kg/yr
User Defined BMP: computed by BMPFast
Hydraulic capture efficiency35.00 %
Provided TN / TP removal19.00 % / 35.00 %
TN load in → out23.825 → 19.298 kg/yr
TP load in → out4.402 → 2.861 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet23.825 → 19.298 kg/yr
TP load: catchments → outlet4.402 → 2.861 kg/yr
Provided removal TN / TP19.0 % / 35.0 %

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Removal. A user defined BMP removes the percentages entered: TN 19.0 % and TP 35.0 %. They must be backed by data the permitting agency accepts (help page 809).

Load out.

5Files

  • user-defined-baffle-box.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
  • Summary Report (as BMPFast shows it)
  • BMP report (worksheet) (as BMPFast shows it)

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.