All programs › BMPFast › BMPFast 2 sample problems
Retention for a specified removal of 75 %
BMPFast sample project Example Problem 3: 11 ac, Zone 4, Specified Removal Efficiency 75 / 75 %.
Help: Retention (help page 207) · Download the .bmpf · Link to Solution in BMPFast Version 1
1The problem
The BMPFast sample project Example Problem 3: an 11-acre pasture becomes single-family homes in Zone 4. The permit asks for a specified removal of 75 % TN and 75 % TP. The retention volume is the one the program’s Get Depth gives for 75 %: a treatment depth of 0.552 in, or 0.506 ac-ft over 11 ac.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 4 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Specified Removal Efficiency | BMPFast sample project |
| Specified removal: TN / TP | 75 % / 75 % | BMPFast sample project |
| Catchment 1: catchment 1 (Watershed Characteristics) | ||
| Land use, pre / post | Agricultural - Pasture / Single-Family | BMPFast sample project |
| Area, pre / post | 11 / 11 ac | BMPFast sample project |
| Non-DCIA curve number, pre / post | 50 / 65 | BMPFast sample project |
| DCIA, pre / post | 0 / 25 % | BMPFast sample project |
| EMC TN, pre / post | 3.030 / 1.770 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.593 / 0.327 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Retention System (worksheet) | ||
| Provided Retention Volume | 0.506 ac-ft | BMPFast sample project |
| Time to recover design volume | 72 hr | BMPFast sample project |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Example Problem # 3; Meteorological zone Florida Zone 4; Mean annual rainfall 50.00 in; Type of analysis Specified Removal Efficiency; Nitrogen Removal Performance Specified 75 %; Phosphorus Removal Performance Specified 75 %. (To follow along with the finished project instead, choose File ▸ Open and open
retention-specified-removal.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name catchment 1 and enter: Land use (pre) Agricultural - Pasture; Land use (post) Single-Family; Area (pre) 11.00 ac; Area (post) 11.00 ac; Non-DCIA curve number (pre) 50.00; Non-DCIA curve number (post) 65.00; DCIA (post) 25.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.246; Runoff volume (post) 11.275 ac-ft/yr; Nitrogen load (post) 24.607 kg/yr; Phosphorus load (post) 4.546 kg/yr.

The catchment catchment 1: its Entry tab. With catchment 1 selected, press Add Treatment and choose Retention. On its Entry tab type the Treatment name Retention (BMPFast 2 starts it as “Retention 1”) and enter: Provided retention volume 0.506 ac-ft; Time to recover the design volume 72.00 hr; Media mix None. The results are calculated as you type: Treatment depth 0.552 in; Nitrogen removal provided 75.01 %; Phosphorus removal provided 75.01 %.

The treatment Retention: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment Retention: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used catchment 1 Outlet Retention A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.022 / 0.246 |
| Runoff, pre / post | 1.008 / 11.275 ac-ft/yr |
| TN load, pre / post | 3.767 / 24.607 kg/yr |
| TP load, pre / post | 0.737 / 4.546 kg/yr |
| Retention: computed by BMPFast | |
| Treatment depth | 0.552 in |
| Hydraulic capture efficiency | 75.01 % |
| Provided TN / TP removal | 75.01 % / 75.01 % |
| TN load in → out | 24.607 → 6.150 kg/yr |
| TP load in → out | 4.546 → 1.136 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 24.607 → 6.150 kg/yr |
| TP load: catchments → outlet | 4.546 → 1.136 kg/yr |
| Provided removal TN / TP | 75.0 % / 75.0 % |
| Required removal TN / TP (Maximum % Removal) | 75.0 % (met) / 75.0 % (met) |
The BMP report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 6.150 kg/yr | 6.150 kg/yr | same |
| Phosphorus leaving the site | 1.136 kg/yr | 1.136 kg/yr | same |
| Site removal, nitrogen | 75.006 % | 75.006 % | same |
| Site removal, phosphorus | 75.006 % | 75.006 % | same |
| catchment 1: Retention removal, nitrogen | 75.006 % | 75.006 % | same |
| catchment 1: Retention removal, phosphorus | 75.006 % | 75.006 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.246 × 11.00 ac × 50.0 in / 12 | |
| = 11.275 ac-ft/yr (program 11.275). |
| TN load | = EMC × runoff × 1.233 |
| = 1.770 × 11.275 × 1.233 | |
| = 24.607 kg/yr (program 24.607) |
| TP load | = 0.327 × 11.275 × 1.233 |
| = 4.546 kg/yr (program 4.546). |
1.233 kg is 1 mg/L in 1 ac-ft.
Treatment depth.
| Depth | = retention volume × 12 / area |
| = 0.5060 ac-ft × 12 / 11.00 ac | |
| = 0.552 in (program 0.552). |
Capture. The retention efficiency tables for Florida Zone 4 at a treatment depth of 0.552 in, non-DCIA CN 65.00 and DCIA 25.0 % give a hydraulic capture of 75.01 % (AH Vol I Appendix O; read the same tables with Calculators ▸ Retention Efficiency Tables, help page 4325). For retention every pollutant in the captured water stays on site, so the TN and TP removal equal the capture.
Load out.
| TN out | = load in × (1 − removal) |
| = 24.607 × (1 − 75.01 / 100) | |
| = 6.150 kg/yr (program 6.150) |
| TP out | = 4.546 × (1 − 75.01 / 100) |
| = 1.136 kg/yr (program 1.136). |
The program’s Equations page
5Files
- retention-specified-removal.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- retention-specified-removal.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Retention (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Retention — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.