All programs › BMPFast › Sample problems
BMPs in series: wet pond with stormwater harvesting
BMPFast sample project Example Problem 4: wet detention → harvesting, Net Improvement.
Help: BMPs in Series (help page 504) · Download the .bmpt · Link to Solution in BMPFast Version 2
1The problem
The BMPFast sample project Example Problem 4: a wet detention pond whose water is also harvested for irrigation.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 5 | Zone map (help page 815) |
| Mean annual rainfall | 61 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Net Improvement | BMPFast sample project |
| Catchment 1: catchment #1 (Watershed Characteristics) | ||
| Land use, pre / post | Highway / Highway | BMPFast sample project |
| Area, pre / post | 5.5 / 5.5 ac | BMPFast sample project |
| Non-DCIA curve number, pre / post | 80 / 80 | BMPFast sample project |
| DCIA, pre / post | 40 / 85 % | BMPFast sample project |
| EMC TN, pre / post | 1.250 / 1.250 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.173 / 0.173 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Wet pond area (no loading) | 0.50 ac | BMPFast sample project |
| BMPs in Series (Multiple BMP) | ||
| BMP 1: Wet Detention | permanent pool 2.472 ac-ft, littoral zone yes | BMPFast sample project |
| BMP 2: Stormwater Harvesting | 1.00 ac-ft, 0.80 in/week over 3.00 ac | BMPFast sample project |
Find: the removal of the series as one system, and the loads leaving the site.
2Steps in BMPFast
Press Open Project and open
series-pond-harvesting.bmpt(the file under Files; it is the BMPFast sample project Example Problem 4 wet pond with harvesting.bmpt). General Site Information (the main window; its title bar reads General Site Information and your license key) shows Florida Zone 5, 61.0 in of rainfall and the performance standard Net Improvement.
General Site Information (the main window). Press 1. Enter Catchment to see the catchment (nothing to change). Press Back.

Watershed Characteristics Worksheet (1. Enter Catchment). BMP 1, Wet Detention, is defined on its own worksheet; this pond has a Floating Wetland/MAPs credit of 10 %. Do not open its worksheet for this problem: in the current build, opening the Wet Detention worksheet of a pond with a littoral zone sets the credit to 0 (reported for correction).
Press 2. Enter Treatment and open Stormwater Harvesting: BMP 2 of the series is defined on its own worksheet. Press Calculate, then Back.

BMP 2 of the series on its own worksheet. On Treatment Options press BMPs in Series. BMP 1 to BMP 2 read Wet Detention → Stormwater Harvesting. Press Calculate.

BMPs in Series (Multiple BMP) worksheet. Calculate opens the series report: each BMP’s inputs and the system’s removal.

The BMPs in Series report that Calculate opens. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Multiple BMP as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

The Summary Report (4. Summary Report) in the Report Viewer.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.417 / 0.710 |
| Runoff, pre / post | 11.659 / 18.046 ac-ft/yr |
| TN load, pre / post | 17.969 / 27.813 kg/yr |
| TP load, pre / post | 2.487 / 3.849 kg/yr |
| Multiple BMP: computed by BMPFast | |
| Hydraulic capture efficiency | 52.69 % |
| Provided TN / TP removal | 74.55 % / 86.51 % |
| TN load in → out | 27.813 → 7.079 kg/yr |
| TP load in → out | 3.849 → 0.519 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 27.813 → 7.079 kg/yr |
| TP load: catchments → outlet | 3.849 → 0.519 kg/yr |
| Provided removal TN / TP | 74.5 % / 86.5 % |
| Required removal TN / TP (Maximum % Removal) | 35.4 % (met) / 35.4 % (met) |
The BMPs in Series Equations report
Open this report on its own page.
The Summary Report
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.710 × 5.00 ac × 61.0 in / 12 | |
| = 18.046 ac-ft/yr (program 18.046). |
| TN load | = EMC × runoff × 1.233 |
| = 1.250 × 18.046 × 1.233 | |
| = 27.813 kg/yr (program 27.813) |
| TP load | = 0.173 × 18.046 × 1.233 |
| = 3.849 kg/yr (program 3.849). |
1.233 kg is 1 mg/L in 1 ac-ft.
Wet Detention → Stormwater Harvesting. Water is pumped from the pond for irrigation; what is used never leaves. The harvesting removes 52.69 % of the runoff (REV curves), and the pond treats what overflows. Together TN 74.55 % and TP 86.51 % (Harvesting and Greenroof Methodology).
Load out.
| TN out | = load in × (1 − removal) |
| = 27.813 × (1 − 74.55 / 100) | |
| = 7.079 kg/yr (program 7.079) |
| TP out | = 3.849 × (1 − 86.51 / 100) |
| = 0.519 kg/yr (program 0.519). |
5Files
- series-pond-harvesting.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
- BMPs in Series: Equations (as BMPFast shows it)
- Summary Report (as BMPFast shows it)
- BMP report (worksheet) (as BMPFast shows it)
6Help and methodology
- BMPs in Series (help page 504)
- Strand Based Routing for Retention in Series (help page 4824)
- Comparison of Methods for Wet Detention Ponds in Series (help page 4869)
- Comparison of Methods for Filters in Series (help page 4825)
- Retention Methodology (help page 4537)
- Wet Detention Methodology (help page 4590)
- All sample problems
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.